• Title/Summary/Keyword: engineering model management system

검색결과 2,896건 처리시간 0.032초

A Proposal of Quality Assessment for System Model

  • Onozuka, Yuki;Ioki, Makoto;Shirasaka, Seiko
    • 시스템엔지니어링학술지
    • /
    • 제12권2호
    • /
    • pp.59-67
    • /
    • 2016
  • Recently, the increased complexity of systems has made systems engineering necessary. It is very useful for system designers to understand the whole context of the concerned system based on systems engineering. A system model can be used to describe the outcome of a system design. A system model describes the system from the viewpoint of the stakeholder's needs using the mutually exclusive and collectively exhaustive principle. A system model can be used to smoothly design a large and complicated system based on the systems engineering development process. Many companies and countries are attempting to apply model-based systems engineering, and the significance of the system model quality is increasing as system models are referenced during system development. In this paper, we propose a quality assessment method for ontology which is one of system models by focusing on the system development process. First, in this process, a system developer should explicitly show the relationship between viewpoints. Then, the system developer should select dependent rather than independent viewpoints. With dependent viewpoints, each viewpoint used to describe the system has some logical relationship. The set of viewpoints makes it possible to show, not only tangible and physical system parts, but also conceptual system parts. In this paper, we develop an ontological system model of a Japanese weather observation system. By comparing some ontological system models, we verify the effectiveness of explicitly describing the relationships between viewpoints and select dependent viewpoints.

SI 프로젝트관리 프로세스 개발 (Development of Project Management Process for System Integration)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제35권3호
    • /
    • pp.163-172
    • /
    • 2012
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to system integration projects. This system integration project management process model is composed of six top processes of initiation, preparation for contract, planning, implementation management, coordination and control, and termination and transfer. The five processes are re-divided into 25 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. For this model development, it has chosen the items which constituted a process through a questionnaire of experts.

BETTER INPUTS FOR KNOWLEDGE MANAGEMENT INFORMATION SYSTEMS: KNOWLEDGE SHARING MODELING AND THE INCENTIVES SYSTEM DESIGN

  • S. Ping Ho;Yaowen Hsu;Szu-Wei Lo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.564-568
    • /
    • 2005
  • Recently, Knowledge Management (KM) has been applied to construction industry. Surprising, there is few studies that address the most fundamental problem in KM: people may prefer not to share their knowledge so as to preserve their intellectual or unique values in the organization. Without the premise of each individual's willingness to share knowledge, there will be no valuable input for the IT system and, thus, no knowledge management at all. This paper aims to model the behavioral dynamics of knowledge sharing and to design an incentive system that may facilitate knowledge sharing for construction companies. In this paper, a game-theory based model will be developed, and the framework for designing an incentive system will be proposed according to the model.

  • PDF

하천유역의 홍수관리 시스템 모델 (Flood-Flow Managenent System Model of River Basin)

  • Lee, Soon-Tak
    • 물과 미래
    • /
    • 제26권4호
    • /
    • pp.117-125
    • /
    • 1993
  • A flood -flow management system model of river basin has been developed in this study. The system model consists of the observation and telemetering system, the rainfall forecasting and data-bank system, the flood runoff simulation system, the dam operation simulation system, the flood forecasting simulation system and the flood warning system. The Multivariate model(MV) and Meterological-factor regression model(FR) for rainfall forecasting and the Streamflow synthesis and reservoir regulation(SSARR) model for flood runoff simulation have been adopted for the development of a new system model for flood-flow management. These models are calibrated to determine the optimal parameters on the basis of observed rainfall, streamflow and other hydrological data during the past flood periods. The flood-flow management system model with SSARR model(FFMM-SR,FFMM-SR(FR) and FFMM-SR(MV)), in which the integrated operation of dams and rainfall forecasting in the basin are considered, is then suggested and applied for flood-flow management and forecasting. The results of the simulations done at the base stations are analysed and were found to be more accurate and effective in the FFMM-SR and FFMM0-SR(MV).

  • PDF

SERVQUAL 모델을 통한 서비스품질 시스템에 관한 연구 (Study on Service Quality System through the SERQUAL model)

  • 김수연;이상복
    • 한국품질경영학회:학술대회논문집
    • /
    • 한국품질경영학회 2006년도 추계 학술대회
    • /
    • pp.73-78
    • /
    • 2006
  • In Modern Industrial Society, Service industry are became more important and larger. It is necessary in Serve industry that Service Quality system(SQS) which is as like Total Quality Management system. In this appaer, we propose Service Quality System Model which is compose Monitoring-Analysis-Validate-Improve-Control(MAVIC). Specially Monitoring-Analysis are measured and analysis by using SERVQUAL model.

  • PDF

Measuring Performance in Egyptian Construction Firms Applying Quality Management Systems

  • Abd Elhamid, Manal S.;Ghareeb, Sahar.Sh.
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.18-27
    • /
    • 2011
  • Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies have shown. However, considering all the firm's aspects in a competitive way is a crucial process for the ECF's culture. This research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance at the organizational level, and to explore its impact on the organizations that adopt QMS. This model is based on specific elements and their related indicators which have been derived from national approaches and models of MP. This model determines the performance level (PL) of the organization that is measured by means of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the ECFs. This model has been validated using another questionnaire and the majority of surveyed experts agreed that the proposed model can be applied effectively.

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

A System Dynamics View of Safety Management in Small Construction Companies

  • Guo, Brian H.W.;Yiu, Tak Wing;Gonzalez, Vicente A.
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권4호
    • /
    • pp.1-6
    • /
    • 2015
  • Due to unique characteristics of small construction companies, safety management is comprised of complex problems. This paper aims to better understand the complexity and dynamics of safety management in small construction companies. A system dynamics (SD) model was built in order to capture the causal interdependencies between factors at different system levels (regulation, organization, technical and individual) and their effects on safety outcomes. Various tests were conducted to build confidence in the model's usefulness to understand safety problems facing small companies from a system dynamics view. A number of policies were analyzed by changing the value of parameters. The value of a system dynamics approach to safety management in small construction companies is its ability to address joint effects of multiple safety risk factors on safety performance with a systems thinking perspective. By taking into account feedback loops and non-linear relationships, such a system dynamics model provides insights into the complex causes of relatively poor safety performance of small construction companies and improvement strategies.

DEVELOPMENT OF MATDYMO(MULTI-AGENT FOR TRAFFIC SIMULATION WITH VEHICLE DYNAMICS MODEL) II: DEVELOPMENT OF VEHICLE AND DRIVER AGENT

  • Cho, K.Y.;Kwon, S.J.;Suh, M.W.
    • International Journal of Automotive Technology
    • /
    • 제7권2호
    • /
    • pp.145-154
    • /
    • 2006
  • In the companion paper, the composition and structure of the MATDYMO (Multi-Agent for Traffic Simulation with Vehicle Dynamic Model) were proposed. MATDYMO consists of the road management system, the vehicle motion control system, the driver management system, and the integration control system. Among these systems, the road management system and the integration control system were discussed In the companion paper. In this paper, the vehicle motion control system and the driver management system are discussed. The driver management system constructs the driver agent capable of having different driving styles ranging from slow and careful driving to fast and aggressive driving through the yielding index and passing index. According to these indices, the agents pass or yield their lane for other vehicles; the driver management system constructs the vehicle agents capable of representing the physical vehicle itself. A vehicle agent shows its behavior according to its dynamic characteristics. The vehicle agent contains the nonlinear subcomponents of engine, torque converter, automatic transmission, and wheels. The simulation is conducted for an interrupted flow model and its results are verified by comparison with the results from a commercial software, TRANSYT-7F. The interrupted flow model simulation is implemented for three cases. The first case analyzes the agents' behaviors in the interrupted flow model and it confirms that the agent's behavior could characterize the diversity of human behavior and vehicle well through every rule and communication frameworks. The second case analyzes the traffic signals changed at different intervals and as the acceleration rate changed. The third case analyzes the effects of the traffic signals and traffic volume. The results of these analyses showed that the change of the traffic state was closely related with the vehicle acceleration rate, traffic volume, and the traffic signal interval between intersections. These simulations confirmed that MATDYMO can represent the real traffic condition of the interrupted flow model. At the current stage of development, MATDYMO shows great promise and has significant implications on future traffic state forecasting research.

ISO 9000:2000/KS A 9001:2001을 이용한 제조업의 품질경영시스템 구축 모텔 (Construction Model of Quality Management System Using ISO 9000:2000/KS A 9001:2001 in Manufacturing industry)

  • 우정열;강형규;황승국;강성수
    • 한국산업경영시스템학회:학술대회논문집
    • /
    • 한국산업경영시스템학회 2002년도 춘계학술대회
    • /
    • pp.433-438
    • /
    • 2002
  • A construction model of quality management system in manufacturing industry focuses on process approach and continual improvement amongst the quality management 8 principles which are elements of quality management system of ISO 9000:2000 family standards, and proposes the model that can construct quality management system throughout the process approach as more simple and effective way in developing and applying a quality management system for characteristics of the manufacturing industry.

  • PDF