• Title/Summary/Keyword: four operation

Search Result 2,254, Processing Time 0.037 seconds

A Construction Theory of Arithmetic Operation Unit Systems over $GF(2^m)$ ($GF(2^m)$ 상의 산술연산기시스템 구성 이론)

  • 박춘명;김흥수
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.27 no.6
    • /
    • pp.910-920
    • /
    • 1990
  • This paper presents a method of constructing an Arithmetic Operation Unit Systems (A.O.U.S.) over Galois Field GF(2**m) for the purpose of the four arithmetical operation(addition, subtraction, multiplication and division between two elements in GF(2**mm). The proposed A.O.U.S. is constructed by following procedure. First of all, we obtained each four arithmetical operation algorithms for performing the four arithmetical operations using by mathematical properties over GF(2**m). Next, for the purpose of realizing the four arithmetical unit module (adder module, subtracter module, multiplier module and divider module), we constructed basic cells using the four arithmetical operation algorithms. Then, we realized the four Arithmetical Operation Unit Modules(A.O.U.M.) using basic cells and we constructd distributor modules for the purpose of merging A.O.U.M. with distributor modules. Finally, we constructed the A.O.U.S. over GF(2**m) by synthesizing A.O.U.M. with distributor modules. We prospect that we are able to construct an Arithmetic & Logical Operation Unit Systems (A.L.O.U.S.) if we will merge the proposed A.O.U.S. in this paper with Logical Operation Unit Systems (L.O.U.S.).

  • PDF

Four-Quadrant Operation of a Single-Switch-based Switched Reluctance Drive (단일 스위치 기반의 4상한 운전 SRM 드라이브)

  • Ha, Keun-Soo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.338-343
    • /
    • 2010
  • Low cost motor drives are being sought for high volume energy efficient home appliances. Key to the realization of such low cost motor drives is to reduce the power electronic converter in terms of its components, particularly the active devices, finding the motor with least complexity for manufacturing and a controller that could extract the desired performance from the machine and converter combination. These and other factors such as self-starting, speed control over a wide range and most of all the crowning aspect of a four quadrant operation with bare minimum number of controllable switch (or switches) remain as formidable challenges for low cost motor drive realization. In this paper, a four quadrant switched reluctance motor (SRM) drive with only one controllable switch is realized by using a two-phase machine. The theory and operation of the proposed four-quadrant SRM drive with the proposed control algorithm for its realization are described. The motor drive is modeled, simulated and analyzed to verify its feasibility for self-starting, speed control and for four quadrant operation and the simulation results are presented. Experimental results confirm the validity of the proposed control algorithm for four quadrant control of the SRM drive. The focus of the paper is mainly directed toward the control algorithm for realizing the four-quadrant operation of the two-phase SRM drive with a single controllable switch converter.

A Study on Prediction of Suspension Time of Unmanned Light Rail according to Safety Personal Deployment (안전요원 배치 여부에 따른 무인운전 경전철의 운행중단 시간예측 연구)

  • Sang Log Kwak
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.1
    • /
    • pp.87-92
    • /
    • 2023
  • The number of unmanned light rail train operators is continuously increasing in Korea. In a failure event during an operation due to the nature of the unmanned operation, recovery is performed based on the remote control. However, if remote recovery is not feasible, safety personnel arrive at the train to resume the train operation. There are regulations on safety personnel and the suspension time of the train operation. However, there is currently no rule for safety personnel deployment. Currently, railway operating organizations operate in three scenarios: safety personnel on board trains, stationed at stations, and deployed at major stations. Four major factors influence the downtime for each emergency response scenario. However, these four influencing factors vary too much to predict results with simple calculations. In this study, four influencing factors were considered as random variables with high uncertainty. In addition, the Monte Carlo method was applied to each scenario for the safety personnel deployment to predict train service downtime. This study found a 17% difference in train service suspension by safety personnel deployment scenario. The results of this study can be used in setting service goals, such as standards for future safety personnel placement and frequency of service interruptions.

Hemiarthroplasty for Fractures or Fracture-Dislocations of the Proximal Humerus (상완골 근위부 골절 또는 골절 및 탈구에서의 상완골 두 치환술)

  • Kim Young Kyu;Eom Gi Serk
    • Clinics in Shoulder and Elbow
    • /
    • v.3 no.1
    • /
    • pp.20-25
    • /
    • 2000
  • Purpose : To evaluate functional results and study factors influencing results after humeral hemiarthroplasty for comminuted fractures of the proximal humerus. Materials and Methods: We reviewed 12 patients with average follow-up period of 23 months(12 to 42). The proximal humeral fractures consisted of one anatomical neck fracture, five three-part and six four-part fractures or fracture-dislocations. Constant score and Compito et al' evaluation system were used for clinical assessment. Statistical analysis was done with the Wilcoxon test. Results: Six cases of anatomical neck, three-part fractures or fracture-dislocations showed 61 points on the average Constant score and three unsatisfactory results on the Compito et al' evaluation; Six of four-part fractures or fracture-dislocations showed 51 points and three unsatisfactory results. There were 59(two unsatisfactory) for five non-associated dislocation and 53(four unsatistactory) for seven associated dislocation; 66(one unsatisfactory) for three under 60 years and 41(five unsatisfactory) for nine over 60 years; 67(two unsatisfactory) for seven tuberosity union and 41(four unsatisfactory) for five tuberosity non-union or resorption; 58(four unsatisfactory) for ten early operation within two weeks and 43(all unsatisfactory) for two delayed operation; and 18(unsatisfactory) for one case of a accompanied rotator cuff tear. Conclusion: We concluded that tuberosity union was important factor influencing the results. Also, we thought that age, timing of operation and accompanied rotator cuff tear could be influenced to results.

  • PDF

Development of the Quality of Service management program using the fourth generation language (제4세대 언어를 사용한 서비스품질 관리 프로그램의 개발)

  • 박순달;정호연;서정대;김태호
    • Korean Management Science Review
    • /
    • v.9 no.1
    • /
    • pp.41-52
    • /
    • 1992
  • The QOS(Quality of Service) recognized by the customer will become the most important thing under the competitive telecommunications market. Korea Telecom is going to develop many system to manage the telecommunication network, to improve the level of QOS, and to increase the revenue. Operation and Maintenance Adiministration System is one of the systems developed to meet those purposes efficiently. This system gathers qualities data from telephone offices or operation centers and analyze the results of QOS improvement activities and evaluate overall QOS. And also system makes it possible to improve the cost/effectiveness of operation and maintenance of telecommunication network. Operation and Maintenance Administration System has four functional modules, i.e., the user interface module, the database management module, the QOS management module, and the database conversion module. The purpose of this study is to develop the QOS management program, one of the four functional modules of the system,using FOCUS 4GL/DBMS. Since Operation and Maintenance Administration System is developed using FOCUS 4GL, every user can handle and maintain the system very easily and reduce system backlogs.

  • PDF

A1gorithm Embodiment for Automatic Pump Operation Pattern (원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현)

  • Byun, Doo-Gyoon;Yoon, Young-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF

A Four-Channel Laser Array with Four 10 Gbps Monolithic EAMs Each Integrated with a DBR Laser

  • Sim, Jae-Sik;Kim, Sung-Bock;Kwon, Yong-Hwan;Baek, Yong-Soon;Ryu, Sang-Wan
    • ETRI Journal
    • /
    • v.28 no.4
    • /
    • pp.533-536
    • /
    • 2006
  • A distributed Bragg reflector (DBR) laser and a high speed electroabsorption modulator (EAM) are integrated on the basis of the selective area growth technique. The typical threshold current is 4 to 6 mA, and the side mode suppression ratio is over 40 dB with single mode operation at 1550 nm. The DBR laser exhibits 2.5 to 3.3 mW fiber output power at a laser gain current of 100 mA, and a modulator bias voltage of 0 V. The 3 dB bandwidth is 13 GHz. A 10 Gbps non-return to zero operation with 12 dB extinction ratio is obtained. A four-channel laser array with 100 GHz wavelength spacing was fabricated and its operation at the designed wavelength was confirmed.

  • PDF

Recurrent Peroneal Tendon Dislocation - Four cases report - (만성 습관성 비골 건 탈구 - 4예 보고 -)

  • Kang, Ho-Jung;Kwon, Oh-Ryong;Shim, Dong-Joon;Kang, Eung-Shick;Hahn, Soo-Bong
    • Journal of Korean Foot and Ankle Society
    • /
    • v.6 no.1
    • /
    • pp.100-105
    • /
    • 2002
  • Purpose: The purpose of this study is to report four operative cases of recurrent peroneal tendon dislocation being effectively treated by superior peroneal retinaculum reconstructive operation and rerouting of calcaneofibular ligament. Materials and Methods: Four male adults with recurrent peroneal tendon dislocation including one of patient with redislocation after the treatment of plication of inferior peroneal retinaculum were followed up after being treated with superior peroneal retinaculum reconstructive operation using Achilles tendon and rerouting of calcaneofibular ligament. Results: All patients followed up for over one year revealed no pain and no redislocation. One patient who experienced redislocation after the treatment of plication of inferior peroneal retinaculum had no other complication after the treatment of superior peroneal retinaculum reconstructive operation using Achilles tendon. Conclusion: The reconstructive operation presumed to be effective for recurrent peroneal tendon dislocation.

  • PDF

Z-Source Four-Switch Three-Phase PWM Rectifier with Wide DC Output Voltage Control Region (넓은 직류 출력전압 제어영역을 갖는 Z-소스 Four-Switch 3상 PWM 정류기)

  • Zhu, Sha;Jung, Young-Gook;Lim, Young-Cheol
    • Proceedings of the KIPE Conference
    • /
    • 2013.07a
    • /
    • pp.275-276
    • /
    • 2013
  • In this paper, we proposed the Z-source four-switch three-phase rectifier. As we know, the conventional Four-Switch Three-Phase Rectifier(FSTPR) has advantages of the lower cost and less complex switching control. However, The conventional FSTPR can only either perform buck or boost operation, it can only attain the buck-boost operation by adding another DC-DC converter. In addition, besides its narrow output voltage region, distortion of the input current is serious either. Thus, we proposed the Z-source FSTPR which has buck-boost function and better input current waveform by applying the Z-impedance network to the conventional FSTPR. The validity of the proposed system was confirmed by experiments.

  • PDF

Aperture-Coupled Microstrip Antenna with Four Slits and T-Slits for Compact Circular Polarization Operation (슬릿이 부설된 소형 원편파 개구결합 마이크로 스트립 안테나)

  • 김영두;김호용;이홍민
    • Proceedings of the IEEK Conference
    • /
    • 2003.11c
    • /
    • pp.327-330
    • /
    • 2003
  • A novel compact circular polarization operation of the microstrip antenna with four-slits and T-slits is proposed. The mechanism for compact size antenna is investigated with the behavior of the currents on the radiating patch. The equivalent surface current path due to the slits is lengthened, reducing the resonant frequency at a fixed patch size. The proposed compact CP design can have an antenna size reduction of about 33 ∼ 45% as compared to the conventional microstrip antenna. Details of the experimental and measured results are presented and analysed.

  • PDF