• Title/Summary/Keyword: facility

Search Result 11,455, Processing Time 0.041 seconds

The Improvement of the Road Facility Database Creation Using a Mobile GIS (모바일 GIS를 활용한 도로시설물 DB 구축의 효율성 향상)

  • 이현직;박은관;용민;최동주
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.373-380
    • /
    • 2004
  • GIS was introduced to spatial information of complex and various facility systematically and scientifically. And, recently, new trend has been spread by Mobile GIS owing to its fast development of information and communication technology However, these Mobile GIS techniques were introduced in maintenances of various facilities. Due to its mismanagement, the use became insufficient in facilities causing database creation to require realism and mobility. Therefore, in this research, to road facility of various facilities, it deduced improving the work process by using a Mobile GIS to analyze work process of the road facility database creation. And, through an experiment, by comparing and analyzing road facilities database creation process by existing method and improving method, could improvement of road facility database creation using a Mobile GIS.

  • PDF

Residential space analysis of Elderly nursing facility by converting case for usage (용도 변경 사례를 통한 노인요양시설의 거주 공간 분석)

  • Jang, Hye-Won;Kim, Dae-Hee;Hwang, Eun-Kyuong
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.370-375
    • /
    • 2008
  • A lot of nursing facility expansions are needed by rapidly growing elder population and operating long-term nursing act for the elderly from July, 2008. To supply facilities in a short period, government is considering a method which is converting usage of existed building to nursing facility. Therefore, we took actual state analysis by interviewing manager, surveying actual measurement and using draft among the converted facilities. To improve and encourage those living environments of nursing facilities, we need to establish design standard of adaptable facility.

  • PDF

Economic Feasibility Analysis on Construction Facility Improvement Project of North Korea Considering Technology Application Period (국내 기술의 적용시기를 고려한 북한 건축시설 개선사업의 경제적 타당성 분석)

  • Kim, Min Ju;Kim, Chang-Won;Lee, Dongyoun;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.68-69
    • /
    • 2016
  • North Korean market created by reunification of the Korean Peninsula is expected to serve as a new growth engine to the already-developed construction industry of South Korea. Improvement on deteriorated construction facility of North Korea is a project in urgent need at the initial stage of reunification. Prior to market entry of the Korean peninsula under these circumstances, economic feasibility analysis on construction technology application must be preceded by considering reunification period. Therefore, this study conducts an economic feasibility analysis on construction facility improvement project of North Korea considering application period of technology developed by South Korea. Results of this study are expected to be utilized in future reunification process as the basis for establishing relevant guidelines for construction facility improvement project of North Korea.

  • PDF

A Study On the Development of Facility Management Performance Evaluation system by Analyzing Current FM Practices of Commercial Office Buildings (Commercial Office의 Facility Management(FM) 업무 현황 분석을 통한 성과 평가체계 구축 방안)

  • Yoon, Jong-Han;Cha, Hee-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.89-90
    • /
    • 2016
  • Despite the rise of importance of Facility Management(FM), relatively little attention was paid to evaluate FM efficiency and drive for greater FM efficiency. The purpose of the present paper is to offer a quantitative analysis of 14 Key Success Factors(KSF) and 22 detailed maintenance practices in order to develop FM evaluation system. In addition, from survey with Owner/Property Manager group and Facility Manager group, the present paper measures both importance of detailed maintenance practices and performance satisfaction. It is expected that by using the result of this survey, this paper helps increase efficiency in FM. Moreover, It is expected that this paper will be used as base line data in developing FM practice evaluation system.

  • PDF

A Study on Applying the Ground Source Heat Pump System in Greenhouse and Livestock Facility (지열 시스템의 원예시설과 축사시설 적용에 관한 연구)

  • Jang, Jea-Chul;Kang, Eun-Chul;Song, Jun-Ik;Kim, Ji-Young;Lee, Euy-Joon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.5 no.2
    • /
    • pp.1-6
    • /
    • 2009
  • In this paper, RETScreen program model has been investigated to predict the economic analysis for greenhouse and livestock facility. Load calculation result was 35.2[kW] of greenhouse and the calculation result of livestock facility was 35.5[kW]. Also, a case study of the RETScreen program indicated that the equity payback is 6.9 years for a greenhouse facility and the equity payback is 9.5 years for a livestock facility.

  • PDF

Development of Cryogenic Pump Test Facility (극저온 펌프 성능시험설비의 개발)

  • Kang, Jeong-Seek;Kim, Jin-Sun;Kim, Jin-Han
    • The KSFM Journal of Fluid Machinery
    • /
    • v.7 no.4 s.25
    • /
    • pp.47-52
    • /
    • 2004
  • Cryogenic pump test facility (CPTF) is designed and developed in KARI. Hydraulic and cavitation performance of pump and inducer in cryogenic environment can be measured. Working fluid is liquid nitrogen and operating temperature is $-197^{\circ}C$. Run tank, catch tank of liquid nitrogen and their pressurizing tank has been built and remote tank pressure control system are installed. Maximum power of driving motor is 320 kW and its maximum speed is 32000rpm. Cryogenic fluids and lubricating systems are effectively separated that long test times are acquired. Therefore hydraulic and cavitation performance can be measured accurately and effectively. Pre-cooling test of the facility was successfully accomplished. This facility will contribute greatly to the development of turbopump for KSLV.

Deployment of Radioactive Waste Disposal Facility with the Introduction of Nuclear Power Plants (NPP) in Kenya

  • Shadrack, A.;Kim, C.L.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • v.1 no.1
    • /
    • pp.37-47
    • /
    • 2013
  • This paper describes basic plans for the development of a radioactive waste disposal facility with the introduction of Nuclear Power Plants (NPPs) for Kenya. The specific objective of this study was to estimate the total projected waste volumes of low- and intermediate-level radioactive waste (LILW) expected to be generated from the Kenyan nuclear power programme. The facility is expected to accommodate LILW to be generated from operation and decommissioning of nuclear power plants for a period of 50 years. An on-site storage capacity of 700 $m^3$ at nuclear power plant sites and a final disposal repository facility of more than 7,000 $m^3$ capacity were derived by considering Korean nuclear power programme radioactive waste generation data, including Kori, Hanbit, and APR 1400 nuclear reactor data. The repository program is best suited to be introduced roughly 10 years after reactor operation. This study is important as an initial implementation of a national LILW disposal program for Kenya and other newcomer countries interested in nuclear power technology.

Research on the Requests for the Design of Welfare Facility for the Disabled in the Railroad Station (철도역사내 장애인 편의시설의 디자인 요구사항에 관한 연구)

  • Kim Byeoung-Rae;Lee Sung-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1725-1730
    • /
    • 2004
  • The railroad station building is a public facility that many people use. The disabled persons cannot move as freely as the ordinary persons do, so the facility shall be considered on this matter. We reviewed on the features of the retarded, visually handicapped and mentally retarded persons upon moving, and calculated the minimum space required in their move, access and use of the reachable space, and we also analyzed the design factors so that the prior guidance can be considered for the visually handicapped such as installation of guidance facility, change of finishing material and Braille points block handrail to avoid obstacles for the use of senses of touch, hearing and remained eyesight of the visually handicapped. In addition, we also analyzed the requests of general design totally to analyze and arrange the design factors with the thought that the facility for the handicapped shall be useful for the ordinary people as well as the handicapped.

  • PDF

Hydraulic Performance Test of a Turbopump Inducer using Liquid Nitrogen (액체질소를 이용한 터보펌프 인듀서의 수력성능시험)

  • Kim Jin-Sun;Hong Soon-Sam;Kim Jin-Han
    • The KSFM Journal of Fluid Machinery
    • /
    • v.9 no.4 s.37
    • /
    • pp.20-26
    • /
    • 2006
  • A cryogenic test facility has been developed to perform inducer and pump tests using liquid nitrogen. Performance tests of a turbopump in the maximum 50ton-thrust class can be performed with cryogenic fluid in the facility which operates at a temperature around -196oC with the rotational speed up to 30,000rpm To verify the reliability of the cryogenic pump test facility, hydraulic performance tests of an inducer were accomplished, and their results were compared with the result from a water test. The results confirm the reliability of the cryogenic test facility, and it is expected to contribute for on-going development of a turbopump for liquid rocket engines.

A Study on Core Functions of Building Maintenance using BIM by Delphi Survey (델파이조사를 통한 BIM을 이용한 건축물 유지관리 요소 기능)

  • Won, Ho-Sik;Kim, Soon-Seok;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.259-260
    • /
    • 2015
  • In this paper, for deriving core function requirements of facility maintenance using BIM(Building Information Modeling) customized surveys were conducted with 30 facility managers during 6 momths from July 2014. As a result, 19 core function requirements for efficient facility maintenance are drawn. The core of Building facility management function is that opinions of facilities maintenance managers should be fully reflected than that of BIM experts. In the future, the development of maintenance programs based on BIM should be made fully by reflecting the opinions of building facility managers on the basis of this questionnaire survey results.

  • PDF