• Title/Summary/Keyword: electrical load saving effect

Search Result 11, Processing Time 0.03 seconds

Electric energy saving system with high speed response to load variation using power-factor correction (부하변동에 속응하는 역률개선형 전력절감시스템)

  • Kim, Tae-Soo;Kang, Hyung-Sik;Joo, Kyung-Don;Lyu, Seung-Heon;Koo, Kyung-Wan;Han, Sang-Ok
    • Proceedings of the KIEE Conference
    • /
    • 2002.07d
    • /
    • pp.2388-2390
    • /
    • 2002
  • Small type electric energy saving system is proposed in this paper. The system improves power factor fastly according to load variation of each customer. Phases of voltage and current are detected as 1[ms] unit. Phase coincident algorithm is applied for power factor improvement. Capacitance is controlled for optimal power factor correction. Series reactor is controlled for harmonics reduction. Non-contact device is used for fast response and long life. Test result shows the effect of this system. Power factor of 40[W] electric fan is improved from 95[%] to 100[%]. In the case of electric light, power factor is improved from 82[%] to 100[%]. Response time for load variation is less than 1[ms].

  • PDF

A study on the saving of energy consumption load using electrical heat control system (전기적 열제어 시스템을 사용한 에너지 소비량 감소에 관한 연구)

  • Han, Kyu Il
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.49 no.1
    • /
    • pp.58-66
    • /
    • 2013
  • Most of steam power plant in Korea are heating the feed water system to prevent freezing water flowing in the pipe in winter time. The heating system is operated whenever the ambient temperature around the power plant area below 5 degree Centigrade. But this kind of heat supplying system cause a lot of energy consuming. If we think about the method that the temperature of the each pipe is controled by attaching the temperature measuring sensor like RTD sensor and heat is supplied only when the outer surface temperature of the pipe is under 5 degree Centigrade, then we can save a plenty of energy. In this study, the computer program package for simulation is used to compare the energy consumption load of both systems. Energy saving rate is calculated for the location of Youngweol area using the data of weather station in winter season, especially the January' severe weather data is analyzed for comparison. Various convection heat transfer coefficients for the ambient air and the flowing water inside the pipe was used for the accurate calculation. And also the various initial flowing water temperature was used for the system. Steady state analysis is done previously to approximate the result before the simulation. The result shows that the temperature control system using RTD sensor represents the high energy saving effect which is more than 90% of energy saving rate. Even in the severe January weather condition, the energy saving rate is almost 60%.

Performence Characteristics and Analysis Effect of Maximum Power Saving Device in Metal Parts Heat Treatment Company (금속 부품 열처리업체의 최대전력절감장치 동작 특성 및 효과 분석)

  • Chang, Hong-Soon;Han, Young-Sub;Hwang, Ik-Hwan;Seo, Sang-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.40-44
    • /
    • 2014
  • In this paper, maximum power is the lowering device using the facility's energy use and peak load electricity through analyzing attitude should like to make it reduce its power base rate. Simulator to manage the demand for power, a maximum electric power base power from electronic watt-hour meters by a device's signal, predictive power, the current power by computing the goal of power for less than Maximum peak power and peak shift, so that you can manage, and peak York, which role you want a cut Metal heat treatment result which analyzes the data, demand for electricity company over the years of analyzing the characteristics of each load, and effects and Reducing power consumption device every month identified seven Sequence control to the load system and successful power control is about showing that the defined goals.

Analysis of Electricity Cost Saving Effect by the Optimal load shifting Operation with 1MWh Redox Flow Battery (1MWh급 레독스흐름전지의 부하이전용 최적운전에 따른 전기요금 절감효과 분석)

  • Baek, Ja-Hyun;Ko, Eun-Young;Kang, Tae-Hyuk;Lee, Han-Sang;Cho, Soo-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.7
    • /
    • pp.1151-1160
    • /
    • 2016
  • In recent years, the energy storage systems such as LiB, NaS, RFB(Redox-Flow Battery), Super- capacitor, pumped hydro storage, flywheel, CAES(Compressed Air Energy Storage) and so on have received great attention as practical solutions for the power supply problems. They can be used for various purpose of peak shaving, load leveling and frequency regulation, according to the characteristics of each ESS(energy storage system). This paper will focus at 1 MWh RFB system, which is being developed through the original technology project of energy material. The output of ESS is mainly characterized by C-rate, which means that the total rated capacity of battery will be delivered in 1 hour. And it is a very important factor in the ESS operation scheduling. There can be several options according to the operation intervals 15, 30 and 60minutes. The operation scheduling is based on the optimization to minimize the daily electricity cost. This paper analyzes the cost-saving effects by the each operating time-interval in case that the RFB ESS is optimally scheduled for peak shaving and load leveling.

A Study on the Power Saving Fraction of Site Electrical Load depending on the installation area of PV system in Apartment Complex (공동주택 단지 배치유형별 PV시스템 최적 설치면적 및 전기부하 기여율 평가 연구)

  • Yoon, Jong-Ho;Park, Jae-Sung;Shin, U-Cheul
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.3
    • /
    • pp.60-66
    • /
    • 2008
  • This study is to investigate an optimal size and position of PV system for apartment complex through the electrical load matching analysis. The 4 types of arrangements of apartment buildings are considered as follows; ㅡtype, alternative ㅡtype, ㄱtype and ㅁtype. We assume that the studied site is composed of 9 buildings. Firstly, solar access evaluation of roof and facade in apartment buildings was performed with the hourly simulations of total received insolation on each surface considering the shading effect of buildings. Electrical load profile of typical Korean apartments were investigated for the load matching analysis. To calculate an annual total PV output, we used MERIT program which is a hourly based load matching tool developed by ESRD. TRY weather data of Daejeon are applied for this analysis. Result shows that approximately 11% of total electric load of the site can be supplied by the PV system in the case of full installation of PV system at the whole south-face roof area of 9 buildings in this stuided apartment complex. Depending on a various installation option of roof and facade area, the possible ratio of PV supply in total electrical load varies from 9% to 42%. Among the 4 arrangement types, the ㅡtype revealed the best option for the maximum output of PV system.

Particle Swarm Optimization-Based Peak Shaving Scheme Using ESS for Reducing Electricity Tariff (전기요금 절감용 ESS를 활용한 Particle Swarm Optimization 기반 Peak Shaving 제어 방법)

  • Park, Myoung Woo;Kang, Moses;Yun, YongWoon;Hong, Seonri;BAE, KUK YEOL;Baek, Jongbok
    • Journal of IKEEE
    • /
    • v.25 no.2
    • /
    • pp.388-398
    • /
    • 2021
  • This paper proposes a particle swarm optimization (PSO)-based peak shaving scheme using energy storage system (ESS) for electricity tariff reduction. The proposed scheme compares the actual load with the estimated load consumption, calculates the additional output power that the ESS needs to discharge additionally to reduce peak load, and adds the input. In addition, in order to compensate for the additional power, the process of allocating power to the determined point is performed, and an optimization that minimizes the average of the load expected at the active power allocations using PSO so that the allocated value does not affect the peak load. To investigated the performance of the proposed scheme, case study of small and large load prediction errors was conducted by reflecting actual load data and load prediction algorithm. As a result, when the proposed scheme is performed with the ESS charge and discharge control to reduce electricity tariff, even when the load prediction error is large, the peak load is successfully reduced, and the peak load reduction effect of 17.8% and electricity tariff reduction effect of 6.02% is shown.

A Study on the Effective Utilization Plan through Field Investigation and Analysis with Power Transformers in Domestic Areas

  • Shin, Heung-Sik;Lee, Jae-Cheon;Bai, Seok-Myung;Kim, Seon-Gu;Kim, Jin-Tae;Kim, Gi-Hyeon;Jeong, Jong-Wook;Bang, Seon-Bae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.4
    • /
    • pp.88-95
    • /
    • 2007
  • Korea is highly dependent on foreign countries for energy while at the same time having a high energy-consumption industrial structure. Therefore, logical improvements in energy use efficiency and nationwide energy saving are becoming more and more important in coping with the worldwidehigh oil prices and environmental issues such as listed in the Kyoto Protocol to the United Nations Framework Convention on Climate Change. Consequently, a study was conducted on the average annual load factor in domestic areas to set a reasonable and reliable technology standard plan for high-efficiency transformers. The average annual load factor in Korea was discovered to be 18.4[%] classified by industry. This factor is expected to be used in arranging a domestic standard for a minimum efficiency system for transformers, and in reviewing and supplementing the standard transformers plan for the High Energy-Efficiency Appliance Certification. The expected effect from the establishment of the technology standards plan for highly efficient transformers is the expansion of the manufacturing and distribution of highly efficient transformers that are suitable for domestic use. These will lead to electricity cost savings for users, strengthening the related industries' market competitive powers and the effective reduction of greenhouse gases on a national level by drastically reducing loss from transformers, which accounts for a large portion of the total electric supply losses.

The Performance and Energy Saving Effect of a 2kWp Roof-Integrated Photovoltaic System (주택지붕용 2kWp BIPV시스템의 성능 실험 및 전기 부하 감당에 관한 연구)

  • Lee, Kang-Rock;Oh, Myung-Tack;Park, Kyung-Eun;Kim, Jin-Hee;Kim, Jun-Tae
    • Journal of the Korean Solar Energy Society
    • /
    • v.26 no.1
    • /
    • pp.13-19
    • /
    • 2006
  • The efficiency of building-integrated photovoltaic(BIPV) system is mainly determined by solar radiation and the temperature of PV modules. The performance of BIPV systems is reported to be different from that of conventional PV systems installed in the open-air. This paper presents the relationship of solar radiation and electricity generation from a 2kWp roof-integrated PV system that is applied as building elements on an experimental house, and the energy saving effect of the BIPV system for a typical house. For the performance evaluation of the BIPV system, it produced a regression equation with measured data for winter days. The regression equation showed that a comparison of the measured electricity generation and the predicted electricity generation of the BIPV system were meaningful. It showed that an annual electricity generation of the system appeared to cover around 52% of an annual electricity consumption of a typical domestic house with the floor area of $96m^2$.

Advanced LDC Test Bed Using Energy Recovery Technique for HEVs

  • Kim, Yun-Sung;Jung, Dong-Wook;Lee, Byoung-Kuk
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.4
    • /
    • pp.911-919
    • /
    • 2013
  • This paper reports the development of test bed with the energy recovering technique using two-step boost converter. The device is utilized for LDC aging test of Hyundai Motor's LPI AVANTE HEV in mass production. The developed power recycle type test bed is designed as 1.5 kW class to test up to the maximum load power of LDC and is also designed to supply scant power supply up to 500 W after power recycle. The theoretical design analysis and operational characteristics analysis results of test bed are reported, and its practicality and reliability are verified through the test result. Also, the finally developed test bed confirms approximately 79~85 % energy saving effect compared to the usual traditional aging test system.

Study on the Performance Characteristics with the Height of a Regenerator and Dehumidifier for Liquid Desiccant Dehumidification System (액체식 제습시스템을 위한 재생기와 제습기의 높이에 따른 성능특성에 관한 연구)

  • 이수동;박문수;정진은;최영석
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.16 no.7
    • /
    • pp.630-638
    • /
    • 2004
  • Liquid desiccant dehumidification systems have the ability to provide efficient humidity and temperature control while saving the electrical energy requirement for air conditioning as compared to a conventional system. The dehumidifier and the regenerator form the heart of this system. The latent part of the cooling load is overcome using liquid desiccant. The model regenerator has been designed to study the absorption characteristic of the aqueous triethylene glycol (TEG) solution which is in the flow range from 20 to 50 LPM. Also, this system designed that was able to change the height of the regenerator and dehumidifier. Because the effect of performance have different result according the height. The effect of performance factors of the regenerator with inlet solution flow rate, air flow rate, solution concentration, solution temperature, brine temperature, air temperature and inlet air relative humidity have been analyzed. Data obtained are useful for design guidance and performance analysis of the hybrid air conditioning system.