• 제목/요약/키워드: fusion magnet

검색결과 61건 처리시간 0.022초

KSTAR 초전도 자석의 운전 안정성에 대한 연구 (Study of Energy Margin and Operating Current Margin of KSTAR Cable-In-Conduit Conductor)

  • 이현정;오영국;김웅채;박수환;김형찬;김기만
    • Progress in Superconductivity
    • /
    • 제8권2호
    • /
    • pp.193-201
    • /
    • 2007
  • Since the margins for the minimum quench energy and for the operating current in the superconducting magnet determine the operating regime of the magnet, a thermal stability analysis for the KSTAR superconducting magnet system is performed using 1-D Gandalf code. The result shows that the minimum quench energy is about 500 mJ/cc and the operating current margin is about 70 %. These values are larger than those of the KSTAR design criteria and the KSTAR superconducting magnet system can be operated stably under various experimental environments.

  • PDF

DESIGN OF A BENDING MAGNET FOR THE KSTAR NBI SYSTEM

  • In, Sang-Ryul;Yoon, Byeong-Joo;Kim, Beom-Yeol
    • Nuclear Engineering and Technology
    • /
    • 제38권8호
    • /
    • pp.793-802
    • /
    • 2006
  • The design concept of a bending magnet to be installed in the KSTAR NBI system is presented. It is the function of a bending magnet that removes unconverted ions from the main beam stream and produces an 8 MW, 120 keV deuterium neutral beam. In order to determine the proper size and shape of the bending magnet, a parametric study on the B-field pattern was carried out by changing the dimensions of the pole face model. In addition, the detailed trajectories of the dominant ion species produced in the beam line were calculated. The electrical and cooling parameters of the coil assembly were also estimated.

중성자 입사장치(NBI)용 휨 전자석(Bending Magnet)의 성능 시험 (A test of the Bending Magnet on Neutral Beam Injection System)

  • 전용우;오병훈;장두희;정기석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.355-358
    • /
    • 2003
  • 본 연구에서는 차세대 초전도 핵융합장치(KSTAR)의 가열장치인 중성입자입사장치(NBI : Neutral Beam Injection) 시스템 중 휨 전자석(Bending magnet)의 중요한 파라메타인 전류에 따른 온도상승값과 B-field의 측정을 행하고 그 결과를 나타내었다. 휨 전자석(Bending magnet)은 중성입자입사장치(NBI) 시스템 중 중성화장치(Neutralizer) 후단에 설치되어, 미처 중성화되지 못한 이온들의 케도를 변경시켜 중성입자와 분리되도록 한 후 이온덤프에서 이들 이온들의 에너지가 흡수될 수 있도록 하는 역할을 한다. 사용전원은 15[V], 1200[A]의 가변전원을 사용하였고 전류값 변화에따른 온도상승값은 thermo couple 신호선을 이용하여 측정하였으며, B-field는 3차원 Gaussmeter를 이용하여 측정을 행하였다. 측정된 결과들은 설계시의 값과 비교분석을 행하여 오차를 줄여나가고자 하였고 향후 NBI 주 진공용기에 장착하여 중성입자입사장치의 개발 수행을 행하게 될 것이다.

  • PDF

OVERVIEW OF SUPERCONDUCTING MAGNET POWER SUPPLY SYSTEM FOR THE KSTAR 1ST PLASMA EXPERIMENT

  • Choi, Jae-Hoon;Yang, Hyung-Lyeol;Ahn, Hyun-Sik;Jang, Gye-Yong;Lee, Dong-Keun;Kim, Kuk-Hee;Hahn, Sang-Hee;Kim, Chang-Hwan;Hong, Jae-Sic;Chu, Yong;Kong, Jong-Dae;Hong, Seong-Lok;Hwang, In-Sung
    • Nuclear Engineering and Technology
    • /
    • 제40권6호
    • /
    • pp.459-466
    • /
    • 2008
  • The KSTAR Magnet Power Supply (MPS) was dedicated to the SC coil commissioning and $1^{st}$ plasma experiment as a part of the system commissioning. Although many efforts to develop large-current power supplies that are useful for high power electronic devices have been made in various application fields, such as for large metal-plating devices, there were clear discrepancies between conventional power supply technologies and that for the SC coils due to the special SC coil load conditions. Therefore, most of the power supply technologies for the SC coils were a challenge in the domestic research area due to their limited application. However, the MPS commissioning result showed that all of the hardware and controlling software operated well, and this result finally led to the success of SC coil commissioning and the KSTAR $1^{st}$ plasma experiment. This paper will describe key features of KSTAR MPS for the $1^{st}$ plasma experiment, and will also report the commissioning results of the magnet power supplies.

Superconducting Magnet Power Supply System for the KSTAR 2nd Plasma Experiment and Operation

  • Choi, Jae-Hoon;Lee, Dong-Keun;Kim, Chang-Hwan;Jin, Jong-Kook;Han, Sang-Hee;Kong, Jong-Dae;Hong, Seong-Lok;Kim, Yang-Su;Kwon, Myeun;Ahn, Hyun-Sik;Jang, Gye-Yong;Yun, Min-Seong;Seong, Dae-Kyung;Shin, Hyun-Seok
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권2호
    • /
    • pp.326-330
    • /
    • 2013
  • The Korea Superconducting Tokamak Advanced Research (KSTAR) device is an advanced superconducting tokamak to establish scientific and technological bases for attractive fusion reactor. This device requires 3.5 Tesla of toroidal field (TF) for plasma confinement, and requires a strong poloidal flux swing to generate an inductive voltage to produce and sustain the tokamak plasma. KSTAR was originally designed to have 16 serially connected TF magnets for which the nominal current rating is 35.2 kA. KSTAR also has 7 pairs of poloidal field (PF) coils that are driven to 1 MA/sec for generation of the tokamak plasma according to the operation scenarios. The KSTAR Magnet Power Supply (MPS) was dedicated to the superconducting (SC) coil commissioning and $2^{nd}$ plasma experiment as a part of the system commissioning. This paper will describe key features of KSTAR MPS for the $2^{nd}$ plasma experiment, and will also report the engineering and commissioning results of the magnet power supplies.

KSTAR장치의 TF MPS 냉각수시스템 시운전 결과 (The Test Result of Cooling Water System for KSTAR TF MPS)

  • 김영진;김상태;임동석;정남용;김동진;최재훈;이동근;김양수;박주식;이용운
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.413-418
    • /
    • 2008
  • The toroidal field magnet power supply (TF MPS) for the KSTAR was constructed in August, 2007 and started the operation for the commissioning in March, 2008. The main role of the TF MPS is to supply the electric power to the TF magnet of the KSTAR. The water cooling components of the TF MPS are 16 stacks, busbar of 70 meters. For the cooling of the TF MPS, the D I water cooling system was designed and installed. The water cooling system consists of several pumps, heat exchangers, D I water polishing system and so on. The water cooling system for the TF MPS was tested under the 15 kA current charging condition. In this paper be discussed about the system performance and other parameters.

  • PDF

COMMISSIONING RESULT OF THE KSTAR HELIUM REFRIGERATION SYSTEM

  • Park, Dong-Seong;Chang, Hyun-Sik;Joo, Jae-Joon;Moon, Kyung-Mo;Cho, Kwang-Woon;Kim, Yang-Soo;Bak, Joo-Shik;Cho, Myeon-Chul;Kwon, Il-Keun;Andrieu, Frederic;Beauvisage, Jerome;Desambrois, Stephane;Fauve, Eric
    • Nuclear Engineering and Technology
    • /
    • 제40권6호
    • /
    • pp.467-476
    • /
    • 2008
  • To keep the superconducting (SC) magnet coils of KSTAR at proper operating conditions, not only the coils but also other cold components, such as thermal shields (TS), magnet structures, SC bus-lines (BL), and current leads (CL) must be maintained at their respective cryogenic temperatures. A helium refrigeration system (RRS) with an exergetic equivalent cooling power of 9 kW at 4.5 K without liquid nitrogen ($LN_2$) pre-cooling has been manufactured and installed. The main components of the KST AR helium refrigeration system (HRS) can be classified into the warm compression system (WCS) and the cryogenic devices according to the operating temperature levels. The process helium is compressed from 1 bar to 22 bar passing through the WCS and is supplied to cryogenic devices. The main components of cryogenic devices are consist of cold box (C/B) and distribution box (D/B). The C/B cool-down and make the various cryogenic helium for the KSTAR Tokamak and the various cryogenic helium is distributed by the D/B as per the KSTAR requirement. In this proceeding, we will present the commissioning results of the KSTAR HRS. Circuits which can simulate the thermal loads and pressure drops corresponding to the cooling channels of each cold component of KSTAR have been integrated into the helium distribution system of the HRS. Using those circuits, the performance and the capability of the HRS, to fulfill the mission of establishing the appropriate operating condition for the KSTAR SC magnet coils, have been successfully demonstrated.

KSTAR 전류인입선 및 헬륨냉매 제어시스템 제작 및 설치 (Construction and Assembly of KSTAR Current Leads and the Helium Control System)

  • 송낙형;우인식;이영주;곽상우;방은남;이근수;김정수;장용복;박현택;홍재식;박영민;김양수;최창호
    • 한국진공학회지
    • /
    • 제16권5호
    • /
    • pp.388-396
    • /
    • 2007
  • KSTAR (Korea Superconducting Tokamak Advanced Research) 전류인입선(CL; Current Lead)은 4.5 K의 저온에서 운전되는 초전도 버스라인과 300 K의 실온에서 운전되는 MPS (Magnet Power Supply)를 전기적으로 연결하는 장치이다. 초기 플라즈마 발생시험을 위하여 TF (Toroidal Field) 및 PF (Poloidal Field) 리드박스에 전류인입선이 설치된다. TF 자석용 CL은 17.5 kA급 4 개의 CL에 최대 35 kA의 DC 전류가 인가되며, PF 자석용은 13 kA급 14 개의 CL에 350초간 $20\;{\sim}\;26\;kA$의 펄스 전류가 인가된다. 각각의 전류인입선은 TF 및 PF 자석에 전류를 인가하기 위한 버스라인이 연결되어 있으며, 전류인입선을 통해 초전도 버스라인으로 전달되는 전도열 및 전류인가시 발생되는 주울(Joule) 열을 차단하기 위한 헬륨냉매 제어시스템이 KSTAR 주장치와는 별도로 설치되어 있다. 리드박스 내 외부의 배관 및 제어시스템 설치완료 후 고진공 배기, 헬륨 누설검사, 전류인입선 유량 검사 및 액체질소 냉각시험을 실시하여 장치의 성능검증을 완료하였다.