• Title/Summary/Keyword: felling method

Search Result 37, Processing Time 0.024 seconds

Predicting Tree Felling Direction Using Path Distance Back Link in Geographic Information Systems (GIS)

  • Rhyma Purnamasayangsukasih Parman;Mohd Hasmadi, Ismail;Norizah Kamarudin;Nur Faziera Yaakub
    • Journal of Forest and Environmental Science
    • /
    • v.39 no.4
    • /
    • pp.203-212
    • /
    • 2023
  • Directional felling is a felling method practised by the Forestry Department in Peninsular Malaysia as prescribed in Field Work Manual (1997) for Selective Management Systems (SMS) in forest harvesting. Determining the direction of tree felling in Peninsular Malaysia is conducted during the pre-felling inventory 1 to 2 years before the felling operation. This study aimed to predict and analyze the direction of tree felling using the vector-based path distance back link method in Geographic Information Systems (GIS) and compare it with the felling direction observed on the ground. The study area is at Balah Forest Reserve, Kelantan, Peninsular Malaysia. A Path Distance Back Link (spatial analyst) function in ArcGIS Pro 3.0 was used in predicting tree felling direction. Meanwhile, a binary classification was used to compare the felling direction estimated using GIS and the tree felling direction observed on the ground. Results revealed that 61.3% of 31 trees predicted using the vector-based projection method were similar to the felling direction observed on the ground. It is important to note that dynamic changes of natural constraints might occur in the middle of tree felling operation, such as weather problems, wind speed, and unpredicted tree falling direction.

Collapse Behavior of Small-Scaled RC Structures Using Felling Method (전도공법에 의한 축소모형 철근콘크리트 구조물의 붕괴거동)

  • Park, Hoon;Lee, Hee-Gwang;Yoo, Ji-Wan;Song, Jeung-Un;Kim, Seung-Kon
    • Tunnel and Underground Space
    • /
    • v.17 no.5
    • /
    • pp.381-388
    • /
    • 2007
  • The regular RC structures have been transformed into irregular RC structures by alternate load of RC structures during explosive demolition. Numerical simulation programs have contributed to a better understanding of large displacement collapse behavior during explosive demolition, but there remain a number of problems which need to be solved. In this study, the 1/5 scaled 1, 3 and 5 stories RC structures were designed and fabricated. To consider the collapse possibility of upper dead load, fabricated RC structures were demolished by means of felling method. To observe the collapse behavior of the RC structures during felling, displacement of X-direction (or horizontal), displacement of Z-direction (or vertical) md relative displacement angle from respective RC structures were analyzed. Finally explosive demolition on the scaled RC structures using felling method are carried out, collapse behavior by felling method is affected by upper dead load of scaled RC structures. Displacement of X and Z direction increases gradually to respective 67ms and 300ms after blasting. It is confirmed that initial collapse velocity due to alternate load has a higher 3 stories RC structures than 5 stories.

Productivity and Costs of Felling Operation for Three Harvesting Methods in Mixed Forest Stands (임목수확방법별 벌도작업 생산성 및 비용 분석)

  • Cho, Min-Jae;Choi, Yun-Sung;Mun, Ho-Seoung;Lee, Chung-Geon;Lee, Eun-Jai;Jung, Eung-Jin;Oh, Jae-Heun;Han, Sang-Kyun;Kim, Dae-Hyun;Cha, Du-Song
    • Journal of Korean Society of Forest Science
    • /
    • v.105 no.4
    • /
    • pp.441-448
    • /
    • 2016
  • The purpose of this study was to broaden our knowledge on the productivity and costs of felling operation in three different harvesting methods(whole tree, tree-length and cut-to-length). Felling was conducted in three different harvesting methods with two workers who have different work experiences. Worker A and B have had felling experiences for about 5 years and 15 years, respectively. Felling productivity in whole tree method was $10.3m^3/SMH$ for worker A and $12.7m^3/SMH$ for worker B. Felling costs for worker A and B were $2,066won/m^3$ and $2,201won/m^3$, respectively. Although felling productivity of worker B in whole tree method was higher than worker A, felling costs of worker A were similar to worker B because the wage of worker B was more expensive than the wage of worker A (p>0.05). In tree-length method, felling cost of worker B were cheaper than that of worker A. Felling productivity and cost in tree-length method were $2.2m^3/SMH$ and $9,890won/m^3$ for worker A and $3.3m^3/SMH$ and $8,459won/m^3$ for worker B, respectively (p<0.05). In cut-to-length method, felling productivity and cost were $2.3m^3/SMH$ and $9,584won/m^3$ for worker A and $3.0m^3/SMH$ and $9,395won/m^3$ for worker B, respectively. Felling productivity of worker B was higher than that of worker A(p>0.05). Our preliminary results found that harvesting methods and worker's experiences highly affect on the productivity and costs of felling operations. These results should be useful for forest managers when planning cost-effective harvesting operations.

Study on Timber Yield Regulation Method using Probability Density Function (확률밀도함수를 이용한 목재수확조절법 연구)

  • Park, Jung-Mook;Lee, Jung-Soo;Lee, Ho-Sang;Park, Jin-Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.109 no.4
    • /
    • pp.504-511
    • /
    • 2020
  • This study estimated planned felling volumes to set targets for management planning of nationwide country-owned forests. Estimates were made using timber harvest prediction methods that use probability density functions, including area weighting (AW), area ratio weighting (ARW), and sample area change ratio weighting (SCRW). Country-owned forest areas in 2010 and 2015 were used to estimate planned felling volumes, as shown in basic forest statistics, and calculations were made assuming that the felling areas were the changes in the forest area over the 5-year period. For the age classes of V-VI, the average felling ages for AW, ARW, and SCRW were 5.41, 5.56, and 5.37, respectively, and the felling areas were 594,462, 586,704, and 580,852 ha, respectively, with ARW reaching closest to the actual changes. The actual changes in the areas and chi-squared test results were most stable with the SCRW method. This study showed that SCRW was more adequate than AW and ARW as a method to predict timber harvests for forest management planning.

Comparison of Three Ergonomic Risk Assessment Methods (OWAS, RULA, and REB A) in Felling and Delimbing Operations (벌도 및 가지제거작업에서 세 가지 인간공학적 위험 평가기법의 비교분석)

  • Cho, Min-Jae;Jeong, Eung-Jin;Oh, Jae-Heun;Han, Sang-Kyun
    • Journal of Korean Society of Forest Science
    • /
    • v.110 no.2
    • /
    • pp.210-216
    • /
    • 2021
  • Musculoskeletal disorders affect workers' safety in most industries, and forest operations are classified as a musculoskeletal burden according to the Occupational Safety and Health Act in South Korea. In particular, felling and delimbing operations are mainly conducted by manpower, and then, it is necessary to evaluate ergonomic risk assessment for safety of felling and delimbing workers. Three ergonomic risk assessment methods, such as Ovako Working posture Analysis System (OWAS), Rapid Upper Limb Assessment (RULA), and Rapid Entire Body Assessment (REBA), are available for assessing exposure to risk factors associated with timber harvesting operations. Here, three ergonomic risk assessment methods were applied to examine ergonomic risk assessments in chainsaw felling and delimbing operations. Additionally, exposure to risk factors in each method was analyzed to propose an optimal working posture in felling and delimbing operations. The risk levels of these operations were evaluated to be highest in the RULA method, followed by the OWAS and REBA methods, and most of the exposed working postures were examined with a low-risk level of two and three without requiring any immediate working posture changes. However, two significant working postures, including the bending posture of the waist and leg in felling operation and standing posture on the fallen trees in delimbing operation, were assessed as the high-risk level and needed immediate working posture changes. Low-risk work levels were examined in the squatting posture for felling operation and the straightened posture of the waist and leg for delimbing operation. Moreover, the slope in felling operation and the tree height in delimbing operation significantly affected risk level assessment of working posture. Therefore, our study supports that felling and delimbing workers must operate with low-risk working postures for safety.

A Case Study on Explosive Demolition of Cylindrical Silo (원통형 사일로 발파해체 시공사례)

  • Park, Hoon;Jang, Seong-Ok;Park, Hyong-Ki;Kim, Nae-Hoi;Suk, Chul-Gi
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.52-63
    • /
    • 2008
  • Recently the demand of demolition for the unnecessary cylindrical silo structure is increasing due to deterioration and unsatisfactory functional conditions and the issue of demolition is becoming a major highlight. This case study introduced the explosive demolition of the cylindrical silo structure by felling method. The results of explosive demolition conducted on cylindrical silo structure using the felling method show, A silo had collapsed precisely according to estimated direction but in case of B silo there was a minor difference. The lower colunms and ring girder support was designed to the hinge line but in reality the lower colunms of the silo did not do its structural support role and only the ring girder support did its role successfully. As for the impact vibration, most of the measurements were within the estimated range.

Tree-Ring Dating of Wood Elements Used for Tongmyungjeon Hall of Changkyung Palace - The Year of Transforming from Ondol Rooms to Wooden Floors- (창경궁 통명전 목부재의 연륜연대 측정 -방에서 마루로 변형된 시기규명을 중심으로-)

  • Park, Won-Kyu;Son, Byung-Wha;Han, Sang-Hyo
    • Journal of architectural history
    • /
    • v.12 no.3
    • /
    • pp.53-63
    • /
    • 2003
  • Tree-ring chronologies can be used to date historical buildings by matching them with the chronologies of living trees or previously dated samples. Tree-ring dating gives a calendar year to each tree ring and produces the felling dates of logs or woods which had been used for buildings. In Korea, several chronologies of Japanese red pine(Pinus densiflora Sieb. et Zucc., 'sonamu' in Korean), a major species for the wooden building materials, have been developed and used for dating historical buildings. In this study, Tongmyungjeon Hall of Changkyung Palace in Seoul was dated by tree rings. The present Tongmyungjeon Hall was known to be reconstructed in A.D. 1834 after burned-out in A.D. 1790. We sampled total of 122 wood samples which were replaced during the repair process in 2002-2003. Felling dates of the samples were determined by the dendrochronological crossdating method. Crossdating method employs graphic comparison of the master patterns (ring-width chronologies of known dates) with those of the sample chronologies of unknown dates. Tree-ring dates confirmed that the reconstruction of 1834 utilized second-handed timbers as well as fresh-cut ones. The felling dates of wooden floor frames were mostly A.D. 1913, indicating the 'Ondol' floors were changed to the wooden floors around 1914 when the Japanese rulers brutally destroyed the royal Korean Palaces and transformed palace buildings to their offices or exhibition halls after occupying Korea in 1910. This study proved that tree-ring dating was a useful and accurate method to identify the critical dates for the history of Korean traditional buildings.

  • PDF

A Study for Felling Impact Vibration Prediction from Blasting Demolition (발파해체시 낙하충격진동 예측에 관한 연구)

  • 임대규;임영기
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.43-55
    • /
    • 2004
  • Use term of tower style construction exceeds recently. Accordingly, according to construction safety diagnosis result, achieve removal or Improvement construction. But when work removal, must shorten shut down time. Therefore, removal method of construction to use blasting demolition of construction is very profitable. Influence construction and equipment by blasting vibration and occurrence vibration caused by felling impact. Is using disadvantageous machine removal method of construction by and economic performance by effect of such vibartion. Therefore, this research studied techniques to forecast vibartion level happened at blasting demolition and vibration reduction techniques by use a scaled model test.

Application of Advanced Blast Demolition Simulation Method to the Drill and Blast Design for Demolishing Cylindrical Structures (원통형 구조물의 발파해체설계에 대한 최신 발파해체 시뮬레이션 기법의 적용)

  • Park, Hoon;Suk, Chul-Gi;Kim, Seung-Kon
    • Explosives and Blasting
    • /
    • v.26 no.1
    • /
    • pp.7-14
    • /
    • 2008
  • In order to complete successfully the demolition of a silo structure by means of felling method, structural properties and the geometric design of blast mouth have to be considered. In this study, a commercial software, 3-dimensional applied element analysis (3D AEM), was used to investigate the effect of the geometrical parameters of blast mouth on the collapse behavior of the silo structure.

Productivity and Cost of Tree-length Harvesting Using Cable Yarding System in a Larch (Larix leptolepis) Clear-cutting Stand

  • Jeong, Eungjin;Cho, Koohyun;Cho, Minjae;Choi, Byoungkoo;Cha, Dusong
    • Journal of Forest and Environmental Science
    • /
    • v.33 no.2
    • /
    • pp.147-153
    • /
    • 2017
  • The purpose of this study was to examine productivity and cost of tree-length harvesting using cable yarding system in a larch (Larix leptolepis) clear-cutting stand located in Pyeongchang-gun, Gangwon-do. We used tree-length harvesting method using cable yarding system with a tower yarder HAM300. The productivity was $17.6m^3/hr$ for felling, $12.4m^3/hr$ for delimbing, $4.2m^3/hr$ for yarding, and $8.1m^3/hr$ for processing. The total cost of the harvesting system was $48,381won/m^3$, which was majorly composed of yarding operation cost, at $40,169won/m^3$ (79.3%), while felling had the lowest cost at $1,154won/m^3$ (4.1%). Major factors affecting felling and processing productivity was tree volume and the number and thickness of branches for delimbing productivity. In addition, we suggest that training and education for machine operators were critical to improve yarding productivity.