• Title/Summary/Keyword: foundation-ground system

Search Result 190, Processing Time 0.025 seconds

A Study on Development of a Ground-Source Heat Pump System Utilizing Pile Foundation of a Building (건물 기초를 이용한 지중열 공조시스템의 개발에 관한 연구 (1))

  • Ryozo, Ooka;Nam, Yu-Jin;Kentaro, Sekine;Mutsumi, Yokoi;Yoshiro, Shiba;Hwang, Suck-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.148-154
    • /
    • 2005
  • Ground-source (Geothermal) heat pump (GSHP) systems can achieve a higher coefficient of performance than conventional air-source heat pump (ASHP) systems. However, GSHP systems are not widespread in Japan because of their expensive boring costs. The authors have developed a GSHP system that employs the cast-in-place concrete pile foundations of a building as heat exchangers in order to reduce the initial boring cost. In this system, eight U-tubes are arranged around the surface of a cast-in-place concrete pile foundation. The heat exchange capability of this system, subterranean temperature changes and heat pump performance were investigated in a foil-scale experiment. As a result, the average values for heat rejection were 186${\sim}$201 W/m (for pile, 25 W/m per Pair of tubes) while cooling. The average COP of this system was 4.6 while cooling; rendering this system more effective in energy saving terms than the typical ASHP systems. The initial cost of construction per unit for heat extraction and rejection is ${\yen}$72/W for this system, whereas it is f300/W for existing standard borehole systems.

  • PDF

Measurements and analysis of load sharing between piles and raft in a pile foundation in clay

  • Watcharasawe, Kongpop;Jongpradist, Pornkasem;Kitiyodom, Pastsakorn;Matsumoto, Tatsunori
    • Geomechanics and Engineering
    • /
    • v.24 no.6
    • /
    • pp.559-572
    • /
    • 2021
  • This research presents the monitoring results and their interpretation on load sharing of the pile foundation during the construction of a high-rise (124 m in height) building in Bangkok, in soft clayey ground. Axial forces in several piles, pore water pressure and earth pressures beneath the raft in a tributary area were monitored through the construction period of the building. The raft of the pile foundation in soft clayey ground can share the load up to 10-20% even though the foundation was designed using the conventional approach in which the raft resistance is ignored. The benefit from the return of ground water table as the uplift pressure is recognized. A series of parametric study by 3D-FEA were carried out. The potential of utilizing the piled raft system for the high-rise building with underground basement in soft clayey ground was preliminarily confirmed.

The behavior of breakwaters utilizing buoyancy for soft ground (부력을 이용한 연약지반용 방파제의 거동분석)

  • Yun, Hee-Suk;Jang, In-Sung;Kwon, O-Soon;Lee, Sun-Jae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.300-310
    • /
    • 2008
  • A series of numerical simulations on the several types of breakwaters on the foundation systems utilizing buoyancy were carried out in plane-strain conditions using the modified Cam-Clay model and the Biot's consolidation theory. Improved foundation system by the replacement of original ground with light weighted material, expandable poly-styrene (called below EPS) and several foundation systems with buoyant cells were used. From the results of numerical simulations we found that the foundation systems utilizing buoyancy are efficient to reduce the maximum consolidation settlements without reducing lateral safety.

  • PDF

Performance Monitoring Study of Building Integrated Geothermal System in Winter (건물일체형 지열시스템의 동계 성능 모니터링 연구)

  • Yu, Hyung-Kyu;Bae, Sang-Hwan
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.6 no.1
    • /
    • pp.23-28
    • /
    • 2010
  • The objective of this study is to develope ground heat exchanger using PHC pile used to building foundation, and it's element technology. So we made PHC piles into ground heat exchanger and evaluate it's performance. First, we studied PHC pile type, heat exchanger pipe, grouting materials, and present apartment house's foundation condition for PHC ground heat exchanger. As a result we designed BIGS(Building Integrated Geothermal System) prototype. Second, we applied BIGS to apartment houses' utility building in Osan built by Daelim. Third, we monitored heating performance of winter season. 1be result of heating performance was so good to apply to heat & cooling system in building.

Response of a rectangular plate-column system on a tensionless Winkler foundation subjected to static and dynamic loads

  • Guler, K.;Celep, Z.
    • Structural Engineering and Mechanics
    • /
    • v.21 no.6
    • /
    • pp.699-712
    • /
    • 2005
  • The response of a plate-column system having five-degree-of-freedom supported by an elastic foundation and subjected to static lateral load, harmonic ground motion and earthquake motion is studied. Two Winkler foundation models are assumed: a conventional model which supports compression and tension and a tensionless model which supports compression only. The governing equations of the problem are obtained, solved numerically and the results are presented in figures to demonstrate the behavior of the system for various values of the system parameters comparatively for the conventional and the tensionless Winkler foundation models.

A Study on Development of a Ground-Source Heat Pump System Utilizing Pile Foundation of a Building (건물 기초를 이용한 지중열 공조시스템의 개발에 관한 연구 (2))

  • Ryozo, Ooka;Hwang, Suk-Ho;Kentaro, Sekine;Yosuke, Shimawaki;Nam, Yu-Jin
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.155-160
    • /
    • 2005
  • To purpose of this research is to develop the numerical model for simulating performance of ground heat exchanger with high prediction accuracy. This paper describes the development of a numerical model that simulates the heat transfer between ground and circulation water in ground heat exchanger. Furthermore, we propose the estimating technique of soil properties, such as thermal conductivity, heat capacity and hydraulic conductivity, based on ground investigation. Comparison between experiment and numerical analysis based on the model developed above was conducted under the condition of the experiment in 2004. The result of analysis agreed well with the experimental result.

  • PDF

Optimal design of stone columns reinforced soft clay foundation considering design robustness

  • Yu, Yang;Wang, Zhu;Sun, HongYue
    • Geomechanics and Engineering
    • /
    • v.22 no.4
    • /
    • pp.305-318
    • /
    • 2020
  • Stone columns are widely used to treat soft clay ground. Optimizing the design of stone columns based on cost-effectiveness is always an attractive subject in the practice of ground treatment. In this paper, the design of stone columns is optimized using the concept of robust geotechnical design. Standard deviation of failure probability, which is a system response of concern of the stone column-reinforced foundation, is used as a measure of the design robustness due to the uncertainty in the coefficient of variation (COV) of the noise factors in practice. The failure probability of a stone column-reinforced foundation can be readily determined using Monte Carlo simulation (MCS) based on the settlements of the stone column-reinforced foundation, which are evaluated by a deterministic method. A framework based on the concept of robust geotechnical design is proposed for determining the most preferred design of stone columns considering multiple objectives including safety, cost and design robustness. This framework is illustrated with an example, a stone column-reinforced foundation under embankment loading. Based on the outcome of this study, the most preferred design of stone columns is obtained.

Top shoes foot pressure basis of the comparison analysis combine conical top foundation walking upon ground conditions (보행시 지반조건에 따른 팽이기초를 접목시킨 신발 족저압 분포 비교분석)

  • Kim, Yeon-Deok;Kim, Seg-Jin;Min, Byeong-Heon;Kim, Sang-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.20-28
    • /
    • 2019
  • This study comparatively analyzes general walking shoes on the conical top foundation of the ground condition and the pressure distribution during walking with shoes that are currently under development. Two categories of footwear were used: general footwear and a footwear conical top foundation that is currently under development. Experiments were carried out on hard ground and sandy soil in 15 male twenties that satisfy the conditions of normal foot wearing 260 mm. The pressure during walking was measured using Techstorm's Wireless Insole System, and foot pressure was measured in 7 zones of the foot. Studies have shown different maximum forces, average pressures, and pressure distributions depending on the shoe and ground conditions. This study shows that shoes with general low pressure dispersion effects depending on the feet in hard ground and sand ground are different from shoes with the conical top foundation that is currently under development. It is expected that it will be useful for the development of shoes that can be worn in all hard ground and sandy ground by selecting various rubber materials through further research.

Seismic responses of transmission tower-line system under coupled horizontal and tilt ground motion

  • Wei, Wenhui;Hu, Ying;Wang, Hao;Pi, YongLin
    • Earthquakes and Structures
    • /
    • v.17 no.6
    • /
    • pp.635-647
    • /
    • 2019
  • Tests and theoretical studies for seismic responses of a transmission tower-line system under coupled horizontal and tilt (CHT) ground motion were conducted. The method of obtaining the tilt component from seismic motion was based on comparisons from the Fourier spectrum of uncorrected seismic waves. The collected data were then applied in testing and theoretical analysis. Taking an actual transmission tower-line system as the prototype, shaking table tests of the scale model of a single transmission tower and towers-line systems under horizontal, tilt, and CHT ground motions were carried out. Dynamic equations under CHT ground motion were also derived. The additional P-∆ effect caused by tilt motion was considered as an equivalent horizontal lateral force, and it was added into the equations as the excitation. Test results were compared with the theoretical analysis and indicated some useful conclusions. First, the shaking table test results are consistent with the theoretical analysis from improved dynamic equations and proved its correctness. Second, the tilt component of ground motion has great influence on the seismic response of the transmission tower-line system, and the additional P-∆effect caused by the foundation tilt, not only increases the seismic response of the transmission tower-line system, but also leads to a remarkable asymmetric displacement effect. Third, for the tower-line system, transmission lines under ground motion weaken the horizontal displacement and acceleration responses of transmission towers. This weakening effect of transmission lines to the main structure, however, will be decreased with consideration of tilt component.

A Retrospection on Foundation Design of Taipei 101

  • Chin, Chung-Tien;Chao, Hsiao-Chou;Chang, Der-Wen
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.145-156
    • /
    • 2009
  • Large diameter bored pile was selected as the foundation type for Taipei 101. The pile construction method and specific construction procedures were determined based on the results of trial installation and pile load tests. The baseline for foundation design was established using the friction versus depth characteristics of each ground layer obtained from the pile load tests. As the ground profile and depth to the top of rock formation varied significantly on this site, the pile length, bearing capacity and settlement for single pile were analyzed using the information interpreted from adjacent boreholes. The post grouting at pile tip was mandatory for pile construction. Nevertheless, it was treated as a measure reducing the influence of construction uncertainties and providing extra safety for the foundation system.

  • PDF