• Title/Summary/Keyword: excavation step

Search Result 83, Processing Time 0.024 seconds

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • v.28 no.6
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.

특정 사례터널 해석 결과 및 평가

  • Lee, Seung-Rae;O, Se-Bung;Baek, Gyu-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.123-132
    • /
    • 1991
  • The GEOKST program was used to solve the tunnel example problem. The package can solve such geotechnical problem as excavation, embankment, foundations, etc., in which the soil can be modeled by various elastoplastic geomaterial models. The main objective was to consider the effects of excavation depth to the face of the tunnel on the stability of the ground and support system. Depended on the strength of the ground materials, the limit excavation depth without any support system could be established by analyzing three-dimensional excavation problem. In this given example problem, the strengths of the ground materials were enough for the stability of the tunnel without any support system up to fairly deep excavation and the maximum tunnel section displacement was stabilized as the excavation proceed. The asymptotic value was approximately the same as that of the plane strain analysis. Thus, assuming the plain strain condition and simulation the actual excavation procedure, the maximum tunnel section displacement was caculated after final step. The maximum calculated displacement occured at the top section of the tunnel geometry and was about 8mm.

  • PDF

UNDERGROUND WATER PROBLEMS IN DEEP EXCAVATION CONSTRVCTION CONTROL AGAINST BOILING FAILURE IN DEEP EXCAVATION IN SANDY GROUND BY FIELD MONITORING

  • Iwasaki, Yoahinori
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1990.10a
    • /
    • pp.97-110
    • /
    • 1990
  • This paper presents a case history of a deep open cut excavation of Nakagawa section for Futuoka Subway construction which adopted observational mettled against boiling failure and completed with success by modifying construction based upon field monitoring. One of the difficult conditions for the excavation was sandy layer with high water pressure which was anticipated boiling failure. The boiling was generally considered as one of the difficult phenomena to work with the observational method because of its unpredictable catastrophic nature. Laboratory experiments showed the existence of the prefailure movements of the ground and the possibility of the application of the observational method against the boiling failure. Construction step was planned to be modified, if necessary, based upon field monitoring and was completed with success.

  • PDF

A Study on the visco-plastic behavior of the jointed rock mass reinforced by rockbolts during excavation (굴착과정에서 록볼트로 보강된 절리암반의 점소성 거동 분석)

  • 이연구;이정인;조태진
    • Tunnel and Underground Space
    • /
    • v.5 no.2
    • /
    • pp.123-133
    • /
    • 1995
  • A two dimensional visco-plastic finite element model capable of handling the multistep excavaton was developed for investigating the effect of excavation-support sequences on the behaviour of underground openings in the jointed rock mass. Ubiquitous joint pattern was considered in the model and joint properties in each set were assumed to be identical. Passive, fully-grouted rockbolts were considered in the model. Visco-plastic deformations of joints and rockbolts were assumed to be governed by Mohr-Coulomb and von Mises yield criteria, respectively. With the ability of removing elements, the model can von Mises yield criteria, respectively. With the ability of removing elements, the model can simulate the multi-step excavation-support sequences. The reliability of the model to the stability analysis for the underground excavation in practice was checked by simulating the behavior of underground crude oil storage caverns under construction.

  • PDF

Stability Analysis of Sheet Pile Reinforced with Strut (버팀대로 보강된 널말뚝의 안정해석)

  • Kim, Ji Hoon;Kang, Yea Mook;Chee, In Taeg
    • Korean Journal of Agricultural Science
    • /
    • v.24 no.2
    • /
    • pp.226-236
    • /
    • 1997
  • The results obtained by elasto-plastic analysis method about the displacement, deformation and stability on the soft ground excavation using sheet pile were summarized as follows ; 1. In the case of strut 1 step, the maximum wall displacement value in the first and the second excavation was small, but it increase remarkably after the third excavation and when the excavation depth was 8m, the point of maximum wall displacement was shown 0.75H~0.8H. 2. The value of safety factor(Fs) was increased with increasing of the penetration depth of sheet pile, cohesion and internal friction angle of ground. Safety factor was mostly effected by penetration depth of sheet pile and more effected by cohesion than internal friction angle of ground. 3. Since the deformation of sheet pile of this ground from the results of analysis and measurement increased remarkabaly after 6m excavation depth, it was desirable that the point of strut installation was GL-6m. 4. Safe excavation depth on ground by analysis considered penetration depth, cohesion and internal friction was shown at the table 3.

  • PDF

Evaluation of Track irregularity due to Adjacent Excavation Work on Serviced Urban Transit (도시철도 인접굴착공사에 따른 운행선 궤도의 궤도틀림 분석)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.481-487
    • /
    • 2020
  • In this study, finite element analysis was performed to evaluate the track irregularity of the existing track system on urban transit according to the large-scale excavation work that is constructed adjacent to the serviced line. Based on the numerical analysis, the effect of track irregularity generated during the step-by-step construction process was analytically derived, and the stability in terms of track deformation was evaluated through comparison with related standards. As the results, in the case of track irregularity items evaluated based on the relative displacement difference at a certain distance, such as alignment and vertical irregularity, it occurred most clearly at the location where deformation of the existing structure begins, such as the end point of adjacent excavation work. On the other hand, the overall vertical and horizontal displacement of the track was the largest deformation at the center of the construction section. The vulnerable position of the deformed side of the existing structure due to adjacent excavation is analytically proven that the both of the end point section and the center of the construction can be a vulnerable position in terms of track irregularity.

Back Analysis of Tunnel for multi-step Construction (시공 단계를 고려한 터널의 역해석에 관한 연구)

  • 김선명;윤지선
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.479-484
    • /
    • 2000
  • The reliable estimation of the system parameters and the accurate prediction of the system behavior are important to design tunnel safely and economically. Therefore, the back analysis using the field measurements data is useful to evaluate the geotechnical parameter for tunnel. In the back analysis method, the selection of initial value and uncertainty of field measurements influence significantly on the analysis result. In this paper, to overcome uncertainty of field measurements, we performed the back analysis using the displacement data gained at each step of excavation and support.

  • PDF

Evaluation of Soil Stiffness and Excavation Support Wall Deformation at Deep Excavation Site Using Inverse Analysis (역해석을 이용한 지반 강성 산정 및 굴착 지지벽체의 변형 평가)

  • Kim, Taesik;Jung, Young-Hoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.12
    • /
    • pp.5-10
    • /
    • 2020
  • In this study, the evolution of soil engineering property values according to excavation was analyzed through the inverse analysis for the OO deep excavation site located in Incheon. The stiffness of the ground was updated by comparing the horizontal wall deformation of the excavation support wall calculated by the finite element analysis at each stage of excavation and the value measured using an inclinometer. The updated stiffness was used to predict the response of the excavation support wall in the next excavation step. The finite element analysis method using the Hardening Soil model was used, and the stratum where the excavation support wall is located was selected as the stratum for the inverse analysis. The inverse analysis results showed that the stiffness value at the stiffness value at the initial stage of excavation is larger than the stiffness used in the original design. As the excavation proceeds, the stiffness calculated through the second inverse analysis was found to decrease compared to the value derived by the first inverse analysis. Therefore, it can be stated that the deformation of the excavation support wall can be accurately calculated through finite element analysis when an appropriate stiffness value is input according to the excavation stage.

Limit analysis of a shallow subway tunnel with staged construction

  • Yu, Shengbing
    • Geomechanics and Engineering
    • /
    • v.15 no.5
    • /
    • pp.1039-1046
    • /
    • 2018
  • This paper presents a limit analysis of the series of construction stages of shallow tunneling method by investigating their respective safety factors and failure mechanisms. A case study for one particular cross-section of Beijing Subway Line 7 is undertaken, with a focus on the effects of multiple soil layers and construction sequencing of dual tunnels. Results show that using the step-excavation technique can render a higher safety factor for the excavation of a tunnel compared to the entire cross-section being excavated all at once. The failure mechanisms for each different construction stage are discussed and corresponding key locations are suggested to monitor the safety during tunneling. Simultaneous excavation of dual tunnels in the same cross-section should be expressly avoided considering their potential negative interactions. The normal and shear forces as well as bending moment of the primary lining and locking anchor pipe are found to reach their maximum value at Stage 6, before closure of the primary lining. Designing these struts should consider the effects of different construction stages of shallow tunneling method.