Non-point source pollutant load reductions were calculated using the Hydrologic Simulation Program-Fortran (HSPF) model under the assumption that landuse pattern was changed according to land purchases. Upon the simulation of non-point pollutant and areas with high land purchase ratios to select a buffer zone, the Namgang dam Reach 11, Imha dam Reach 10, and the Reach 136 watershed of the main river were found to rank high for the construction of buffer zones. Assuming that the forms of the purchased lands were changed to wetlands, biological oxygen demand (BOD) loads were changed through the HSPF model. No changes of BOD were present in the Namgang dam and the Imha dam watersheds. BOD loads in Reach 136 according to landuse change were analyzed through a flow duration analysis based on the total maximum daily loads of the United States. The flow duration analyses undertaken to examine changes in BOD of main river Reach 136 watershed indicated a shift of 0.64 kg/d from 3.16 to 2.52 during high flow. The change of BOD under the conditions of moist, mid-range and dry were 11.9%, 9% and 4.5%. At the low flow condition, the variation range in the BOD load was from 0.58 kg/d to 0.41 kg/d.
This study uses the SWAT model to analyze the characteristics of long-term runoff at the Ssang-cheon Basin located in the city of Sokcho, which is located in the province of Gangwon. The study considers the effect of snow packing and snow melting in a runoff simulation. In this simulation, the study examines the need to introduce a snow pack and snow melt model to evaluate the water resources of the mountainous region of the Gangwon province. The findings of this study indicate that the runoff hydrograph that was produced approximates the true measured flow when the effect of the snow pack and snow melt are considered, compared to when they are not factored in. The analysis of the flow duration curve indicates that the stream flow largely increases when the effect of the snow pack and snow melt are considered. The wet stream flow was shown to increase by nearly 3% due to the melting effect, while the normal stream flow, low stream flow and drought stream flow were shown to increase by slightly more than 10%. Specifically, it was found that as the stream flow decreases, the effect of the snow pack and snow melt on the stream flow increases.
A methodology to evaluate the performance analysis for small hydropower at existing water treatment facilities has been studied. It consists of two main parts; flow duration function which can describe existing water treatment facilities and performance analysis to estimate the output characteristics of small hydro power plants. The output performance characteristics for Mi-ho reservoir, Sum-kang low dam, Sun-cheon sewage treatment plant and Nam-dong purification plant were analyzed, using developed model. According to the simulation results, the predicted data show that the data were in good agreement with measured results. Also, it was found that the developed model in this study can be used to analyze the output characteristics for small hydro power at existing water treatment facilities.
There are differences in method and cycle of flow rate survey depending on purpose of the operating department. To verify and use results of flow data according to the purpose, flow data of the directly measured and tele monitoring system were compared to verify validity. Flow measurement in the Ministry of Environment is aimed at setting up a standard flow of target water quality for water quality management and securing flow data of low and normal water level seasons for water quality evaluation. In this study, correlation analysis result ($R^2$) of same time zone data by direct measurement and tele monitoring system (TMS) at Seombon D point, a unit watershed of Seomjin river, for six years ('10 ~ '15) according to implementation of Total Daily Maximum Load (TDML) was wading 0.716, boating 0.962 and on bridge 0.943, and effectiveness of measurement method was verified by characteristics of flow duration as a season of dry and low-water; normal and high water are appropriate for wading, boating, and on bridge respectively. Results revealed it is reasonable to use directly measured results using the wading and boating method for low water level and dry seasons, and TMS data for rainy seasons. It can be used important data for future policy decisions.
본 연구에서는, Markov 연쇄 모형에 의해 산정된 모의 일 강우량을 일 유출모형인 Tand 모형에 입력시켜 모의 일유출량을 산정함으로써 저수유량계열을 확장하는 방법을 개발하였다. 또한, 모의된 일 유량계열로부터 지속기간별 연 최저치 계열을 작성하였으며, 지속기간별 연 최저치계열에 대한 빈도분석을 시행하였다. 분석에 사용된 분포형은 Lognormal-2, Lognormal-3, Gamma-2, Gamma-3, LogGamma-3, Gumbel-2, Weibull-2 분포이었으며, 모수추정은 모멘트법과 최우도법을 사용하였다. Kolmogorov - Sminorv 검정방법으로 지속기간별 연 최저치 계열에 적합한 확률분포형을 결정하고, 용담댐 지점을 대상으로 하여 지속기간별 갈수 빈도곡선을 산정하였다. 본 연구에서 제안된 방법을 적용하면 과거 저수 유량계열의 통계적 특성을 잘 나타내는 일 유량의 모의가 가능 하여, 갈수유량계열 자료가 빈곤한 유역에서 확률 갈수량을 추정하는데 유용하리라고 판단된다.
This study aims at the estimation of dam failure time and dam failure scenario analysis of and applied to Yeoncheon Dam which was collapsed August 1st 1999, using HEC-HMS, DAMBRK-FLDWAV simulation model. As the result of the rainfall-runoff simulation, the lancet flood amount of the Yeoncheon Dam site was $10,324\;m^3/sec$ and the total outflow was $1,263.90\;million\;m^3$. For the dam failure time estimation, 13 scenarios were assumed including dam failure duration time and starting time, which reviewed to the runoff results. The simulation time was established with 30 minutes intervals between one o'clock to 4 o'clock in the morning on August 1, 1999 for the setup standard for each case of the dam failure time estimation, considering the arrival time of the flood, when the actually measured water level was sharply raising at Jeongok station area of the Yeoncheon Dam downstream, As results, dam failure arrival time could be estimated at 02:45 a.m., August 1st 1999 and duration time could be also 30 minutes. Those results and procedure could suggest how and when dam failure occurs and analyzes.
Seo, Jeong-Mi;Cho, Yong-Kyun;Yu, Myong-Jin;Ahn, Seoung-Koo;Kim, Hyun-Ook
Environmental Engineering Research
/
제10권2호
/
pp.62-70
/
2005
Pollution loading of Combined Sewer Overflows (CSOs) is frequently over the capacity of a wastewater treatment plant (WWTP) receiving the water. The objectives of this study are to investigate water quality of CSOs in Anmyun-ueup, Tean province and to apply Storm Water Management Model to predict flow rate and water quality of the CSOs. The capacity of a local WWTP was also estimated according to rainfall duration and intensity. Eleven water quality parameters were analyzed to characterize overflows. SWMM model was applied to predict the flow rate and pollutant load of CSOs during rain event. Overall, profile of the flow and pollutant load predicted by the model well followed the observed data. Based on model prediction and observed data, CSOs frequently occurs in the study area, even with light precipitation or short rainfall duration. Model analysis also indicated that the local WWTP’s capacity was short to cover the CSOs.
This study was conducted to investigate the possible installation of small hydro-power plant at the discharge point of Gumi sewage treatment plant (STP) using treated wastewater. Sufficient amount of water to transfer to electric power and the selection of proper location are two essential elements for the construction of small hydro-power facility. Preliminary analysis based on site visit and existing data in Gumi STP were made. Capacity of the small hydro-power plants and exact location were determined by geomorphological condition and flow duration characteristics. Flow duration characteristics and its duration curve were identified using monthly rainfall data in Gumi STP. Relevant facts of small hydro-power system in other STP were referred to adopt to Gumi STP situation. Flowrate of treated effluents and effective head between flow chamber and the location of hydraulic turbine in Gumi STP are found to be $3.70m^3$/sec and 3.5m respectively. Electric generation rate based on this feasibility study was estimated to be 86.3kW/h. Yearly electric generation rate was expected to be 932.4MMh. Proposed small hydro-power plant construction in Gumi STP is to be reasonable.
Numerical simulations are conducted for the analysis of a thermal mass air flow sensor with periodic heating pulses on silicon-nitride ($Si_3N_4$) thin membrane structure. This study aims to find the locations of temperature sensors on the thin membrane and the heating pulse conditions, that the higher sensitivity can be achieved, for the development of a MEMS fabricated mass air flow sensor which is driven in periodic heating pulse. The simulations, thus, focus on the membrane temperature profile according to variation of the flow velocity, heating duration time and imposed power. The flow velocity of the simulations is ranging from 3 m/s to 35 m/s, heating duration time from 1 ms to 3 ms and imposed power from 50 mW to 90 mW. The corresponding Reynolds numbers vary from 1000 to 10000.
The goal of this study is to establish an integrated watershed hydrologic model for the whole Nakdong River basin whose area is an approximately 24,000 km2. Including a number of watershed elements such as rainfall, runoff, water use, and so on, the proposed model is based on SWAT model, and is used to improve the flow duration curve estimation of ungauged watersheds for Korean Total Maximum Daily Load (TMDL). The model is also used to recognize quantitatively the river flow variation due to water use elements and large dam effluents in the whole watershed. The established combined watershed hydrologic model, SWAT-Nakdong, is used to evaluate the quantified influences of artificial water balance elements, such as a dam and water use in the watershed. We apply two water balance scenarios in this study: the dam scenario considering effluent conditions of 4 large multi-purpose dams, Andong dam, Imha dam, Namgang dam, and Habcheon dam, and the water use scenario considering a water use for stream line and the effluent from a treatment plant. The two scenarios are used to investigate the impacts on TMDL design flow and flow duration of particular locations in Nakdong River main stream. The results from this study will provide the basic guideline for the natural flow restoration in Nakdong River.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.