• Title/Summary/Keyword: earliness-tardiness

Search Result 34, Processing Time 0.017 seconds

A Finite Capacity Material Requirement Planning System for a Multi-Stage Assembly Factory: Goal Programming Approach

  • Wuttipornpun, Teeradej;Yenradee, Pisal;Beullens, Patrick;van Oudheusden, Dirk L.
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.1
    • /
    • pp.23-35
    • /
    • 2005
  • This paper aims to develop a practical finite capacity MRP (FCMRP) system based on the needs of an automotive parts manufacturing company in Thailand. The approach includes a linear goal programming model to determine the optimal start time of each operation to minimize the sum of penalty points incurred by exceeding the goals of total earliness, total tardiness, and average flow-time considering the finite capacity of all work centers and precedence of operations. Important factors of the proposed FCMRP system are penalty weights and dispatching rules. Effects of these factors on the performance measures are statistically analyzed based on a real situation of an auto-part factory. Statistical results show that the dispatching rules and penalty weights have significant effects on the performance measures. The proposed FCMRP system offers a good tradeoff between conflicting performance measures and results in the best weighted average performance measures when compared to conventional forward and forward-backward finite capacity scheduling systems.

Optimal Supply Chain Formation Using Buyer Agent Negotiation in SET Model based Make-To-Order (최적 공급사슬망 구성을 위한 구매자 에이전트 협상방법론 개발)

  • Kim, Hyeon-Su;Jo, Jae-Hyeong;Choe, Hyeong-Rim;Hong, Sun-Gu;Son, Jeong-Ha
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2005.11a
    • /
    • pp.461-470
    • /
    • 2005
  • A dynamic supply chain that is composed of many different companies with different rent roles and interests allows free joining and secession. Buyers place orders simultaneously and manufacturers should compete each other for the orders. The purpose of our paper is how to find the optimal formation of supply chain ill a global viewpoint while allowing each member company to pursue his local goal The dynamic nature of supply chain formation causes the variation of cost depending on how many orders a manufacturer would accept. We propose a multi-agent based negotiation protocol that efficiently leads to the formation of optimal supply chain without giving up maximization of the individual profit in multi-agent environment of the make-to-order industry. The goal of the negotiation is to form a supply chain to minimize the overall sum of manufacturers' manufacturing cost, and earliness cost and tardiness cost based on SET model. We compare the negotiation protocol with Branch & Bound method. Finally, the validity and performance of buyer's negotiation has been tested experimentally.

  • PDF

A Heuristic for parallel Machine Scheduling Depending on Job Characteristics (작업의 특성에 종속되는 병렬기계의 일정계획을 위한 발견적 기법)

  • 이동현;이경근;김재균;박창권;장길상
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.1
    • /
    • pp.41-41
    • /
    • 1992
  • In the real world situations that some jobs need be processed only on certain limited machines frequently occur due to the capacity restrictions of machines such as tools fixtures or material handling equipment. In this paper we consider n-job non-preemptive and m parallel machines scheduling problem having two machines group. The objective function is to minimize the sum of earliness and tardiness with different release times and due dates. The problem is formulated as a mixed integer programming problem. The problem is proved to be Np-complete. Thus a heuristic is developed to solve this problem. To illustrate its suitability and efficiency a proposed heuristic is compared with a genetic algorithm and tabu search for a large number of randomly generated test problems in ship engine assembly shop. Through the experimental results it is showed that the proposed algorithm yields good solutions efficiently.

Optimal Supply Chain formation using Agent Negotiation in SET Model based Make-To-Order (최적 공급사슬 구성을 위한 에이전트 협상방법론 개발)

  • Kim Hyun-Soo;Cho Jae-Hyung;Choi Hyung-Rim;Hong Soon-Goo
    • Journal of Intelligence and Information Systems
    • /
    • v.12 no.2
    • /
    • pp.99-123
    • /
    • 2006
  • In an effect to composite an optimal supply chain, this study has introduced an agent-based negotiation as a method to assign a lot of orders to a large number of participants. As a resources allocation mechanism to form a strategic cooperation based on information sharing between supply chain members(buyers, manufacturers, suppliers), this agent negotiation provides coordination functions allowing all participants to make a profit and accomplishing Pareto optimum solution from the viewpoint of a whole supply chain. A SET model-based scheduling takes into consideration both earliness production cost and tardiness production cost, along with a competitive relationship between multiple participants. This study has tried to prove that the result of an agent-based negotiation is a Pareto optimal solution under the dynamic supply chain environment, establishing the mathematical formulation for a performance test, and making a comparison with the heuristic Branch & Bound method.

  • PDF