• Title/Summary/Keyword: drawing management

Search Result 699, Processing Time 0.025 seconds

A Study on the Possibility of 2D Design Drawing Implementation by Revit Architecture (Revit Architecture를 이용한 2D 설계도면 구현 가능성에 관한 연구)

  • Cho, Yong-Sang;Lee, Heewon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5243-5250
    • /
    • 2013
  • BIM(Building Information Modeling) enables 3D model-base management for all information produced by construction project during its life cycle. Also as a national policy, BIM has been institutionalized as design criteria. But, on the matter of 2D drawing using BIM software (Revit Architecture), it has been recognized as difficult to realize the same quality drawing drawn by CAD. The purpose of this study is verifying the possibility of printable design drawing implemented by BIM software at the same quality of 2D shop drawing drawn by 2D CAD. Through the analysis of basic design elements of 3D BIM software and 2D CAD software, with the case of partial cross sectional drawing which is most faithful representation of the basic design elements, this study find out that the 3D BIM software can produce the same quality 2D printable drawing utilizing its implicit function.

The Digital Drawing Production Using Digital Camera (디지털 카메라를 이용한 수치도면작성)

  • Choi, Seung-Pil;Park, Jong-Sun;Choi, Chul-Soon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.3 s.30
    • /
    • pp.91-97
    • /
    • 2004
  • As for the former analogue method of photogrammetry, We have obtained final digital drawing by creating the stereo model from overlapped images through orientation process using plotting instrument and processing restitution procedure. However, digital photogrammetry batch processes such using small computer system thus We make an attempt automatization of the procedures. And without the production of stereo model, We could obtain 3D digital data through analysis method. Therefore, an objective of this study was to implement a surveying system that could 3D surveying positions using the digital image to reduce limitations of control point surveying and photographing conditions more efficiently to produce digital drawing. By the result, photogrammetry can practice and make out digital drawing to a computer by digital camera of a comparative low-cost. Small scale area can become practical use to drawing production etc. for facilities management because area can make out digital drawing economically than general surveying.

  • PDF

A basic research for knowledge-based management of feature recognition rules (형상인식 규칙의 지식 베이스 운용에 관한 연구)

  • 박재홍;반갑수;이석희
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1991.10a
    • /
    • pp.715-719
    • /
    • 1991
  • In manufacturing process, usually 2-dimensional part drawing is used as a basic data. If a designer wants to recognize 2-dimensional drawing and formulate 3-dimensional shape, a proper feature recognition rule is required as a prerequisite step. These rules are converted Into knowledge base, should be ed separately in the recognition program and can be referenced In similar way of database application. In this paper, basic feature recognition rules are addressed in structure type knowledge base, and the application system is formulated which can be operated separately with existing data driven program.

  • PDF

Analysis the Design Attribution to Assess the Design Quality Based on Detailed Design (실시설계도면 기반 설계속성 도출 및 설계품질평가)

  • Yang, Ji Su;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.3-12
    • /
    • 2016
  • Recently, construction industry shows active expansion in overseas construction market. But the active work limited in construction work, on the other hand, design-drawing work is evaluated shortage of competitive power. So this study aim to improve the competitive of 'domestic design-drawing work'thorough objective evaluation. Objective evaluation is consist of 'design attribution'. Design attribution is based on the execution drawing and complement by existing reasearch, expert interview. And then, list up the 'design attribution' evaluation list to carry out a survey targeting hands-on worker. Survey is consist of 'Likert 5-point scale, FMEA method'. As a result, construction company and design company show different opinions in both relative position evaluation and importance evaluation.

The Develope Methodology for the Design Value Engineering Checklist by Categorizing the Drawing Information (도면정보의 범주화를 통한 설계VE 점검 체크리스트 개발 방법)

  • Song, Ji-Won;Ha, Young-Seo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.863-867
    • /
    • 2008
  • Value Engineering is one of the most effective too13 to achieve the required cost and time reduction, quality and safety improvement. The role and importance of design value engineering is expected to be high, so the research is needed for its effective accomplishment. Therefore, in this research we have suggested the method of checklist development for the effective accomplishment of design value engineering work. Also, the way of development is that derives major elements from drawing information category and from the base of the derived elements, the research lists up the checklist items. At last, it developed design value engineering checklist based the item that listed up throughout the experts.

  • PDF

A Drawing Method of Checklist for Design VE Using Facet Concept (Facet 개념을 이용한 설계 VE 점검 체크리스트 도출 방법)

  • Ahn, Sang-Hyun;Lee, Jae-Myung;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.405-408
    • /
    • 2008
  • It is increased concerns that review the design based on the economic efficiency, VE(Value Engineering), in construction industry. Also, the effectiveness of VE case study has reported very variously in the domestic and foreign construction industry. The phase of drawing idea VE process is important because of real cost saving effect. The design review checklist in the phase of drawing idea make more effective VE. The research suggests the method and process of design review checklist focusing on the construction work in this study. Also, it proposes the useful process with the exited VE procedure.

  • PDF

Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition (2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발)

  • Sunwoo, Hyo-Bin;Choi, Go-Hoon;Heo, Seok-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

A Component-based System Implementation for Calculating BOM by CAD Drawing (CAD도면에 따른 소요부품 산출 컴포넌트 시스템 구현)

  • Kwon, Young-Jik
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.11 no.4
    • /
    • pp.93-104
    • /
    • 2006
  • This paper tries to implement BOM calculation effectively by sharing the data in CAD management system and BOM systems. For this purpose, a component-based software system in this thesis was implemented by using CAD drawing systems. It can be found from this research that errors happened were reduced sharply. Especially, the BOM calculation period was cut from 2 weeks to 2days, and at the same time, the correct rate achieved 95%. Moreover, there are some following effects of our implemented system: First of all, because component development method was adopted in this paper, it makes program easy to reuse, to keep/maintenance as well as modify. Second, long-distant management is possible by using web-based development method. Third, data management is made effective by constructing image and tort database. Fourth drawing management is systemized, Finally, the system is suitable for companies.

  • PDF

A Study on the Formability Estimation of Deep Drawing Process by using Taguchi Method (다구찌방법을 이용한 디프드로잉 공정의 가공성평가에 대한 연구)

  • 이병찬;강연식;양동열;문재호
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1996.11a
    • /
    • pp.938-942
    • /
    • 1996
  • Despite the increasing demand for improved product design, a limited number of works have been reported in the field of sheet metal forming. In the present study, introducing the Taguchi method, an optimal and robust combination of parameters is found and a data base management system and nomograms are utilized for knowledge acquisition. The developed system is applied to a deep drawing process, Through the present study, it is shown that the developed system is useful for the design and the formability estimation of sheet metal forming processes.

  • PDF