• Title/Summary/Keyword: end zone of concret deck

Search Result 1, Processing Time 0.018 seconds

A Case Study on Chloride Corrosion for the End Zone of Concrete Deck Subjected to De-icing Salts Added Calcium Chloride (염화칼슘이 함유된 제설제로 인한 콘크리트 바닥판 단부의 염해에 관한 사례 연구)

  • Chung, Jee-Seung;Kim, Bo-Heon;Kim, Il-Sun
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.87-93
    • /
    • 2014
  • In this study, the reinforced concrete rahmen bridge damaged by the chloride attack was investigated. According to the investigation, the degraded concretes on cantilever kerb and end part were intensively observed. Thus, the chloride content test and half-cell method were performed to evaluate the degraded parts. As a result, the contents of chloride on degraded parts were C and D grade. On the other hand, the half-cell potential values of rebar in degraded concrete were measured with the minor corrosion. This rebar corrosion is expected to progressing. Chloride content D grade is due to expansion pressure by corrosion of rebar and freeze-thaw by permeate water, could see progresses rapidly degradation. In order to prevent chloride attack to concrete deck caused by deicing salts, corresponding to the chloride critical concentration must maintain grade b or at least grade c. Chloride condition evaluation standard apply to evaluation of marine structure chloride attack with chloride attack by deicing salts.