Journal of The Geomorphological Association of Korea
/
v.27
no.4
/
pp.29-39
/
2020
This study estimated influences of the Ulsan Fault on tectonic movement and uplift characteristics in the Eastern Block of the Ulsan Fault. The averaged uplift rate in the Northern Coast of the Eastern Block was 0.202 m/ka, while the site in Seokbyeong-ri, Guryongpo-eup, Pohang-si, showed relatively high rate of 0.249 m/ka, attributable to influences of small fault movement, called the Gangsa Fault. Higher averaged rate of 0.270 m/ka than in the Northern Coast was calculated in the Southern Coast of the Eastern Block. The site in north of Haseo-ri, Yangnam-myeon, Gyeongju-si, showed the highest rate, suggesting influences of the Eupcheon Fault. The Western Block of the Ulsan Fault indicated the averaged rate of 0.208 m/ka, similar to that of the Northern Coast. The sites approximately 10 km apart from the Ulsan Fault showed 1.3 times higher rate in the Eastern Block than in the Western Block, while similar rates were calculated in the sites >20 km apart from the Ulsan Fault. These distributions of the rate suggest that the Ulsan Fault has significantly influenced development of marine terrace and tectonic movement in the study area, while local fault movements have also played a role.
Since the key issue that 'the Yangsan fault is seismically an active fault" was raised in 1983, thegeological and geomorphological studies of active fault have been made by many researchers. These studies are mainly focused on the Yangsan fault system(YFS) and Ulsan fault system(UFS) due to many historical earthquakes occurred in this area. There are two different types of active faultings under the ENE-WSW horizontal stress field in the southeastern part of the Korean Peninsula. The NNE-trending YFS is the most prominent right-lateral strike-slip fault and has a continuous trace about 200 km long. Some part of this system has been active during the late Quaternary with evidences clearly recognized on both the northern (Yugyeri and Tosung-ri areas) and southern parts (Eonyang to Tongdosa area) of the YFS. in the southern part, the estimated vertical slip rate is about 0.02 - 0.07 mm/yr, and the lateral slip rate may be several times larger than the vertical rate. The most recent event occurred prior to deposition of Holocene alluvium, in the northern part, the fault trend locally changes to almost N-S, dips to the east and has reverse movement. The average vertical slip rate is estimated to be less than 0.1 mm/yr. The most recent event probably occurred after 1314 years BP (AD 536). The NNW-SSE (or N-S) trending UFS is a predominantly reverse fault that built up U-ie eastern mountain and has been active during U-ie late Quaternary. The fault trace is not straight but irregularly undulates along the foot of the mountain on the east. From the disturbed terraces along U-ie fault, the average vertical slip rate on U-iis system is estimated to be about 0.08.13mm/yr. The latest event is not well studied, but seems to have occurred after the last glacial maximum in the Malbang fault and 14,000 years BP in the Kalgok fault of the UFS. However, important issues such as fault segmentation, recurrence interval, age of Quaternary deposits need further studies.
The Transactions of The Korean Institute of Electrical Engineers
/
v.57
no.8
/
pp.1470-1477
/
2008
In this paper, a new detection method of series arc-fault signals occurring at the wiring of home appliances is proposed. The discrete wavelet transform was used for the numerical analysis of the variation rate in peak, RMS, noise energy, shoulder of the arc-fault current wave. As a results, the arc distinction threshold value of these variation rates was about 0.1 in most cases. The arc-fault current of the loads with the active PFC circuit showed a high rate of variation in noise energy and shoulder, but arc-fault current of the loads without the active PFC circuit showed a high rate of variation in peak and RMS. The arc fault current in resistive loads showed a high rate of variation in shoulder.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.11
/
pp.2122-2127
/
2009
This study presents the failure rate and repair rate of Superconducting Fault Current Limiter(SFCL) and adjacent distribution equipments. When the fault current penetrated SFCL, the supply of electric power to the customers can be partly continued. It is expected that SFCL makes to improve the reliability index of customers. Contrary to the expectations, the series connection between SFCL and distribution system could deteriorate the reliability index. To evaluate the reliability index in the distribution system including SFCL, the failure rate and repair rate of SFCL are required as well as that of distribution equipments. Also, the insertion of SFCL makes to change the failure rate and repair rate of adjacent equipments. This study proposes a method to calculate the failure rate and repair rate of a component combining SFCL and adjacent equipments.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.30
no.1
/
pp.28-37
/
2016
Fault locating is an important element to minimize the damage of power system. The computation error of fault locator may occur by the influence of the DC offset component during phasor extraction. In order to minimize the bad effects of DC offset component, this paper presents an improved fault location algorithm based on a DC offset removal filter for short fault in a double circuit transmission line. We have modeled a 154kV double circuit transmission line by the ATP software to demonstrate the effectiveness of the proposed fault locating algorithm. The line to line short faults were simulated and then collected simulation data was used. It can be seen that the error rate of fault locating estimation by the proposed algorithm decreases than the error rate of fault locating estimation by conventional algorithm.
The large-scale power system blackouts have indicated that conventional protection relays that based on local signals cannot fit for modern power grids with complicated setting or heavily loaded-flow transfer. In order to accurately detect various faulted lines and improve the fault-tolerance of wide-area protection, a novel multi-section weighed fault matching and detecting algorithm is proposed. The real protection vector (RPV) and expected section protection vectors (ESPVs) for five fault sections are constructed respectively. The function of multi-section weighed fault matching is established to calculate the section fault matching degrees between RPV and five ESPVs. Then the fault degree of protected line based on five section fault degrees can be obtained. Two fault detecting criterions are given to support the higher accuracy rate of detecting fault. With the enumerating method, the simulation tests illustrate the correctness and fault-tolerance of proposed algorithm. It can reach the target of 100% accuracy rate under 5 bits error of wide-area protections. The influence factors of fault-tolerance are analyzed, which include the choosing of wide-area protections, as well as the topological structures of power grid and fault threshold.
In this paper, reliability software model considering fault detection rate based on observations from the process of software product testing was studied. Adding new fault probability using the S-shaped distribution model that is widely used in the field of reliability problems presented. When correcting or modifying the software, finite failure non-homogeneous Poisson process model was used. In a software failure data analysis considering the time-dependent fault detection rate, the parameters estimation using maximum likelihood estimation of failure time data and reliability make out.
The Transactions of the Korean Institute of Electrical Engineers
/
v.45
no.1
/
pp.14-17
/
1996
We analyzed the characteristics of a power system with superconducting fault current limiter and showed the possibility of the application of a superconducting fault current limiter to a real power system through manufacturing of and experiment about 220Vrms/100Apeak class superconducting fault current limiter. We experimentally confirmed that the overvoltage of superconducting fault current limiter increased as the rate of current sharing to the limiting coil grew. The fault current could be limited within a few milliseconds when it was applied to a power system in series. Therefore, we could confirm that superconducting fault current limiter was effective in protection of a substation or power plant at short-circuit fault. (author). 7 refs., 7 figs., 2 tabs.
Proceedings of the Earthquake Engineering Society of Korea Conference
/
2006.03a
/
pp.78-85
/
2006
The Ulsan Fault System continues from north of Gyeongju to Ulsan city, trending NNW-SSE and is about 50 km. Many Quaternary faults have been reported and investigated with outcrop observation. Lineaments have been extracted with aerial photograph interpretation and classified by their ranks. Trench excavations on the lineaments along Ulsan Fault System have been carried out to clarify the neotectonic movements and fault parameters such as the latest movement age, fault displacement, slip rate and recurrence interval. We have compiled data from previous studies on criteria of segment type such as lineament rank, seismicity, slip rate, and the latest fault movement. Based on these data, we tried to devide the Ulsan Fault System into several segments. The results of segmentation with each types of segment along the Ulsan Fault System did not show singular division point but overlapped or different length and location.
This paper describes the control philosophy of ESP(Electronic Stability Program) which consists of the stability control the fault diagnosis and the fault tolerant control. Besides the functional performance of the stability control, robustness of control and fault diagnosis is focused to avoid the unnecessary activation of the controller. The look-up tables are mentioned to have the accurate target yaw rate of the vehicle and obtained from vehicle tests for the whole operation range of the steering wheel angle and the vehicle speed. The wheel slip control with a design goal of wheel slip invariance is implemented for the yaw compensation and the target wheel slip is determined by difference between the target yaw rate and actual yaw rate. Since the ESP has a high severity level and the robust control is required, the robustness margin for the stability control is determined according to several uncertainties and the robust fault diagnosis is performed. Both computer simulation and test results are shown in this paper.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.