• Title/Summary/Keyword: estimate cost

Search Result 1,652, Processing Time 0.027 seconds

Modeling Korean Energy Consumption Behavior Using a Concavity Imposed Translog Cost Function (정규성 개선에 중점을 둔 제조업 에너지 수요구조 모형 연구 : 오목성 조건을 만족하는 Translog 비용함수 모형)

  • Kim, Jihyo;Heo, Eunnyeong
    • Environmental and Resource Economics Review
    • /
    • v.19 no.3
    • /
    • pp.633-658
    • /
    • 2010
  • In this paper, we estimate the Translog cost function in Korean manufacturing, using capital (K), labor (L), material (M), electricity (E), fuel (F) data over the period from 1970 to 2005. Especially, this paper investigates the impact of imposing concavity in the estimation of a Translog cost function. Although the value of log-likelihood is somewhat reduced in a concavity imposed function rather than a function which is not, a concavity imposed function satisfies regularity conditions (monotonicity, positivity, concavity) at all data points. We also calculate price elasticities using a concavity imposed Translog cost function. Electricity complements capital so electricity demand increases as capital demand increases. Meanwhile, electricity substitutes labor, fuel, and material. These results show that Korean manufacturing experienced a structural change of increase in electricity demand.

  • PDF

Estimation of Willlingness-to-pay of Residents for Rehabilitation of the Existing Water Pipes at Inche (인제군의 상수관로 개량을 위한 주민의 지불의사금액 추정)

  • Lee, Jae Hoon;Jeong, Dong Whan;Shin, Seung Bok;Park, Kyoo Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.4
    • /
    • pp.385-394
    • /
    • 2007
  • The objective of this study was to estimate social cost on rehabilitation of existing water pipes by investigating the willingness-to-pay (WTP) of residents at INJE County to avoid the loss and inconvenience of transportation and business resulting from the sudden failure and leaks of old water pipes. Contingent valuation method was used through conducting survey to 180 residents in Inche County, with questions of double-bounded dichotomous choice. The resulting WTP of residents at Inche was 7,682 won/month/household. The annual social cost could be estimated as 960 million won, which might be caused by the failure of the old water pipes at INJE County.

Estimating Optimum Investment Cost for Obsolete School Buildings (노후화된 학교건물의 적정시설투자비 산정모델 적용사례)

  • Huh, Young-Ki
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.10 no.1
    • /
    • pp.10-25
    • /
    • 2011
  • Area Offices of Education in Korea assign and execute government budget based on the evaluation of school buildings' safety rating and degree of their deterioration. However, it is never easy to estimate the most appropriate investment amount for old buildings under consideration of their service lives and residual values together. A model of estimating optimum investment cost for obsolete school building is developed taking its life cycle cost into account. The model is also applied to six old buildings in five different schools and found that some of the facilities hardly needed further investment and were better to be rebuilt. The study results will be a great beneficial for officers to make right decision on maintaining obsolete school buildings and to maximize tax payers' money.

A Performance Comparison of Block-Based Matching Cost Evaluation Models for FRUC Techniques

  • Kim, Jin-Soo;Kim, Jae-Gon
    • Journal of information and communication convergence engineering
    • /
    • v.9 no.6
    • /
    • pp.671-675
    • /
    • 2011
  • DVC (Distributed Video Coding) and FRUC (Frame Rate Up Conversion) techniques need to have an efficient motion compensated frame interpolation algorithms. Conventional works of these applications have mainly focused on the performance improvement of overall system. But, in some applications, it is necessary to evaluate how well the MCI (Motion Compensated Interpolation) frame matches the original frame. For this aim, this paper deals with the modeling methods for evaluating the block-based matching cost. First, several matching criteria, which have already been dealt with the motion compensated frame interpolation, are introduced and then combined to make estimate models for the size of MSE (Mean Square Error) noise of the MCI frame to original one. Through computer simulations, it is shown that the block-based matching criteria are evaluated and the proposed model can be effectively used for estimating the MSE noise.

Economic Evaluation of ESS in Urban Railway Substation for Peak Load Shaving Based on Net Present Value

  • Park, Jong-young;Heo, Jae-Haeng;Shin, Seungkwon;Kim, Hyungchul
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.981-987
    • /
    • 2017
  • In this paper, we estimate the economic benefits of Energy Storage Systems (ESSs) for peak load shaving in an urban railway substation using the annual cost. The annual investment cost of ESSs is estimated using Net Present Value (NPV) and compared with the cost reduction of electricity by the ESS. The optimal capacities of the battery and Power Converting System (PCS) are determined for peak load shaving. The optimal capacity of the ESS and the peak load shaving is determined to maximize the profit by the ESS. The proposed method was applied to real load data in an urban railway substation, and the results show that electric power costs can be reduced. Other aspects of the ESS, such as the lifetime and unit price of the battery, are also investigated economically.

Data Structure Modeling for the LCC Analysis of the Plate Girder Bridge Considering Corrosion (부식을 고려한 판형교의 LCC 분석 데이터구조 설계)

  • Kim, Dong-Hyun;Kim, Bong-Geun;Lee, Sang-Ho
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.497-500
    • /
    • 2007
  • Data structure was designed not only to estimate LCC but also to analyze time-variant reliability index of plate girder bridges. Information model for data structure was categorized into cost information, cost variable information, user cost information, and reliability analysis information according to the characteristic of data. EXPRESS language of STEP was adopted to describe the data structure for the electronic representation of LCC information. The suitability of the developed data structure was verified by estimating LCC and analyzing time-variant reliability index of a plate girder bridge considering corrosion on the basis of the constructed test database.

  • PDF

Estimation of Rebate Level for Energy Efficiency Programs Using Optimization Technique (최적화 기법을 이용한 에너지 효율 프로그램의 지원금 수준 산정)

  • Park, Jong-Jin;So, Chol-Ho;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.3
    • /
    • pp.369-374
    • /
    • 2008
  • This paper presents the evaluation procedures and the estimation method for the estimation of optimal rebate level for EE(Energy Efficiency) programs. The penetration amount of each appliance is estimated by applying price function to preferred diffusion model resulted from model compatibility test. To estimate the optimal rebate level, two objective functions which express the maximum energy saving and operation benefit are introduced and by multi-objective function which can simultaneously consider two objective functions the optimal rebate level of each appliance is estimated. And then, using the decided rebate level and each penetration amount, the priority order for reasonable investment of each high-efficiency appliance is estimated compared to the results of conventional method. Finally, using a benefit/cost analysis based on California standard practice manual, the economic analysis is implemented for the four perspectives such as participant, ratepayer impact measure, program administrator cost and total resource cost.

A Study on the Burn-in Optimization of Computer Monitor (Computer용 Monitor 완제품의 Burn-in 최적화에 관한 연구)

  • Park, Jong-Man
    • Journal of Korean Society for Quality Management
    • /
    • v.23 no.4
    • /
    • pp.148-156
    • /
    • 1995
  • The past approach to burn-in optimization have been focused mainly in cost minimization problem during entire product life cycle. But in the case of practical application, burn-in optimization under reliability restriction might be preferred to burn-in optimization by cost minimization. Accordingly this paper shows real examples which estimate the practical burn-in period through application of heuristic method and select the best reliability model through comparison of reliability performance measures.

  • PDF

Dissecting Gains from Trade: Changes in Welfare Cost of Autarky

  • Kharel, Paras
    • East Asian Economic Review
    • /
    • v.22 no.3
    • /
    • pp.275-306
    • /
    • 2018
  • Amid a general rise in protectionism and a trade war between the world's two largest economies, this paper analyzes changes in gains from trade for the world over a decade marked by rapid global economic integration preceding the global financial crisis of 2007-08. It employs state-of-the-art quantitative trade models based on the gravity equation to estimate autarky gains from trade, as well as a recently introduced ANOVA-type structural estimation of the gravity equation to obtain trade costs free of residual trade cost bias. Between 1995 and 2006, the cost of moving to autarky increased by about 45% on average. A decomposition exercise suggests most of the increase in autarky gains from trade on average was due to increases in import shares in total spending, with a limited role for reallocations of spending across sectors with varied trade elasticities. Changes in trade costs between 1995 and 2006 are found to have increased autarky gains from trade, as measured in 2006, by up to 100%.

An Investment Cost Analysis of the IMT-2000 Mobile Communications Industry (국내 차세대이동통신 사업의 투자비 분석)

  • Jang, Hee-Seon;Lee, Kwang-Hee;Rim, Myung-Hwan
    • IE interfaces
    • /
    • v.14 no.3
    • /
    • pp.318-325
    • /
    • 2001
  • In this paper, we estimate the investment cost for the IMT-2000 services in Korea. The network elements for the IMT-2000 system are drawn out and the required number of base stations(Node-B) is predicted by using the coverage of the base station. With the assumption of the 2-generation mobile communications network configuration, the number of radio network controllers(RNC's) and core network facilities is estimated. We also setup different scenarios by considering the utilization of the transmission facilities between base stations, RNC's and switching systems, and then evaluate the investment cost for each scenario.

  • PDF