The present study investigates noise and condensation characteristics of polyvinyl chloride (PVC), which is widely used for drainage piping materials, complex double structure by comparing to those of PVC single structure piping materials. In addition, effects of insulation on drainage noise has been measured experimentally. As the results of the experiments, noise reduction effect of PVC complex double structure is superior to that of PVC single structure in terms of elbow and vertical piping materials which are employed for drainage pipes of toilet bowls and bathtub. The insulation barely have effect on the noise reduction in case of the PVC single structure since there is almost no changes in noise occurrence even though the insulation is applied on both elbow and vertical piping materials. Temperature differences between inside and outside of the pipes have been measures for the PVC single and complex double structures as well. In consequence, outside temperature of the PVC complex double structure is higher than that of the PVC single structure. The condensation occurrence time of the PVC complex double structure shows a distinct difference from that of the PVC single structure, thus, the PVC complex double structure has outstanding effect on preventing the condensation.
Journal of the Korea institute for structural maintenance and inspection
/
v.5
no.2
/
pp.183-190
/
2001
A sub-structure is uplift if the floating greater than dead load of a structure. When such occasion arise, a structure sustain damage. In general, the measures for floating prevention of structure are a permanent anchor method and a drainage method. The primary construction cost of a permanent anchor method is heavy. And a drainage method is needed maintenance management long term. At this point, the measures for floating prevention of a notion being requires the other days. Therefore, at this study a simple construction and a economic vertical drainage system was developed. The findings be used in the in-situ and gave careful consideration to an application. The result of examination, this system considering a characteristic of coefficient of permeability for the ground controls occurrence of floating despite the water level rise of the ground, which a period of construction get shorter compared with other methods, which understood that measures satisfactory in the financial aspect. Especially, A structure occurring effects of flatting under the course of construction made use of it. As the result of the effect of it was confirmed by construction.
Concrete repair and reinforcement is a complex process, presenting unique challenges very different from those experience in the field of construction. The purpose of this study is to analyze the pattern and mechanism of deteriorations in irrigation and drainage structure. Damage and deteriorated structures are classified with several types. This provides a survey of crack repair methods, including a summary of the procedures that are being used. It is systematically evaluated with the disintegration on irrigation & drainage structure; drainage sluice gate, pumping station, drainage pumping station. Following the evaluation of the irrigation & drainage structure, a suitable repair and reinforcing procedure can be selected based on this report
For underpasses in Yeongjong Sky City business district, the guided drainage system, as a buoyancy prevention system has been designed, and is under construction. This paper investigates the safety of the guided drainage system for underpass structures being constructed in Yeongjong Sky City business district. This paper also calculates the amount of outflowing groundwater generated by the guided drainage system, and proposes alternative usages of the water. In order to investigate safety and field applicability of the guided drainage system for underpasses, characteristics of the surface flow for the area of interest have been analyzed, and the flow change of groundwater following the underpass structure construction has been evaluated using the 3-dimensional groundwater program MODFLOW. The influence of ground water on safety of the underpass structures has been calculated by FLAC2D analysis. For alternative usages for the outflowing groundwater generated by the guided drainage system, utilization methods of the outflowing groundwater in national and international resources have been researched. The amount of an outflowing groundwater to be generated in the area of interest has been analyzed, and efficient potential usages of this groundwater have been researched. When guided drainage technique is applied, the change in flow of groundwater must be evaluated and considered as safety factor relating to the buoyancy of the structure. As a result, safety factor demonstrated more than 1.2, meaning that the underpass structure is safe. The amount of subsoil drain generated by the guided drainage system was also analyzed. The quality and amount of water satisfied the standards and volume requirements, so as to make it applicable for a number of uses, such as X, Y, and Z, and should prove to be a valuable resource as the circumstances of the neighboring area change over time. These resources can be used as basic data for future urban water circulation studies, as well as generating research of alternative water usages.
Journal of The Korean Society of Grassland and Forage Science
/
v.16
no.3
/
pp.219-224
/
1996
Silage comkv, suwwn 19). sorghum $\times$ sudangrass(p. 988) and winter ryeNaton) were cultivated on imperfectly drained paddy field under two different draining methods, subsurface darinage by PVC pipes and open ditsched surface drainage. The crops were harvested at the stage of hard dough for corn and soft dough for wrghum and rye. The soil physical properties. soil colors. soil structure and soil wetness were improved in the subsurface drainage. Gravitational water table occured depth in 110 cm(dry season)~75cm(rain season). In soil profile description, yellowish brown with yellowish red mottles and well developed granular structure were found in the surface A horizon. The portion of solid phase in subsoils(B horizon) was reduced from 48.6%(undrained) to 43.7 %. A blocky structure with dark gray to gray were described in the open ditsched surface drainage. Severe wet depression of the crops was observed due to it's higher moisture contents, where the gravitational water occured depth in 25~37cm during the rainy season. The chemical properties of paddy soils were less affected by drainage methods. The concentration of available phosphate. organic matter and exchangeable K, Ca and Mg were decreased in the subsurface drained soils. The annual dry matter yields of com-rye cropping were 17.8 ton in the undrained, 21.6 ton in the open ditsch drainage and 35.9 ton/ha in the subsurface drainage.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2009.04a
/
pp.194-202
/
2009
The paper deals with the countermeasure against structure-borne noise source and noise reduction of drainage pipes. Recently, the problem the problem of the toilet drain noise of an apartment house has been become the center of public interest and a target of public grievance. Generally, the drain noise of a toilet in the apartment house has a pink noise characteristics below 2 kHz level, and therefore, the structure-borne noise has a great effect on the entire drain noise. In order to measure the transmission loss for various kinds of pipes such as PVC pipes, cast-iron pipes and newly developed AS pipes, experimental setup containing speakers as a sound source was designed and manufactured. The second-stories measurement room with a small size anechoic chamber was constructed and the noise level for different kinds of drainage pipes was measured by the sound level meter. Through the experimental research in the study, noise reduction capacity for various kinds of drainage pipes and countermeasures against structure-borne noise source are demonstrated.
Journal of Korean Tunnelling and Underground Space Association
/
v.17
no.6
/
pp.675-683
/
2015
The room-and-pillar construction method for underground space is adopted from the room-and-pillar mining method which is one of the most popular underground mining method in the world. Drainage system in the room-and-pillar underground construction method can be similar with the concept of single shell in tunnel because additional reinforcement except the TSL (thin spray-on liner) is not applied in the room-and-pillar construction method. That is, to decrease groundwater level and maintain safety in tunnel, the drainage pin hole inside lining (shotcrete) can be used. However, if total amount of outflow in the underground structure is relatively small or groundwater is not detected, such drainage system will not be useful and cause additional construction cost. In this study, outflow of conventional tunnels in South Korea was investigated and the criteria to determine whether the drainage pin hole is effective was suggested. And the guided drainage system was suggested when drainage pin hole was not applied in the room-and-pillar construction method.
Magazine of the Korean Society of Agricultural Engineers
/
v.18
no.4
/
pp.4218-4225
/
1976
To insure the safety of the drainage sluice, topogrophical change due to erosion as well as capability of discharging the design flow in a very important factor. In consideration of the fact that the drainage sluice is built in the sea, its construction has many topographically restricted problems and naturally requires a completeness of research and experiment. This thesis is a comparative and analytic study of discharging flow acting on the erosion at the bottom of the structure on the basis of the measured velocity on the downstream channel of the drainage sluice. (1) The measured velocity shows a little higher values than the computed velocity, because the measured velocity was observed at the surface of the stream. There fore, it is reasonable that the compated velocity should be taken in this study. (2) The field observation was conducted to have the measurement of the flow velocity without surveying the area of flow. Therefore, the coefficient of discharge could not be computed. The survey of the area of flow is planned to be conducted along with the measurement of the flow velocity. (3) The apron of the drainage sluice is free discharging type and it was designed to be about 80m in length less than it should be. (4) The apron of free flow discharging type should have a solid foundation to protect the structure by preventing erosion damage to upstream and downstream channels against weathering of rock and strong torrent. Whether free flow discharging type or energy-dissipating type is best chosen depends on the topographical condition of the forage site, therefore, there would be a comparative study before the final decision was made about the protrection for the structure. (5) It is considered to be appropriate that the design and construction of the drainage sluice should have a complete study which is based on hydraulie model test before the type of protection is decided. (6) It is much requested that a variety of experiment equipments be installed and observed to study the protection for the drainage sluice.
Magazine of the Korean Society of Agricultural Engineers
/
v.43
no.5
/
pp.63-69
/
2001
The main purpose of this study is to seek desalinization effect of subsurface drainage system with rice hull packing in Dae-Ho Reclaimed Land. After 4 years installed sub-surface drainage system, distribution of drained water electric conductivity (ECw) was 4.43~12.78 ds/m. The soil profile showed partial development of the soil structure and compaction of subsoils with increased bulk density. The bulk density of the subsoil was 1.42~1.66 g/cm$^3$, which might limit root growth. The soil color changed near the drainage pipe line. Distribution of soil extract solution ECe and SAR as subsurface drainage pipe position and drainage canal distance showed desalinization effect of subsurface drainage system with rice hull packing as widening effective zone of subsurface drainage pipe.
Kim, Kwan-Ho;Park, Kwang-Su;Kim, Myeong-Won;Lee, Joon-Gu;Yoo, Jung Hoon
Proceedings of the Korea Concrete Institute Conference
/
2006.11a
/
pp.189-192
/
2006
Following the evaluation of the irrigation & drainage structure, a suitable repair and reinforcing procedure can be selected based on this report. Successful procedures take into account the causes of the crack. This provides a survey of crack repair methods, including a summary of the characteristics of the cracks that may be repaired with each procedure, the type of irrigation & drainage structure that have been repaired and a summary of the procedures that are used. Readers are also directly contacted to the website(http:/rri.karico.co.kr/rricon). This report is intended to support the purposes, philosophy, and needs, using easily understood graphics and photos from the construction fields. The results of this study will be distributed to the public official in technical post, the operator in construction site and the member of Korea Agricultural & Rural Infrastructure Corporation and etc.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.