• Title/Summary/Keyword: facility plan and model

Search Result 176, Processing Time 0.019 seconds

Development of AHP-based Aviation Logistics MPE Company's Production Management Job Training (AHP 기반 항공물류 소부장 전문기업의 생산관리 직무교육 개발 방안)

  • Lee, Dong-Bae;Park, Doo-Jin
    • Journal of Korea Port Economic Association
    • /
    • v.40 no.2
    • /
    • pp.191-204
    • /
    • 2024
  • In this study, AHP-based production management job training was developed for MPE companies in the aviation logistics industry. The AHP model was designed with upper and lower classes. Purchase management competency, material management competency, process management competency, and SCM competency were selected as factors of the upper class of production management job training. Lower class evaluation factors were selected for each upper class. As a result of AHP analysis, the relative importance of the upper class evaluation factors was found in the order of SCM competency (0.322), process management competency (0.314), material management competency (0.201), and purchase management competency (0.163). Among the upper classes, it was analyzed that the importance of SCM competency and process management competency was high. The final priority of evaluation factors for the development of the production management curriculum of MPE companies in the aviation logistics industry was analyzed as follows. First, supply chain performance management, which is the lower layer of SCM competency, was analyzed as the top priority factor, and the priorities of evaluation factors were derived such as facility preservation management, which is the lower layer of SCM competency, supply chain production operation, which is the lower layer of SCM competency, process quality management, which is the lower layer of SCM competency, supply chain transportation management, and supply chain supply plan, which are the lower layers of SCM competency

A Study for Seepage Control of Levee with a Pervious Toe Drain (제내 비탈끝 배수공을 이용한 제방의 침투조절에 관한 연구)

  • Kong, Young-San;Kang, Tae-Uk;Lee, Sang-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.6
    • /
    • pp.569-581
    • /
    • 2012
  • The levee is the facility which is constructed along with river for the protection of landside and for passage of water when there is a flood. When the seepage is exposed to the atmosphere on the landside surface of levee, it may eventually lead to levee failure. The seepage water may be removed from the landside surface by a properly designed drainage system. The purpose of the study is to show seepage control effect of a pervious toe drain, and to compare two drainage methods of a pervious toe drain. One is the pervious toe drain suggested by U.S. Army Corps of Engineers (USACE) and the other is that suggested by Japan Institute of Construction Engineering (JICE). The levee model constructed has the following dimension: the base width is 2.6 m; the crest width is 0.4 m; the side slope 1 : 2. The water depth in the riverside is 0.5 m. The shape of the toe drain by USACE is triangular. The shape of the toe drain by JICE is rectangular. They were installed with the base length of 0.4 m. The levee model without the toe drain showed saturation surface on the land side in the experiment but not with the toe drain. The experiment results was applied to a numerical analysis model using SEEP/W to calibrate and verify. The numerical analysis results for 35 cm and 30 cm drain width showed that the drain by JICE is a little bit safer than the drain by USACE. It is also easier to construct the toe drain by JICE. The results in the study would be applied to plan the seepage control for a levee with pervious toe drain.

Estimation and evaluation of irrigation water need using net water consumption concept in Jeju Island (순물소모량 개념에 의한 제주도 농업용수 수요량 산정 및 평가)

  • Kim, Chul Gyum;Kim, Nam Won
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.7
    • /
    • pp.503-511
    • /
    • 2017
  • In order to estimate the demand for water resources planning and operation, methodology for determining the size of water supply facilities has been mainly applied to agricultural water, unlike living and industrial water, which reflects actual usage trends. This inevitably leads to an overestimation of agricultural water and can lead to an imbalance in the supply and demand of each use in terms of the total water resources plan. In this study, the difference of approaches of concept of net consumption was examined in comparison with the existing methodology and the characteristics of agricultural water demand were analyzed by applying it to whole Jeju Island. SWAT model was applied to estimate the amount of evapotranspiration, which is a key factor in estimating demand, and watershed modeling was performed to reflect geographical features, weather, runoff and water use characteristics of Jeju Island. For the past period (1992~2013), demand of Jeju Island as a whole was analyzed as 427 mm per year, and it showed a relatively high demand around the eastern and western coastal regions. Annual demand and seasonal variation characteristics of 10 river basins with watershed area of $30km^2$ or more were also analyzed. In addition, by applying the cultivated area of each crop in 2020 in the future, it is estimated that the demand corresponding to the 10-year frequency drought is 54% of the amount demanded in the previous research. This is due to the difference in approach depending on the purpose of the demand calculation. From the viewpoint of water resource management and operation, additional demand is expected as much as the net consumption. However, from the actual supply perspective, it can be judged that a facility plan that meets the existing demand amount is necessary. In order to utilize the methodologies and results presented in this study in practice, it is necessary to make a reasonable discussion in terms of policy and institutional as well as engineering verification.

A Study on the Estimation Method of the Repair Rates in Finishing Materials of Domestic Office Buildings (국내 업무시설 건축 마감재의 수선율 산정 방안에 관한 연구)

  • Kim, Sun-Nam;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.52-63
    • /
    • 2015
  • Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.

A study on the developmental plan of Alarm Monitoring Service (기계경비의 발전적 대응방안에 관한 연구)

  • Chung, Tae-Hwang;So, Seung-Young
    • Korean Security Journal
    • /
    • no.22
    • /
    • pp.145-168
    • /
    • 2010
  • Since Alarm Monitoring Service was introduced in Korea in 1981, the market has been increasing and is expected to increase continually. Some factors such as the increase of social security need and the change of safety consciousness, increase of persons who live alone could be affected positively on Alarm Monitoring Service industry. As Alarm Monitoring Service come into wide use, the understanding of electronic security service is spread and consumer's demand is difficult, so consideration about new developmental plan is need to respond to the change actively. Electronic security system is consist of various kinds of element, so every element could do their role equally. Alarm Monitoring Service should satisfy consumer's various needs because it is not necessary commodity, also electronic security device could be easily operated and it's appearance has to have a good design. To solve the false alarm problem, detection sensor's improvement should be considered preferentially and development of new type of sensor that operate dissimilarly to replace former sensor is needed. On the other hand, to settle the matter that occurred by response time, security company could explain the limit on Alarm Monitoring System to consumer honestly and ask for an understanding. If consumer could be joined into security activity by security agent's explanation, better security service would be provided with mutual confidence. To save response time the consideration on the introduction of GIS(Global Information System) is needed rather than GPS(Global Positioning System). Although training program for security agents is important, several benefits for security agents should be considered together. The development of new business model is required for preparation against market stagnation and the development of new commodity to secure consumer for housing service rather than commercial facility service. for the purpose of those, new commodity related to home-network system and video surveillance system could be considered, also new added service with network between security company and consumer for a basis is to be considered.

  • PDF

Optimization Process Models of Gas Combined Cycle CHP Using Renewable Energy Hybrid System in Industrial Complex (산업단지 내 CHP Hybrid System 최적화 모델에 관한 연구)

  • Oh, Kwang Min;Kim, Lae Hyun
    • Journal of Energy Engineering
    • /
    • v.28 no.3
    • /
    • pp.65-79
    • /
    • 2019
  • The study attempted to estimate the optimal facility capacity by combining renewable energy sources that can be connected with gas CHP in industrial complexes. In particular, we reviewed industrial complexes subject to energy use plan from 2013 to 2016. Although the regional designation was excluded, Sejong industrial complex, which has a fuel usage of 38 thousand TOE annually and a high heat density of $92.6Gcal/km^2{\cdot}h$, was selected for research. And we analyzed the optimal operation model of CHP Hybrid System linking fuel cell and photovoltaic power generation using HOMER Pro, a renewable energy hybrid system economic analysis program. In addition, in order to improve the reliability of the research by analyzing not only the heat demand but also the heat demand patterns for the dominant sectors in the thermal energy, the main supply energy source of CHP, the economic benefits were added to compare the relative benefits. As a result, the total indirect heat demand of Sejong industrial complex under construction was 378,282 Gcal per year, of which paper industry accounted for 77.7%, which is 293,754 Gcal per year. For the entire industrial complex indirect heat demand, a single CHP has an optimal capacity of 30,000 kW. In this case, CHP shares 275,707 Gcal and 72.8% of heat production, while peak load boiler PLB shares 103,240 Gcal and 27.2%. In the CHP, fuel cell, and photovoltaic combinations, the optimum capacity is 30,000 kW, 5,000 kW, and 1,980 kW, respectively. At this time, CHP shared 275,940 Gcal, 72.8%, fuel cell 12,390 Gcal, 3.3%, and PLB 90,620 Gcal, 23.9%. The CHP capacity was not reduced because an uneconomical alternative was found that required excessive operation of the PLB for insufficient heat production resulting from the CHP capacity reduction. On the other hand, in terms of indirect heat demand for the paper industry, which is the dominant industry, the optimal capacity of CHP, fuel cell, and photovoltaic combination is 25,000 kW, 5,000 kW, and 2,000 kW. The heat production was analyzed to be CHP 225,053 Gcal, 76.5%, fuel cell 11,215 Gcal, 3.8%, PLB 58,012 Gcal, 19.7%. However, the economic analysis results of the current electricity market and gas market confirm that the return on investment is impossible. However, we confirmed that the CHP Hybrid System, which combines CHP, fuel cell, and solar power, can improve management conditions of about KRW 9.3 billion annually for a single CHP system.