• Title/Summary/Keyword: expected spacing error

Search Result 5, Processing Time 0.026 seconds

Rebar Spacing Fixing Technology using Laser Scanning and HoloLens

  • Lee, Yeongjoo;Kim, Jeongseop;Lee, Jin Gang;Kim, Minkoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.69-80
    • /
    • 2024
  • Currently rebar spacing inspection is carried out by human inspectors who heavily rely on their individual experience, lacking a guarantee of objectivity and accuracy in the inspection process. In addition, if incorrectly placed rebars are identified, the inspector need to correct them. Recently, laser scanning and AR technologies have been widely used because of their merits of measurement accuracy and visualization. This study proposes a technology for rebar spacing inspection and fixing by combining laser scanning and AR technology. First, scan data acquisition of rebar layers is performed and the raw scan data is processed. Second, AR-based visualization and fixing are performed by comparing the design model with the model generated from the scan data. To verify the developed technique, performance comparison test is conducted by comparing with existing drawing-based method in terms of inspection time, error detection rate, cognitive load, and situational awareness ability. It is found from the result of the experiment that the AR-based rebar inspection and fixing technology is faster than the drawing-based method, but there was no significant difference between the two groups in error identification rate, cognitive load, and situational awareness ability. Based on the experimental results, the proposed AR-based rebar spacing inspection and fixing technology is expected to be highly useful throughout the construction industry.

Fault-Tolerant Controller Design for Vehicles Platooning

  • Yoon, Gyeong-Hwan;Choi, Jae-Weon
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1853-1856
    • /
    • 2003
  • This paper considers the problem of longitudinal control of a platoon of automotive vehicles on a straight lane of a highway and proposes control laws in the event of loss of communication between the lead vehicle and the other vehicles in the platoon. Since safety plays a key role in the development of an Automated Highway System, fault-tolerant control is vital. In this paper, we develop a control algorithm in vehicle platooning and prove that this control algorithm is stable for certain class of faults such as parameter uncertainties. The performance of the controller is demonstrated through a series of simulations incorporating various vehicles and AHS faults. Results of simulation shows that the vehicles have good performance in spite of simple automotive and AHS failure, such as actuator failure,that is to say, engine input failure, communication failure between lead vehicle and the another vehicles.

  • PDF

Methodology for Determining RSE Spacing for Vehicle-Infrastructure Integration(VII) Based Traffic Information System (Focused on Uninterrupted Traffic Flow) (차량-인프라 연계(VII) 기반 교통정보시스템의 RSE 설치간격 결정 방법론 (연속류를 중심으로))

  • Park, Jun-Hyeong;O, Cheol;Im, Hui-Seop;Gang, Gyeong-Pyo
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.6
    • /
    • pp.29-44
    • /
    • 2009
  • A variety of research efforts, using advanced wireless communication technologies, have been made to develop more reliable traffic information system. This study presents a novel decentralized traffic information system based on vehicle infrastructure integration (VII). A major objective of this study was also to devise a methodology for determining appropriate spacing of roadside equipment (RSE) to fully exploit the benefits of the proposed VII-based traffic information system. Evaluation of travel time estimation accuracy was conducted with various RSE spacings and the market penetration rates of equipped vehicle. A microscopic traffic simulator, VISSIM, was used to obtain individual vehicle travel information for the evaluation. In addition, the ANOVA tests were conducted to draw statistically significant results of simulation analyses in determining the RSE spacing. It is expected that the proposed methodology will be a valuable precursor to implementing capability-enhanced next generation traffic information systems under the forthcoming ubiquitous transportation environment.

Climate Change Impact on the Flowering Season of Japanese Cherry (Prunus serrulata var. spontanea) in Korea during 1941-2100 (기후변화에 따른 벚꽃 개화일의 시공간 변이)

  • Yun Jin-I.
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.8 no.2
    • /
    • pp.68-76
    • /
    • 2006
  • A thermal time-based two-step phenological model was used to project flowering dates of Japanese cherry in South Korea from 1941 to 2100. The model consists of two sequential periods: the rest period described by chilling requirement and the forcing period described by heating requirement. Daily maximum and minimum temperature are used to calculate daily chill units until a pre-determined chilling requirement for rest release is met. After the projected rest release date, daily heat units (growing degree days) are accumulated until a pre-determined heating requirement for flowering is achieved. Model calculations using daily temperature data at 18 synoptic stations during 1955-2004 were compared with the observed blooming dates and resulted in 3.9 days mean absolute error, 5.1 days root mean squared error, and a correlation coefficient of 0.86. Considering that the phonology observation has never been fully standardized in Korea, this result seems reasonable. Gridded data sets of daily maximum and minimum temperature with a 270 m grid spacing were prepared for the climatological years 1941-1970 and 1971-2000 from observations at 56 synoptic stations by using a spatial interpolation scheme for correcting urban heat island effect as well as elevation effect. A 25km-resolution temperature data set covering the Korean Peninsula, prepared by the Meteorological Research Institute of Korea Meteorological Administration under the condition of Inter-governmental Panel on Climate Change-Special Report on Emission Scenarios A2, was converted to 270 m gridded data for the climatological years 2011-2040, 2041-2070 and 2071-2100. The model was run by the gridded daily maximum and minimum temperature data sets, each representing a climatological normal year for 1941-1970, 1971-2000, 2011-2040, 2041-2070, and 2071-2100. According to the model calculation, the spatially averaged flowering date for the 1971-2000 normal is shorter than that for 1941-1970 by 5.2 days. Compared with the current normal (1971-2000), flowering of Japanese cherry is expected to be earlier by 9, 21, and 29 days in the future normal years 2011-2040, 2041-2070, and 2071-2100, respectively. Southern coastal areas might experience springs with incomplete or even no Japanese cherry flowering caused by insufficient chilling for breaking bud dormancy.

Tensile Deformation Characteristics of ECC Predicted with a Modified Fiber Bridging Curve (수정된 섬유 가교 특성을 고려한 ECC의 인장변형특성)

  • Kim, Jeong-Su;Lee, Bang-Yeon;Kim, Jin-Keun;Kim, Yun-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.5
    • /
    • pp.541-548
    • /
    • 2009
  • A theoretical prediction model of fiber bridging curve was established based on the assumption that fibers are uniformly distributed on the crack surface. However, the distance between fibers and their orientation with respect to crack surface can greatly affect the prediction of fiber bridging curve. Since, the shape of fiber bridging curve is a critical factor for predicting the tensile stress-strain relationship of ECC, it is expected that the assumption of uniform distribution of fiber may cause a significant error when predicting the tensile behavior of ECC. To overcome this shortcoming, a new prediction method of stress-strain relation of ECC is proposed based on the modified fiber bridging curve. Only effective fibers are taken into account considering the effects of their orientation and distance between them. Moreover, the approach for formulating the tensile stress-strain relation is discussed, where a procedure is presented for obtaining important parameters, such as the first crack strength, the peak stress, the displacement at peak stress, tensile strain capacity, and the crack spacing. Subsequent uniaxial tensile tests were performed to validate the proposed method. It was found that the predicted stress-strain relations obtained based on the proposed modified fiber bridging curve exhibited a good agreement with experimental results.