• 제목/요약/키워드: electric power transmission network

검색결과 131건 처리시간 0.036초

Power Tracing Method for Transmission Usage Allocation Considering Reactive Power

  • Han Choong-Kyo;Park Jong-Keun;Jung Hae-Sung
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권1호
    • /
    • pp.79-84
    • /
    • 2005
  • In many countries, the electric power industry is undergoing significant changes known as deregulation and restructuring. These alterations introduce competition in generation and retail and require open access to the transmission network. The competition of the electric power industry causes many issues to surface. Among them, unbundling of the transmission service is probably the most complicated as it is a single and integrated sector and the transmission revenue requirement must be allocated to market participants in a fair way. In these situations, it is valuable to research the methodologies to allocate transmission usage. The power tracing method offers useful information such as which generators supply a particular load or how much each generator (load) uses a particular transmission line. With this information, we can allocate required transmission revenue to market participants. Recently, several algorithms were proposed for tracing power flow but there is no dominant power tracing method. This paper proposes a power tracing method based on graph theory and complex-current distribution. For practicability, the proposed method for transmission usage allocation is applied to IEEE 30 buses and compared with the method proposed by Felix F.Wu.

계통과도전압분석기를 이용한 직류송전선로의 과전압에 대한 기초적 해석 (The Basic Study on Overvoltage of HVDC Transmission Line Using TNA)

  • 우정욱;심정운;곽주식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 E
    • /
    • pp.1810-1812
    • /
    • 1997
  • This paper describes the results of ground fault analysis on HVDC Transmission Line using TNA (Transient Network Analyzer). The maximum overvoltage is about 1.7 p.u. in the case of single line to ground fault on the overhead transmission line. When the cable is linked to the end of the overhead transmission line, the maximum overvoltage is about 1.58 p.u..

  • PDF

345kv 미금 변전소 외부 계통의 등가축약 기법을 이용한 EMTP 모델링에 관한 연구 (EMTP simulation of 345kv Substation in large network using newly developed Thevenin equivalent network)

  • 정기석;백영식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.244-246
    • /
    • 2008
  • EMTP-RV is the very powerful program to analyze the dynamic operation of the power system. To use this package in the large complex power system, it is very important to simplify the power system to simple equivalent network. In our study the 100 MVA STATCOM is placed at 345kV "MIGUM" which is the one of the 345kV substations of the Korean Electric Power System that is consist of more than 1000 bus. MIGUM substation is connected with 7 separated transmission lines to main Korean Electric power system. We developed a new method to simplify the network except the substation that we want to analysis. The power system outside the 345kV substation is modeled into the equivalent network. The loop network outside the substation can be modeled to simplified Thevenin equivalent network. The proposed method is applied to IEEE-14 Reliability Test System and the results shows the effectiveness of the method.

  • PDF

An Electric-Field Coupled Power Transfer System with a Double-sided LC Network

  • Xie, Shi-Yun;Su, Yu-Gang;Zhou, Wei;Zhao, Yu-Ming;Dai, Xin
    • Journal of Power Electronics
    • /
    • 제18권1호
    • /
    • pp.289-299
    • /
    • 2018
  • Electric-field coupled power transfer (ECPT) systems employ a high frequency electric field as an energy medium to transfer power wirelessly. Existing ECPT systems have made great progress in terms of increasing the transfer distance. However, the topologies of these systems are complex, and the transfer characteristics are very sensitive to variations in the circuit parameters. This paper proposes an ECPT system with a double-sided LC network, which employs a parallel LC network on the primary side and a series LC network on the secondary side. With the same transfer distance and output power, the proposed system is simpler and less sensitive than existing systems. The expression of the optimal driving voltage for the coupling structure and the characteristics of the LC networks are also analyzed, including the transfer efficiency, parameter sensitivity and total harmonic distortion. Then, a design method for the system parameters is provided according to these characteristics. Simulations and experiments have been carried out to verify the system properties and the design method.

PICNET-NP 통신망의 신뢰성 검증을 위한 시뮬레이션 구현 (A realization of simulator for reliability verification of the communication network PICNET-NP)

  • 이성우
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 D
    • /
    • pp.2212-2215
    • /
    • 2002
  • This dissertation suggests and implements a middle level network which is called PICNET-NP (Plant Implementation and Control Network for Nuclear Power Plant). PICNET-NP is based partly on IEEE 802.4 token-passing bus access method and partly on IEEE 802.3 physical layer. For this purpose a new interface a physical layer service translator, is introduced. A control network using this method is implemented and applied to a distributed real-time system. To verify the performance of proposed protocol experimental were carried out, and the following results are obtained. 1) proper initialization of the protocol. 2) normal receiving and transmission of data. 3) proper switching of transmission media in case of a fault condition on the one of transmission media. The proposed protocol exhibits the excellent performance in the experimental system. From the test results in the experimental system, the proposed protocol, PICNET-NP, can be used for the upgrading of a nuclear power plant and the distributed control system in the next generation of nuclear power plant.

  • PDF

연계 계통에서의 환경적 배출량과 손실을 고려한 최적 경제급전 (Multi-Area Economic Dispatch Considering Environmental Emission and Transmission Losses)

  • 최승조;이상봉;김규호;유석구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.341-343
    • /
    • 2000
  • Traditionally electric power system are operated in such a way that the total fuel cost is minimized regardless of accounting for tie-lines transmission constraint and emissions produced. But tie-lines transmission and emissions constraint are very important issues in the operation and planning of electric power system. This paper presents the Two-Phase Neural Network(TPNN) to solve the Economic Load Dispatch (ELD) problem with tie-lines transmission and emissions constraint considering transmission losses. The transmission losses are obtained from the B-coefficient which approximate the system losses as s quadratic function of the real power generation. By applying the proposed algorithm to the test system, the usefulness of this algorithm is verified.

  • PDF

Proposed Performance Criteria and Evaluation Procedures for Transmission System Planning in Korea

  • Kook, Kyung-Soo;Kim, Taihyun;Oh, Tae-Kyoo;Bang, Min-Jae
    • KIEE International Transactions on Power Engineering
    • /
    • 제2A권4호
    • /
    • pp.160-165
    • /
    • 2002
  • This paper describes a proposed performance criteria and evaluation procedures for transmission system planning in Korea. Performance criteria of the transmission system are expected to be used as a guideline for investment into a transmission network. Moreover, performance evaluation procedures, which are based on current practices and widely accepted theories, are suggested to achieve fair and acceptable results.

Sheath Circulating Current Analysis of a Crossbonded Power Cable Systems

  • Jung, Chae-Kyun;Lee, Jong-Beom;Kang, Ji-Won
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권3호
    • /
    • pp.320-328
    • /
    • 2007
  • The sheath in underground power cables serves as a layer to prevent moisture ingress into the insulation layer and provide a path for earth return current. Nowadays, owing to the maturity of manufacturing technologies, there are normally no problems for the quality of the sheath itself. However, after the cable is laid in the cable tunnel and is operating as part of the transmission network, due to network construction and some unexpected factors, some problems may be caused to the sheath. One of them is the high sheath circulating current. In a power cable system, the uniform configuration of the cables between sections is sometimes difficult to achieve because of the geometrical limitation. This will cause the increase of sheath circulating current, which results in the increase of sheath loss and the decrease of permissible current. This paper will study the various characteristics and effects of sheath circulating current, and then will prove why the sheath current rises on the underground power cable system. A newly designed device known as the Power Cable Current Analyser, as well as ATP simulation and calculation equation are used for this analysis.

계전기 동작에 의한 광역정전 방지방안 (A Method of Preventing Blackout Caused by Relay)

  • 진보건;이승재;김상태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.7-8
    • /
    • 2007
  • This paper presents an vulnerability index for hidden failure of protective relays in transmission system. The bad influence can be quantized by an vulnerability index. When there is mis-operation, no-operation or mis-setting, power flow can be quantized by an index. According to the index, relays can be resetting. So the wide area blackout can be prevented.

  • PDF

한전낙뢰감지네트워크(KLDNet)에 의한 우리나라의 2007년도 낙뢰측정 및 분석 (Lightning observation by KLDNet and analysis on lightning activities of Korea in 2007)

  • 곽주식;강연욱;우정욱;구교선;권동진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.438-439
    • /
    • 2008
  • KEPCO has been operating a lightning detection network, KLDNet, to cope with lightning-induced faults. An weather observation for last 40 years shows that heavy rainy days per year and the strength of rain have almost doubled. It could be interpreted as more frequent occurrence of lightning events. In accordance with that, the lightning activities and the mischievous influences, such as transmission faults, have increased. In this paper, the observed data by the network in 2007 is analyzed and compared with ten-years-old-statistics accumulated by the former system, LPATS.

  • PDF