• Title/Summary/Keyword: formwork

검색결과 272건 처리시간 0.026초

초고층 골조공사의 바닥 거푸집별 생산성 분석;기준층 3일 공정을 중심으로 (The Productivity Analysis by Slab Formwork of Structural Frame Work in Tall Building Construction)

  • 김태훈;신윤석;조성수;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 추계 학술논문 발표대회
    • /
    • pp.115-118
    • /
    • 2007
  • A tall building construction is needed to reduce the construction duration for project profitability. Reducing the cycle time of typical floor in the structural frame work which have the largest duration in the whole construction, greatly affects construction duration. Nowadays, some projects are accomplished in the 3 day cycle. In order to accomplish efficiently 3 day cycle, productivity information of similar projects is supported. Therefore, this study proposed labor productivity and application by slab formwork to construct by the 3 day cycle. In order to perform an analysis, we selected 3 cases and analyzed the labor productivity on the basis of the amount of slab forms, labors, and durations. Then, we performed the questionnaire to analyze the application by formwork of tall building construction engineers. This study will contribute to establish a reasonable scheduling in structural frame work of a new similar project.

  • PDF

PF/R 공법의 문제점 분석을 통한 개선방안에 관한 연구 (A Study on the Improvement of the Prefab Form Re-Bar Method)

  • 최형규;서요셉;박근준;조영준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.377-380
    • /
    • 2007
  • 거푸집공사는 전체 건설공사에서 매우 큰 비중을 차지하고 있는 공종이다. 해외에서는 거푸집 공법과 관련하여 연구개발이 활발히 이러우지고 있고, 다양한 공업도 개발되고 공사비 절감노력이 이루어지고 있으며, 국내에서도 다양한 시도가 이루어지고 있다. 그러나 새로운 거푸집 공법에 대한 체계적인 연구가 부족하여 현장적용에 어려움이 있고, 특히 거푸집 공법의 일종인 PF/R 공법이 건설현장에서 적용되고 있으나, 일부 문제점들이 지적되고 있는 실정이다. 이에 본 연구에서는 PF/R과 기존의 거푸집 공법과의 비교분석을 통해 문제점을 도출하고 해결방안을 제시하였다.

  • PDF

퍼포본드 FRP-콘크리트 합성보의 실험적 연구 (An Experimental Study of Perfobond FRP-Concrete Composite Beam)

  • 유승운;국무성
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제14권2호
    • /
    • pp.121-127
    • /
    • 2010
  • 퍼포본드 FRP 판을 영구 거푸집 및 인장 보강재로 이용한 합성보에 대한 실험을 수행하였다. FRP 판을 영구 거푸집 및 인장 보강재의 합성이용은 재래적인 방법에서 필요한 거푸집 조립 및 탈형 등의 작업이 수반되지 않으므로 빠른 시공이 가능하다. FRP 판과 콘크리트가 합성 구조체로 작용하기 위해서는 FRP 판의 표면처리가 필요하다. 이를 위해 FRP 판에 잔골재를 현장에서 많이 사용하는 에폭시를 이용하여 부착하고 FRP 판의 웨브에 구멍을 천공하였다. 합성보에 추가적인 휨 및 전단보강은 하지 않았다. 비교를 위해 두가지 종류의 비교 실험시편을 제작하였다. FRP 판의 웨브에 구멍을 천공하지 않은 비교 실험시편과 FRP 판 대신에 철근으로 보강한 비교 실험시편이다. 모든 시험체는 중앙에 집중하중을 재하하여 파괴까지 실험하였다. 본 연구 결과 퍼포본드 FRP 판은 콘크리트 구조물의 영구 거푸집 대용 및 인장 보강재로도 활용 할 수 있는 가능성을 보여주었다.

강재 영구거푸집 와이드 보의 시공단계 구조성능 (Structural Performance of Permanent Steel Formed Wide Beams in Construction Stage)

  • 박유나;허인욱;김재현;할리오나;김성배;김강수
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제27권5호
    • /
    • pp.130-138
    • /
    • 2023
  • 이 연구에서는 강재 영구거푸집 와이드 보를 대상으로 시공하중에 대한 실험적‧해석적 연구를 수행하였다. 측면강판의 리브 간격과 고정철물의 깊이를 변수 총 4개의 실험체를 제작하여 실험을 수행하였으며, 변수별 실험체의 구조거동 차이를 상세히 분석하였다. 또한, 실험결과를 기반으로 강재 영구거푸집 와이드 보의 유한요소해석 모델을 제안하였다. 검증된 해석모델을 활용하여 하부 및 측면강판의 리브 간격, 고정철물 간격, 고정철물 깊이 및 두께를 변수로 해석적 연구를 수행하였으며, 이를 통해 최적화된 상세를 도출하였다. 더 나아가 다양한 상세를 가지는 강재 영구거푸집 와이드 보의 변형량을 간단하게 예측할 수 있는 인공신경망 예측모델을 제안하였다.

필러겸용 스포터로 지지되는 전구간 알루미늄 슬래브 거푸집의 저소음 안전낙하 공법개발 및 적용연구 (Development and Implementation of a Low-noise and Safe Dismantling Method for Full-Span Aluminum Slab Formwork Supported by Filler Supports)

  • 임남기
    • 한국건축시공학회지
    • /
    • 제24권2호
    • /
    • pp.261-271
    • /
    • 2024
  • 국내외 건설현장에서 사용빈도가 급격히 증가하고 있는 슬래브용 알루미늄 폼은 탈형시 바닥으로 그대로 떨어뜨리는 경우가 많아 소음으로 인한 주변 민원이 발생하고, 높은 위치에서 떨어지면서 형틀이 변형되거나 바닥에서 튀어 오로면서 주변 인부들에게 상해를 입히기도 하여 중대재해처벌법이 강화되는 현실에서 개선이 절실한 상황이다. 이에 본 연구에서는 공동주택의 1세대 슬래브 거푸집 전체가 동시에 작업자가 펼친 손이 닿는 위치까지 안전하게 낙하되면 자유롭게 분해하여 다음 층으로 인양할 수 있게 함으로써 안전성, 품질, 경제성, 공정이 개선된 필러서포터 존치형 공법으로써 슬래브의 처짐문제 해결 등의 장점을 확인되고 건설신기술을 획득하였으므로 적극적인 시장개척을 통한 적용 활성화가 가능할 것으로 판단된다.

공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스 (Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects)

  • 구교진;조동현;이준호;박상헌;박찬수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.285-286
    • /
    • 2012
  • In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

  • PDF

Design approach for a FRP structural formwork based steel-free modular bridge system

  • Cheng, Lijuan;Karbhari, Vistasp M.
    • Structural Engineering and Mechanics
    • /
    • 제24권5호
    • /
    • pp.561-584
    • /
    • 2006
  • The paper presents results of parametric studies, and an overall approach for the design of a modular bridge system which incorporates a steel-reinforcement free concrete slab cast on top of carbon FRP stiffened deck panels which act as both structural formwork and flexural reinforcement, spanning between hollow box type FRP girders. Results of the parametric studies are highlighted to elucidate important relationships between critical configurational parameters and empirical equations based on numerical studies are presented. Results are discussed at the level of the individual deck and girder components, and as a slab-on-girder bridge system. An overall design methodology for the components and bridge system including critical performance checks is also presented.

자기충전 콘크리트의 거푸집 압력 예측 모델에 대한 검증 실험 (Experiment for Verification of Prediction Model for see Formwork Pressure)

  • 권승희;풍궉지;김재홍
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2009년도 춘계 학술대회 제21권1호
    • /
    • pp.217-218
    • /
    • 2009
  • 기존에 개발되었던 자기충전 콘크리트의 거푸집 예측 모델에 대해 실험을 통한 검증이 이루어졌다. 실험실에서 거푸집 압력을 모사할 수 있는 실험 장비를 제작하였으며, 자기충전 콘크리트에 대해 실험을 수행하였다. 실험결과로부터 각각의 재료에 대해 모델 교정(Calibration)을 수행하였고, 일반적인 타설 조건을 고려한 거푸집 압력 측정 실험과 교정된 모델로 부터 얻은 해석결과를 비교해 보았다. 모델을 구성하는 파라미터는 재하시간에 따라 특정한 경향을 나타내었으며, 해석 값이 측정된 거푸집 압력의 시간에 따른 변화를 정확히 모사하였다.

  • PDF

유로폼과 알루미늄폼의 효율성 분석 (Efficiency Analysis of Euro-Form and Aluminum-form)

  • 김진원;유승규;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.41-44
    • /
    • 2010
  • Presently, the apartment house is being constructed by the very various methods. Among them, the formwork having the process rate of 60~70% of the whole construction work is most important. So this study was analyzed comparing euro-form with aluminium-form in the formwork. A case study is using euro-form and aluminum-form in the framework, inquiry into a similar case construction site of below the 20 floor. Then this case analyzed efficiency; construction period, construction cost, workability. Consequently, the aluminum-form is more effective than the euro-form in the construction site of below the 20 floor.

  • PDF

거푸집 코팅필름에 따른 콘크리트벽의 표면 특성 연구 (Study on the surface characteristics of concrete walls by coating film of formwork)

  • 이윤석;서주영;김완수;이영도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2017
  • In this study, the concept of exposed concrete is basically considered and various expressions of concrete surface texture are verified variously. Based on this comparison, the characteristics of exposed surface of concrete according to the change of coating material applicable to formwork are compared and analyzed. I am trying to find a way to apply exposed concrete in a convenient way, In order to observe the characteristics of concrete exposed surface according to the form material, As the surface is smooth and tight, the surface condition of the concrete is smooth and the pore is small.

  • PDF