• Title/Summary/Keyword: dredging operation

Search Result 42, Processing Time 0.015 seconds

Analysis of Long-Term Variation in Marine Traffic Volume and Characteristics of Ship Traffic Routes in Yeosu Gwangyang Port (여수광양항 해상교통량의 장기변동 및 통항 특성)

  • Kim, Dae-Jin;Shin, Hyeong-Ho;Jang, Duck-Jong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.26 no.1
    • /
    • pp.31-38
    • /
    • 2020
  • The characteristics of ship traffic routes and the long term fluctuation in marine traf ic volume of the incoming and outgoing routes of the Yeosu Gwangyang Port were analyzed using vessel traffic data from the past 22 years and a real-time vessel traffic volume survey performed for 72 hours per year, for three years, between 2015 and 2017. As of 2017, the number of vessels passing through Yeosu Gwangyang Port was about 66,000 and the total tonnage of these ships was about 804,564 thousand tons, which is a 400 % increase from the 189,906 thousand tons shipped in 1996. Specifically, the dangerous cargo volume was 140,000 thousand tons, which is a 250 % increase compared to 1996. According to the real-time vessel traffic volume survey, the average daily number of vessels was 357, and traf ic route utilization rates were 28.1 % in the Nakpo sea area, 43.8 % in the specified sea area, and the coastal area traf ic route, Dolsan coastal area, and Kumhodo sea area showed the same rate of 6.8 %. Many routes meet in the Nakpo sea area and, parallel and cross passing were frequent. Many small work vessels entered the specific sea area from the neighboring coastal area traffic route and frequently intersected the path of larger vessels. The anchorage waiting rate for cargo ships was about 24 %, and the nightly passing rate for dangerous cargo ships such as chemical vessels and tankers was about 20 %. Although the vessel traffic volume of Yeosu Gwangyang Port increases every year, the vessel traffic routes remain the same. Therefore, the risk of accidents is constantly increasing. The route conditions must be improved by dredging and expanding the available routes to reduce the high risk of ship accidents due to overlapping routes, by removing reefs, and by reinforcing navigational aids. In addition, the entry and exit time for dangerous cargo ships at high-risk ports must be strictly regulated. Advancements in the VTS system can help to actively manage the traffic of small vessels using the coastal area traffic route.

Analysis of Flood Control Effect by Applying the Connecting Channel in Estuary Area Including the Confluence of Two Rivers (2개의 하천이 합류하는 하구역에서의 연결수로 통수능에 따른 홍수위저감효과 분석)

  • Kim, Sooyoung;Kim, Hyung-Jun;Yoon, Kwang Seok
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.12
    • /
    • pp.1065-1075
    • /
    • 2015
  • In the estuary where the structure such as river-mouth weir has been installed, the flow is developed very complicatedly due to river water from upstream, tide of the sea and floodgate operation. Especially, if basin outlets more than one exists in one estuary, the boundary conditions will be significantly more complex form. Saemangeum(SMG) project area in Korea is the most typical example. There are Mankyung river and Dongjin river in upstream. The water of them inflows into SMG project area. In the downstream, river flow was drained from inland to sea over the SMG sea dike through the sluice. The connecting channel was located between Mankyung and Dongjin basins. It functions not only as transportation by ship in ordinary period but also as flood sharing by sending flood flow to each other in flood period. Therefore, in order to secure the safety against flood, it is very important to understand the flood sharing capacity for connecting channel. In this study, the flood control effect was analyzed using numerical simulation. Delft3D was used to numerical simulation and simulated period was set up with neap tide, in which the maximum flood stage occurred due to poor drainage. Actually, three connecting channels were designed in land use plan of the SMG Master Plan, but they were simplified to a single channel for conciseness of analysis in this study. According to the results of numerical analysis, the water level difference between two basins was increased and the maximum flood stage at dike sluice was also upraised depending on decrease of conveyance. And the velocity induced by same water level difference was decreased when the conveyance became smaller. In certain conveyance above, there was almost no flood control effect. Therefore, if the results of this study are considered for design of connecting channel, it will be expected to draw the optimal conveyance for minimizing dredging construction cost while maximizing the flood control effect.