The applications of multiple criteria decision making(MCDM) methods were investigated to determine the priority order in forest road construction for timber harvesting and silvicultrual activities in 22 regions. In this paper, MCDM methods have five methods from two kinds of models. The one is non-compensatory preference model including maximin and maximax method; the other is compensatory preference model including simple additive weighting method(SAW), hierarchical additive weighting method(HAW) and technique for order preference by similarity to ideal solution(TOPSIS), SAW and TOPSIS methods turned out to be the most adequate for forest road construction priority order among the five methods tested in this study.
Hwang, Jin Seong;Ji, Byoung Yun;Jung, Do Hyun;Cho, Min Jae
Journal of Korean Society of Forest Science
/
v.104
no.4
/
pp.615-621
/
2015
This study was conducted to analyze accessibility and reduction effect of forest operations cost before and after forest road construction based on actual silvicultural operations in 5 regional forest service(8 management planning district) where forest operations was enacted consistently. The result show the accessibility and the reduction effect of the operation cost, the accessibility of forest operation area within 500 m from forest road or public road increased about 3.2 times after the forest road construction. The reduction effect of the operation cost was averagely 576,000 won/km/year. According to the results, forest road had an effect on improvement of accessibility and reduction effect of forest operation cost. This result could be offered basic information to support policy of forest road expansion.
This study was a med at predicting running speed related to alignment factors of forest road, and recommending the improvement method of forest road construction using the running speed of vehicles. For these purposes, this study proceeds to select forest roads after reviewing the planning papers and maps, to measure the road alignment factors such as longitudinal gradient, width of roadway, radius of curve, length of curve, superelevation, and conditions of road surface on the subject forest road. It was found that the running speed of vehicle on forest road is mainly influenced by the conditions of road surface, radios of curve, compound gradient, length of curve, longitudinal gradient and so on. The average running speed of cargo truck showed lower value than that of the expected speed of 'Forest Road Construction Regulations and Rules', and the average running speed of loaded truck showed 70-85% of the speed of empty truck. According to the road conditions, the changes of running speed can be expressed mathematically in terms of the increment of radius of curve and longitudinal gradient. The results of the study on the running speed of vehicle subject to the alignment of forest roads make it possible for one to judge the quality of the existing and to be constructed forest roads, to select the structure of forest road to improve the running speed of vehicle on forest road.
The critical need of forest road for enchanting the additional values of various forest products, in addition, giving more recreational opportunity to citizen, has been recognized. In this study the present author aimed to ascertain the most effective construction working plan of forest road being tit to Korean geographic condition. To execute this research program, four locations in national forest of Kangweon-do district and other four locations in private forest in Chollabuk-do district both where forest roads have previously been constructed were selected to analyze the effectiveness basing upon the various factors separately or in combination. The results are summarized as follows ; 1. The investment efficiency in forest road construction showed to increase in the area where terrain factors and district social factors rate is high, and to decrease in the area where forest status factors and forest road structure factors rate is high. So in future the Forest Resource Development Model of forest road should take more importance particularly on those area having terrain factor ratio is low. The extractable value of constructed forest road based on forest status factors rate is expected to increase in case of high considerably. 2. To construct of forest road for increasing multiple use of forests, forest road should be construct with priority on area where obtained total score by evaluation factors is high. And these evaluation factors should take possible determine the position of forest road construction. 3. The following five types of forest road basing upon function performance are suggested with regard to the place where road is constructed. (1) Forest Utilization Model ; where forest status factors and forest road structure factors rate are over 60%. (2) Forest Resource Development Model ; where terrain factors, forest status factors, forest road structure factors and district social factors rate are less than 60%. (3) Community Development Model ; where terrain factors, forest road structure factors and district social factors rate are over 60% but forest status factors rate are less than 60%. (4) Recreation and Health Model ; where terrain factors, forest status factors, forest road structure factors and district social factors rate are over 60%. (5) Multiple Use Model ; where both forest status factors and district social factors rate are over 60%.
Journal of the Korean Society of Environmental Restoration Technology
/
v.3
no.1
/
pp.1-9
/
2000
The purpose of this study was to analyze the characteristics of soil erosion on the fill-slope of forest road by elapsed years after road construction. Thirteen plots were established on the fill-slope of the newly-constructed forest road, and surveyed for two years(1997~1998). In these plots, the data about soil erosion, surface runoff, vegetation coverage, slope structural characteristics and rainfall were collected. In 1997, the major causes for soil erosion were found by the correlation coefficients with the amount of surface runoff from the fill-slope, vegetation coverage, slope length, slope degree, total rainfall and max. 1 hour rainfall. But, in 1998, the major causes for soil erosion were vegetation coverage and slope degree. Using the stepwise multiple regression method, in 1997, the amount of soil erosion from the fill-slope was complexly expressed as a exponential function of statistically significant the amount of surface runoff from the fill-slope, total rainfall, slope degree of fill-slope and vegetation coverage, but, in 1998, simply expressed as a exponential function of vegetation coverage.
Kim, Myeong-Jun;Kweon, Hyeong-Keun;Choi, Yeon-Ho;Yeom, In-Hwan;Lee, Joon-Woo
Korean Journal of Agricultural Science
/
v.37
no.3
/
pp.471-479
/
2010
Forest roads of 16,424km have been constructed as infrastructure for efficient management of forest. The demand of forest road have been also increased steadily with SOC conception for forest management and wood production. But, accuracy verification by completion drawing of forest road needed aspects extration of geographic information to sound like forest road construction and completion drawing. However, verification for completion drawing has not ascertained. This study carried out the evaluation for position accuracy about constructed forest road in Chungcheongnam-do for evaluating horizontal position accuracy of completion drawing of forest road. In result, first of distance of completion drawing and real route designed completion drawing longer than the real route as Gongju 83m, Seosan 66m, Nonsan 27m and Dangjin 19m, respectively. Second, RMSE by point-correspondence was 11m~14.7m, buffering analysis appeared difference of 18~24m. Finally, index of shape was the similar completion and real route through 6.5~7.4 and data information of forest road corresponds to be perfect. For such reasons, the existing completion drawings have a problem that it cannot use graphic information for drawing digital map according to the regulation, and there is an urgent need for improvement to solve this problem in the process of design and construction.
This study was conducted to investigate the effects of road on bird community by line transect census method from May 2000 to January 2001 in Mt. Geumsan, Namhae-Gun, Kyeongsangnam-do. Canopy layer was more developed in forest area than road area. Understory vegetation of road area was more developed than forest area. Twenty six and twenty three bird species were observed in road and forest area, respectively, White's thrush and ashy minivet were observed just only in forest area, and Siberian blue robin, blue-and-white flycatcher and gold crest were in road area. The birds being to bush nesting and foraging guilds in road area were more than forest area. It is known that the road construction was negatively affected on bird community. However, road construction would be not so negative on bird community according to the results of thie study. It would be needed the maintenance of upper canopy layer and understory vegetation to reduce negative effect of road on bird communities in forest area.
This study was carried out to investigate the export rate of suspended sediment by different precipitation intensity after forest road construction for torrential streams on three different watersheds with various forest road density(Watershed A : 6.67m/ha, Watershed B : 5.52m/ha, and Watershed C : control) in the Experimental Forest of Kangwon National University. The results were as follows. 1. Closely related to the the amount of rainfall in both 1994 and 1995, the average streanfkiw rate was less than $0.25{\times}10^4m^3/day$ during May and June and $5.0{\times}10^4m^3/day$ during July and August. More than $25{\times}10^4m^3/day$ of streanflow rate was occurred twice in 1994 and seven times in 1995. 2. The amount of suspended sediment in three watersheds was less than standard of drinking water(25mg/l) before road construction with daily rainfall of 74mm, 92mm, and 120mm in 1994, also after road construction with daily rainfall of 21mm and 47mm in 1995. But, under the 192mm of daily rainfall, Watershed C did not show the difference in the amount of suspended sediment, however, Watershed A and B produced 1,525mg/l and 775mg/l, respectively, which is 61 and 31 fold of stabdard of drinking water, and construction to export for 35 hours after rainfall. 3. The maximum amount of suspended sediment was less than the standard of drinking water with light rainfall before and after road construction. Under the 192mm of daily rainfall, the maximum amounts of suspended sediment in Watershed A and B were 13,150mg/l and 2,690mg/l, of 526 and 108 fold of standard of drinking water, respectively, showing obvious water pollution by sedimentation. Results of the study indicated that the forest road construction had great influence on the sedimentation, and getting increased by higher road density and heavier rainfall. Therefore such practices as vegetation covering and soil erosion control facility should be established accompanying with forest road construction to prevent from sedimentation.
This study was carried out to estimate forest road elongation coefficients for providing the basic information of forest road construction. As the results, road elongation coefficients were calculated 0.33 less than 5% of road gradient, 0.39 between the gradient of 6% and 10%, 0.50 between the gradient of 11% and 15%, 0.58 between the gradient of 16% and 20%, and 0.60 greater than the gradient of 20%.
This study was conducted to evaluate the effect of the synthetic forest road network by calculating the optimal road density and layout of the forest road network in order to construct the systematic road network in the forested area. For this, five comparative routes were additionally planed and compared through evaluation indicators. As a result, the optimum road density of the study site was estimated to be 18.4 m/ha, and the synthetic forest road network was the best in the four indicators such as average skidding distance, standard deviation of skidding distance, development index, and circuity factor. In addition, the synthetic forest road network was comparable to the main road network by about 4 %p in the timber volume available and potential area size for logging, but the construction cost of the road was about 20 %p lower. It showed a synthetic forest road network was better in terms of economy.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.