• Title/Summary/Keyword: earthmoving task

Search Result 2, Processing Time 0.014 seconds

Methodology for Selecting Optimal Earthmoving Haul-Routes using Genetic Algorithm (유전알고리즘을 이용한 토사운반 최적경로 탐색 방법론)

  • Gwak, Han-Seong;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.4-5
    • /
    • 2014
  • Planning earthmoving haul-route must be preceded for appropriate equipment fleet assignment. However, traditional haul-route planning methods have limitations relative to practical usage because multiple variables (e.g., grade/rolling resistance, length, equipment's weight etc.) should be considered at a time. Genetic algorithm(GA) was introduced to improve these traditional methods. However, GA based haul-route planning method still remains in inefficiency relative to computation performance. This study presents a new haul-route searching method that computes an optimal haul-route using GA. The system prototype is developed by using MATLAB(ver. 2008b). The system identifies an optimal haul-route by considering equipment type, soil type, and soil condition.

  • PDF

A Mixed Integer Nonlinear Programming Approach towards Optimal Earthmoving Equipment Selection (혼합 정수 비선형 계획법 기반 토공사 최적 장비 선정 방법 제시)

  • Ko, Yong-Ho;Ngov, Kheang;Lee, Su-Min;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.223-224
    • /
    • 2023
  • Optimal fleet management in the planning stage is one of the most critical activities that guarantee successful construction projects. In South Korea, the construction standard production rate database (CSPRD) is normally employed. However, when it comes to a trade-off problem that involves decision-making on optimal sets of equipment to perform a certain task, the method will require the planners' in-depth knowledge and experience regarding the target process and a time consuming estimation of the performance of every possible scenario must be conducted for the deduction of the optimal fleet management. On this account, this research paper proposes a lightweight method of using mixed integer nonlinear programming (MINLP) in multi-objective problems based on CSPRD-based mathematical equations to assist planners in the preplanning stage of choosing the optimal sets of types and size machinery to efficiently arrange the construction scheduling and budgeting.

  • PDF