• Title/Summary/Keyword: electrical grid

Search Result 2,232, Processing Time 0.032 seconds

Construction of the Grid Portal for the Integrated Development Environment in Enterprise Grid. (Enterprise Grid 환경에서의 Integrated Development Environment Grid Portal 구축 제안)

  • Hong Pil-Du;Lee Yong-Woo
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.07a
    • /
    • pp.58-60
    • /
    • 2005
  • 기업의 computing process에서는 기업의 주요업무 및 전략을 분석 정의하여 이것을 computing resource에 실행한다. 이를 위하여, 일반적으로, 여러 개발자들이 공유개발환경을 통하여 프로세스를 개발하고 이를 운영한다. 현재 Enterprise Computing Environment에서는 Grid Computing이 필연적 과제이다. Grid Computing에서, Grid Portal은 통합사용자인터페이스를 제공하여 주는 중요한 요소이다. 그러나, 현재의 대부분의 Grid Portal들은 Job Submit 처리를 중점적으로 구현하는데 주력하고 있기 때문에, 기업 computing process의 중요한 요소인 통합적 개발환경에 대한 지원이 부족하다. 본 연구에서는, 이런 부족한 부분을 개선하여, Enterprise Grid 환경을 위한 통합개발환경의 Grid Portal의 모델을 제안한다.

  • PDF

Analysis and Design of LCL Filter with Passive Damping Circuits for Three-phase Grid-connected Inverters

  • Ahn, Hyo Min;Oh, Chang-Yeol;Sung, Won-Yong;Ahn, Jung-Hoon;Lee, Byoung Kuk
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.1
    • /
    • pp.217-224
    • /
    • 2017
  • The analysis and design process of the LCL filter with passive damping circuits for three-phase grid-connected inverter are presented based on the generalized model of LCL filter. Several types of the passive damping circuits in previous studies could be compared and analyzed by using the generalized model considering various design criteria of passive damping circuits. According to the analysis in this paper, a reasonable configuration of passive damping circuits for three-phase grid-connected inverters is proposed. The validity of the proposed design process is verified by informative simulation and experimental results.

A Novel Approach for the Unit Commitment with Vehicle-to-grid

  • Jin, Lei;Yang, Huan;Zhou, Yuying;Zhao, Rongxiang
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.2 no.3
    • /
    • pp.367-374
    • /
    • 2013
  • The electrical vehicles (EV) with vehicle-to-grid (V2G) capability can be used as loads, energy sources and energy storage in MicroGrid integrated with renewable energy sources. The output power of generators will be reallocated in the considering of V2G. An intelligent unit commitment (UC) with V2G for cost optimization is presented in this paper. A new constraint of UC with V2G is considered to satisfy daily use of EVs. A hybrid optimiza-tion algorithm combined Binary Particle Swarm Optimization (BPSO) with Lagrange Mul-tipliers Method (LMM) is proposed. The difference between results of UC with V2G and UC without V2G is presented.

An Improved Method for Mesh Grounding System Using Spaced Arrangement of Grounding Conductor (접지도체의 간격배치에 따른 개선된 접지설비 모델)

  • Song, Young-Joo;Choi, Hong-Kyoo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.19 no.3
    • /
    • pp.57-65
    • /
    • 2005
  • No matter how well the equally spaced grounding grid is designed, there we questions keep rising, such as leakage of current from comer conductor, high voltage of touch voltage in comers of grid than in center, and high material cost for grounding grid. The best-fitted design for unequally spaced grounding grid is a part that must be considered. Explain advantages of unequally spaced grounding grid and lead formula by dividing the number of grid division, j, into 20, instead of 7. Then, present Dij, which is optimum rate for unequally spaced grounding grid and verify safety and economy of the unequally spaced grounding grid by computer simulation with a poly-nominal function form.

Effect of Double Grid Cathode in IEC Device (IEC 장치에서 이중 그리드 음극의 영향)

  • Ju, Heung-Jin;Kim, Bong-Seok;Hwang, Hui-Dong;Park, Jeong-Ho;Choi, Seung-Kil;Ko, Kwang-Cheol
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.23 no.9
    • /
    • pp.724-729
    • /
    • 2010
  • We have proposed a new configuration on the cathode structure to improve a neutron yield without the application of external ion sources in an inertial electrostatic confinement (IEC) device. A neutron yield in the IEC device is closely related to the potential well structure generated inside the cathode and is proportional to the ion current. Therefore, the application of a double grid cathode structure to the IEC device is expected to produce a higher ion current and neutron yield than at a single grid cathode due to a high electric field strength generated around the cathode. These possibilities were verified as compared with the ion current calculated from both shape of the single and double grid cathode. Additionally from the results of ion's lives and trajectories examined at various outer cathode voltages and grid cathode configurations by using particle simulations, the validity of the double grid cathode was confirmed.

Economic Evaluation Algorithm of Island Micro-grid for Utility and Independent Power Producer (전력회사와 발전사업자 측면에서 도서지역용 마이크로그리드의 경제성평가 알고리즘)

  • Nam, Yang-Hyum;Lee, Hoo-Dong;Kim, Yu-Rim;Marito, Ferrira;Kim, Mi-Young;Rho, Dae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.7
    • /
    • pp.1032-1038
    • /
    • 2017
  • Recently, regulation on carbon emissions has been strengthened according to the new climate change convention (COP21) held in Paris, and then Korea has decided to reduce CO2 emissions by 37% until 2030. As one of countermeasures, the government has energetically performed demonstration projects of island micro-grid including solar power, wind power and energy storage system. However, in order to smoothly introduce island micro-grid, it is a critical issue to carry out the economic evaluation for power utility aspect and independent power producer aspect. Therefore, this paper proposes economic evaluation algorithms of island micro-grid which are based on the present worth method, considering cost and benefit factors in the aspect of both sides. Firstly, in case of power utility this paper proposes algorithm to estimate a period of return on investment according to the introduction capacity of distributed generators replacing diesel generator. And also, in case of independent power producer, this paper proposes evaluation algorithm to estimate weighting factor of SMP and benefit rate based on break-even point related with cost and benefit. From a case study result on real island micro-grid model, it is confirmed that proposed algorithms are useful and practical for the economic evaluation of island micro-grid.

High Speed Grid Voltage Detection Method for 3 Phase Grid-Connected Inverter during Grid Faults (전원사고 시 3상 계통연계 인버터의 전원 전압 고속 검출 방법)

  • Choi, Hyeong-Jin;Song, Seung-Ho;Jeong, Seung-Gi;Choi, Ju-Yeop;Choy, Ick
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.5
    • /
    • pp.65-72
    • /
    • 2009
  • The new method is proposed to improve high speed detection of grid voltage phase and magnitude during a voltage dip due to a grid faults. Usually, A LPF(Low Pass Filter) is used in the feedback loop of PLL (Phase Locked Loop) system because the measured grid voltage contains harmonic distortions and sensor noises. so, a new design method of the loop gain of the PI -type controller in the PLL system is proposed with the consideration of the dynamics of the LPF. As a result, a better transient response can be obtained with the proposed design method. The LPF frequency and PI controller gain are designed in coordination according to the steady state and dynamic performance requirement. This paper shows the feasibility and the usefulness of the proposed methods through the computer simulation and the lab-scale experiments.

A Study on Radiated and Conducted Noise for Small Electrical Energy Storage System due to Its Operating State (소형 전기에너지저장장치 운전조건에 따른 방사 및 전도 방해에 관한 연구)

  • Jung, Jeong-Il;Ahn, Gun-Hyun;Kim, Young-Sung
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.1
    • /
    • pp.18-22
    • /
    • 2015
  • When using a secondary battery in energy storage units, if the grid is in light duty the active power is stored so it can be used when the grid is in heavy duty. This makes possible for the load equalize and make the grid optimized. Recently the government is trying to propagate this technology. Depending on its capacity this kind of electric energy storage unit is used in adjusting the frequency, break up the energy peak in summer and winter, stabilize the energy output of renewable energy which can change unstably because of the environment. Which makes it possible to stabilize the grid. It is anticipated that market of 120 trillion won will be developed worldwide in 2030. Currently in Korea a steady supply is in progress. However because of stray electromagnetic waves some other electronics are malfunctioning. This paper covers the research in the method to detect the emission noise in small electric energy storage units using lithium secondary batteries and battery management system, Power conditioning systems with CIPSR standards. And the research of a more efficient method to measure such stray electromagnetic waves.

Modeling and Simulation using Simulink and SimPowerSystem of optimized HTS FCL location in a Smart Grid having a Wind Turbine connected with the grid

  • Khan, Umer-Amir;Lee, Sang-Hwa;Seong, Jae-Kyu;Lee, Bang-Wook
    • Progress in Superconductivity and Cryogenics
    • /
    • v.12 no.2
    • /
    • pp.17-20
    • /
    • 2010
  • A considerable amount of research material discussing designs and properties of High Temperature Superconducting Fault Current Limiter (HTS FCL) is available. However, a shortage of research concerning positioning of HTS FCL in power grid is felt. In this paper a feasibility study of HTS FCL positioning in Smart Grid through simulation analysis is carried out. A complete power network (including generation, transmission and distribution) is modeled in Simulink / SimPowerSystems. A generalized HTS FCL is also designed by integrating Simulink and SimPowerSystem blocks. The distribution network of the model has a wind turbine attached to it forming a micro grid. Three phase fault have been simulated along with placing FCL models at key points of the distribution grid. It is observed that distribution grid, having distributed generation sources attached to it, must not have a single FCL located at the substation level. Optimized HTS FCL location regarding the best fault current contribution from wind turbine has been determined through simulation analysis.