• Title/Summary/Keyword: equipment accident

Search Result 566, Processing Time 0.024 seconds

The study for image transmission method using communication equipment of KNR (철도연변의 통신설비를 이용한 화상전송방안에 관한 연구)

  • Cho, B.K.;Chang, S.G.;Ryu, S.H.;Kim, J.K.
    • Proceedings of the KIEE Conference
    • /
    • 2003.04a
    • /
    • pp.429-431
    • /
    • 2003
  • CCTV network has been implemented to transmit the image information of platform, ticket gate and transfer section to local headquarters in the KNR(Korean National Railroad). But, communication system for transferring image information around accident field or wayside has not been established ret. thus, at Present implementation of communication equipment is necessary for dynamic image of unspecified accident to be transmitted to headquarters. Copper cable communication network is run by KNR, but it is processing installation of optical cable in connection with the implemental plan for high-speed network from now on. And, the capacity of communication channel will be guaranteed much more than now between station and station. station and central headquarters when optical cable is completed. This study analyzes the image equipment of field for transmission and estimated matters to transmit image information of accident field to headquarters with using communication infrastructure. And, the study considers implemental method of communication network for long-distance image transmission from dozens to hundreds kilometers.

  • PDF

An Analysis of Operating Experience Reports Published in the Domestic Nuclear Power Plants for Resent 5 Years (최근 5년간 국내원전 운전경험보고서 분석)

  • Lee, Sang-Hoon;Kim, Je-Hun;Hur, Nam-Young
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.9 no.1
    • /
    • pp.35-39
    • /
    • 2013
  • The Operating Experience Report(OER) has written about the event and accident happened at a Nuclear Power Plant(NPP). The purpose of publishing the OER is to prevent the similar event or accident repeatedly by spreading the experience of a single plant to other plants personnel. Before initiating the analysis mentioned in this paper, 2,298 review reports for the same number of OER published from 2007 to June 2012 have been written to achieve the correct and objective statistics. The analysis introduced in this paper is performed with the various factors such as year, plant type, equipment, type of work, root-cause. The root-cause analysis is showed that the equipment problem is the major factor in domestic NPPs, but on the other hand human-error is the main part of the foreign NPPs. Moreover, while the number of the man-made event is decreasing, the equipment-made event is rapidly increasing in domestic NPPs.

Design Research for Life-saving Rescue Equipment at Water (익수자 구조를 위한 구조 장비 디자인 연구)

  • Jeon, Yeongwon;Lee, Hyuksoo
    • Journal of Institute of Convergence Technology
    • /
    • v.2 no.2
    • /
    • pp.13-19
    • /
    • 2012
  • This Design research is a design of rescue equipment combined with beach garbage can for prompt rescue at the time of the accident in water. As a usual, it is used as garbage can hanging a garbage bag on the holders located in both sides, and it can be used to rescue drowning men promptly taking out a rescue tube located inside of the equipment at the time of the accident in water. Support is consisted of beach one, wall-hanging one and pipe one, and it could be installed to match the situation because it can be combined with all main frames. As a usual, it is used as garbage can in seaside, but it can be used to rescue drowning men promptly taking out a rescue tube after pulling the handle located in front of main frame at the time of the accident in water, and it can be used to pull drowning men out of the water because rope is kept in rescue tube.

  • PDF

Time uncertainty analysis method for level 2 human reliability analysis of severe accident management strategies

  • Suh, Young A;Kim, Jaewhan;Park, Soo Yong
    • Nuclear Engineering and Technology
    • /
    • v.53 no.2
    • /
    • pp.484-497
    • /
    • 2021
  • This paper proposes an extended time uncertainty analysis approach in Level 2 human reliability analysis (HRA) considering severe accident management (SAM) strategies. The method is a time-based model that classifies two time distribution functions-time required and time available-to calculate human failure probabilities from delayed action when implementing SAM strategies. The time required function can be obtained by the combination of four time factors: 1) time for diagnosis and decision by the technical support center (TSC) for a given strategy, 2) time for strategy implementation mainly by the local emergency response organization (ERO), 3) time to verify the effectiveness of the strategy and 4) time for portable equipment transport and installation. This function can vary depending on the given scenario and includes a summation of lognormal distributions and a choice regarding shifting the distribution. The time available function can be obtained via thermal-hydraulic code simulation (MAAP 5.03). The proposed approach was applied to assess SAM strategies that use portable equipment and safety depressurization system valves in a total loss of component cooling water event that could cause reactor vessel failure. The results from the proposed method are more realistic (i.e., not conservative) than other existing methods in evaluating SAM strategies involving the use of portable equipment.

Detection of Indication of Electric Accident in Simulated Electric Equipments Using Standard Deviation and Probability Distribution (표준편차와 확률분포를 이용한 모의전기설비에서 사고징후 검출)

  • Jee, Seung-Wook;Ok, Kyung-Gea;Kim, Shi-Kuk;Lee, Chun-Ha
    • Fire Science and Engineering
    • /
    • v.23 no.3
    • /
    • pp.11-16
    • /
    • 2009
  • This paper describes a detecting method for indication of an electric accident in electric equipments. For that, loads of electric equipment is consisted of incandescent lamps. And the electric accident is simulated a tracking test apparatus according to KS C IEC (Korea Standard C International Electrostatic Commission) 60112 at some part of the simulation of the electric equipment. Simulated electric accident is occurred from static states through discharge in progress, carbon formation to tracking breakdown. The total current of electric equipments is measured and analyzed for detecting of indication of the electric accident using a current monitor. For the result, as an electric accident processed, as a current pulse is bigger and a ratio of appearance also increases at certain part of current waveforms. And standard deviation and probability distribution for certain part of current waveforms show remarkably different pattern in each step of electric accident which is irrespective of amount of load.

Development of Safety Equipment using Laser Radar Sensor for Railway Platform

  • Hwang, Jong-Gyu;Kim, You-Ho;Jo, Hyun-Jeong;Choi, Kwon-Hee;Ko, Tae-Kuk
    • International Journal of Safety
    • /
    • v.9 no.2
    • /
    • pp.35-40
    • /
    • 2010
  • Many casualties are being occurred due to many misses the railway platform, and the accident occurrence is being increased. Recently in Korea, efforts to prevent casualties fundamentally are being made by installing and operating the PSD(Passenger Screen Door) as to prevent these casualties of passengers. However, in case of the PSD system, although it can solve the problem of public casualties at platform fundamentally, it is impossible to install it at whole railway platforms. This paper proposes the safety equipment using LaserRadar sensor for the prevention against casualties of passengers at platform. The safety equipment using novel sensor is the safety equipment making an approaching train stopped if the falling object is a person by detecting the obstacle at platform, and it has the merit possible to apply it to platform since it may detect accurately under ambient environmental elements such as the snow, rain and yellow dust, etc. also. We manufactured a prototype of the safety equipment to reduce public casualties at platform by using LaserRadar sensor and carried out its performance test, and the result is presented in this paper.

Analysis of faust cause & insulation degradation on the electrical equipments for railway (철도용 전기기기의 고장요인 및 절연열화 분석)

  • 왕종배;전한준;박옥정;온정근
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2001.07a
    • /
    • pp.207-210
    • /
    • 2001
  • Electrical equipment for railway is always experiencing wear and degradation by mechanical, electrical and environmental stress in service and the fault or the accident of high voltage main circuit directly causes operation interruption. Particularly propulsion drive of high speed switching inverter takes the form of specific degradation mechanism such as fast rising transient surge, reflective overvoltage and harmonic stress, and it is known that it threatens the long life and the reliability of electrical equipment. In this paper, statistics of fault and accident on main electrical equipment for railway are presented and also insulation degradation mechanism, which governs end life of electrical device, is analyzed. Finally the method of fault respondence and reliability improvement on the main electrical equipments will be reviewed in order to prevent operation interruption.

  • PDF

Basic Study on Alarming System for Preventing Construction Equipment Safety Accident (건설 장비의 안전사고 예방을 위한 알람시스템 기초 연구)

  • Ryu, Han-Guk;Kang, Jin-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.57-58
    • /
    • 2018
  • The number of deaths in the korean construction industry is more than three times the OECD average. Although safety management system should be improved to prevent the safety accidents, it is difficult to improve due to domestic safety conditions. Especially, in order to prevent accidents at construction sites, there is an increasing tendency to monitor the movement of workers and equipment in real time by introducing a location positioning system. Therefore, this study proposes a system that can monitor the position of workers and heavy equipments in real - time, detect danger and transmit alarms so that workers can pay attention to safety and keep safety. The system is expected to reduce safety accidents by transmitting alarms to workers so that they can pay attention.

  • PDF

A Study on The Estimation of Accident Loss Prevention Cost and Risk Analysis in Subway Construction (지하철 건설현장 재해 분석 및 재해손실비용 추정에 관한 연구)

  • 최명기
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.5
    • /
    • pp.77-81
    • /
    • 2001
  • The industrial accident in subway of late is increasingly coming to the front as a serious problem of society because a scale of industrial accident is a large size, and powerfulness, while the percent of accident is decreasing as a result of industrial facilities with the largeness of equipment, automation, and high horse-powering. In this paper, a study on the estimation of accident loss prevention cost and risk analysis in subway construction is proposed as an alternative to the techniques currently used in the general construction projects safety. Then the concept of risk evaluation using a risk assessment model is presented to drive value of risk and numerical example for risk analysis. A means for this does grasp the importance of educational factor by way of analyzing the causes of accident through statistical data of labor department, emphasizing the necessity and the importance of safety education, being helpful to act safety by decreasing insecure activity which ranks the majority of accident causes with putting the education program, form, method into practice that are suitable for a place of business.

  • PDF

Typical Pseudo-accident Scenarios in the Petrochemical Process (석유화학 공정의 가상사고 시나리오 유형분석)

  • 윤동현;강미진;이영순;김창은
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.3
    • /
    • pp.75-80
    • /
    • 2003
  • This paper presents a set of typical pseudo-accident scenarios related to major equipments in petrochemical plants, which would be useful for performing such quantitative risk analysis techniques as fault tree analysis, event tree analysis, etc. These typical scenarios address what the main hazard of each equipment might be and how the accident might develop from an "initiating event". The proposed set of accident scenarios consists of total thirteen (13) scenarios specific for five (5) major equipments like reactor, distillation column, etc., and has been determined and screened out of one hundred and twenty-five (125) potential accident scenarios that were generated by performing semi-quantitative risk analysis practically for twenty-five (25) petrochemical processes, considering advices from the operation experts. It is assumed that with simple consideration or incorporation of plant-specific conditions only, the proposed accident scenarios could be easily reorganized or adapted for the relevant process with less time and labor by the safety engineers concerned in the petrochemical industries.ndustries.