• Title/Summary/Keyword: dummy linear accelerator

Search Result 2, Processing Time 0.017 seconds

The Application of the Running of a Dummy Linac and Accessories (실습을 위한 모형 선형가속기 및 부속기구 제작 활용)

  • Na, Soo-Kyung
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.20 no.2
    • /
    • pp.123-130
    • /
    • 2008
  • Purpose: To provide practical education, most universities should be equipped with medical appliances in need. As compensatory measures, Gimcheon College has produced in-house dummy linac and dummy accessories, we are going to report efficiency and its usage. Materials and Methods: Dummy linear accelerator (DLINAC-001) has the same mechanical functions as rotation of gantry and collimation in linear accelerator. In addition, to maximize practical education, we have produced and utilized in-house custom blocks, wedge filters, electron cones and head rests. Results: The in-house produced linear accelerator with the same mechanical functions as the linear accelerator, DLINAC-001 can be effectively used in practicing diverse medical instruments. Conclusion: We have produced dummy linear accelerators and dummy accessories and utilized them in practice classes, which can provide the students with clinical training in diverse fields. Consequently, the students exposed to the maximized educational effectiveness can be easily equipped with the practical competence required in real clinical fields.

  • PDF

The HPRF system for PEFP 20MeV proton linac

  • Seol, K.T.;Kwon, H.J.;Song, Y.G.;Park, M.Y.;Cho, Y.S.
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2004.10a
    • /
    • pp.683-684
    • /
    • 2004
  • The RF system for PEFP 20MeV proton linear accelerator is described. The RF system for 3MeV RFQ was already installed and operated to drive the RFQ. The klystron was tested up to 600kW itself and operated up to 350kW routinely. The HPRF dummy load was stabilized with the change of the coolant. Preparation of 20MeV DTL HPRF test has been completed. LCP and PLC system for klystron power supply was already prepared. Voltage fluctuation was measured during klystron test. Voltage control feedback loop seems to be re-adjusted.

  • PDF