• Title/Summary/Keyword: downstream of Dam

Search Result 437, Processing Time 0.023 seconds

Numerical Simulation of Sand Bars downstream of Andong Dam (안동댐 하류 하천에서 사주의 재현 모의)

  • Jang, Chang-Lae;Shimizu, Yasuyuki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4B
    • /
    • pp.379-388
    • /
    • 2010
  • This study examined the physical effects on the river changes downstream of Andong dam and simulated the reproduction of sand bars and the geomorphic changes numerically. The river bed downstream of Aandong dam and Imha dam was decreased and the mean diameter of bed materials was increased, and the number of lower channels was increased. The vegetated area was slightly increased after Andong dam construction. Moreover, the area was abruptly increased after Imha dam construction. The bankfull discharges was estimated to 580 $m^3/s$ after the dams construction and 2,857 $m^3/s$ before the dams. A flood mitigation safety by the dams construction considering return period was increased to 5 to 10 times. As a result of meso-scale regime analysis by using banfull discharge, the regime between single bars and multiple row bars before the dams construction was changed to completely the regime of multiple row bars after the dams. The numerical simulation results showed that the sand bars and lower channels were developed before the dams, and braided river was developed after the dams. This meant that the patterns of sand bars was changed by variable discharge due to the dams construction.

Modeling Downstream Flood Damage Prediction Followed by Dam-Break of Small Agricultural Reservoir (농업용 소규모 저수지의 붕괴에 따른 하류부 피해예측 모델링)

  • Park, Jong-Yoon;Joh, Hyung-Kyung;Jung, In-Kyun;Jung, Kwan-Soo;Lee, Joo-Heon;Kang, Bu-Sik;Yoon, Chang-Jin;Kim, Seong-Joon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.6
    • /
    • pp.63-73
    • /
    • 2010
  • This study is to develop a downstream flood damage prediction model for efficient confrontation in case of extreme and flash flood by future probable small agricultural dam break situation. For a Changri reservoir (0.419 million $m^3$) located in Yongin city of Gyeonggi province, a dam break scenario was prepared. With the probable maximum flood (PMF) condition calculated from the probable maximum precipitation (PMP), the flood condition by dam break was generated by using the HEC-HMS (Hydrologic Engineering Center - Hydrologic Modeling System) model. The flood propagation to the 1.12 km section of Hwagok downstream was simulated using HEC-RAS (Hydrologic Engineering Center - River Analysis System) model. The flood damaged areas were generated by overtopping from the levees and the boundaries were extracted for flood damage prediction, and the degree of flood damage was evaluated using IDEM (Inundation Damage Estimation Method) by modifying MD-FDA (Multi-Dimensional Flood Damage Analysis) and regression analysis simple method. The result of flood analysis by dam-break was predicted to occurred flood depth of 0.4m in interior floodplain by overtopping under PMF scenario, and maximum flood depth was predicted up to 1.1 m. Moreover, for the downstream of the Changri reservoir, the total amount of the maximum flood damage by dam-break was calculated nearly 1.2 billion won by IDEM.

The Effect of Current and Temperature of a Reservoir by the Simulation of Dam Outflow (댐 방류조건에 따른 저수지 유속과 수온 영향)

  • Yu, Soon-ju;Ha, Sung-ryong;Jung, Dong-il
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.1060-1067
    • /
    • 2006
  • Water quality in the Daecheong reservoir has been deteriorated by algal bloom due to nutrient supply from the upstream of the Daecheong reservoir after heavy rainfall. Algal bloom is propagated from eutrophicated tributary into the main body of the reservoir according to the hydrological conditions. This study is aimed to estimate the water current and temperature effect by the simulation of dam spill flow control using water quality model, CE-QUAL-W2 in 2003. Water current was resulted in nutrient transport from upstream of main reservoir and nutrients were delivered up to downstream by fast water velocity. Algal blooms occurred in stagnate zone of reservoir downstream as the current of downstream was retarded according to dam outflow control. Consequently water balance in stagnate zone triggered a rise of water temperature in summer. It affected algal bloom in the embayment of the reservoir. The simulation result by outflow control scenarios showed that spill flow augmentation induced in water body instability of stagnate zone so that water temperature declined. It could be suggested that outflow control minimize algal bloom in the downstream in the flooding season as long as water elevation level is maintained properly.

Characteristics of Fish Community Structure before the Dam Operation in the Naeseong Stream, Korea (내성천에서 영주댐 운영전 어류 군집구조의 특성)

  • Won, Jong-Seo;Kim, Seog Hyun;Cho, Kang-Hyun
    • Ecology and Resilient Infrastructure
    • /
    • v.4 no.1
    • /
    • pp.34-43
    • /
    • 2017
  • The Naeseong Stream as a tributary of Nakdong River has conserved the unique structure and function of a typical sand-bed stream ecosystem. However, it is expected to change the stream bed environments and then the fish fauna in the downstream of the dam after the operation of the Yeongju Dam from 2016. We collected fishes and investigated their habitat environments from 2014 to 2016 in the downstream of the Yeongju Dam under construction in order to monitor changes in habitat environment, fauna and community structure of fishes in the Naeseong Stream. The size of the bed materials increased immediately downstream of the Yeongju Dam under construction. Before the operation of the Yeongju Dam, Zacco platypus was dominated and Opsarichthys uncirostris amurensis, Coreoleuciscus splendidus, Hemibarbus longirostris and Pseudogobio esocinus were sub-dominated according to the different sampling sites. Hemibarbus labeo, H. longirostris, Pseudogobio esocinus, Gobiobotia nakdongensis, Cobitis hankugensis and Leiocassis ussuriensis were found as a psammophilous fish specific to sand stream in the Naeseong Stream. At the downstream of the dam, the fish community was classified into a group of gravel-bed fishes such as Microphysogobio yaluensis, Coreoleuciscus splendidus and Coreoperca herzi and a group of sand-bed fishes such as Hemibarbus labeo, Cobitis hankugensis and Gobiobotia nakdongensis. These fish communities gradually tended to change from sand-bed fish community to gravel-bed fish community during the construction of the Yeongju Dam. Therefore, it is necessary to collect the baseline data for the stream ecosystem conservation in the sandy stream by continuously monitoring changes in the environment and fish in the downstream of the Youngju Dam.

Evaluation of the Applicability of a Distributed Model at the Downstream of Dam (댐 하류 지점에 대한 분포형 모형의 적용성 평가)

  • Choi, Yun-Seok;Kim, Kyung-Tak;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.9
    • /
    • pp.703-713
    • /
    • 2009
  • Dam has very important roles in both water use and flood control. Dam release and runoff from rainfall affect directly to the flood control at the downstream of dam during heavy storm especially. This study evaluates the applicability of a distributed model by applying the GRM (Grid based Rainfall-runoff Model) based on HyGIS (Hydro Geographic Information System) environment to runoff modeling at the downstream of dam where the discharge from dam and rainfall affect simultaneously. In order to do this, Yeoju watershed in Han River basin is selected. Rainfall data and discharge from Chungju regulation dam and Hoengseong dam are applied to runoff simulation. The modeling results are verified with Yeoju water level station, and they show good agreement with observed hydrographs. And this study shows that GRM is able to simulate appropriately the effect of dam discharge and rainfall on watershed runoff.

A Flood Routing for the Downstream of the Kum River Basin due to the Teachong Dam Discharge (대청댐 방류에 따른 금강 하류부의 홍수추적)

  • Park, Bong-Jin;Gang, Gwon-Su;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.2
    • /
    • pp.131-141
    • /
    • 1997
  • In this study, the Storage Function Method and Loopnet Model (Unsteady flow analysis model) were used to construct the flood prediction system which can predict the effects of the water release in the downstream region of Teachong Dam. The regional frequency analysis (L-moment) was applied to compute frequency-based precipitation, and the flood prediction system was also used for flood routing of the down stream region of Teachong Dam in the Kum River Basin to calculate frequency based flood. The magnitude of flood, water level, discharge, and travel time to the major points of the downstream region of Teachong Dam, which can be used as an imdex of flood control management of Teachong Dam, were calculated.

  • PDF

Basic Investigation about Hydro-Geomorphologic and Vegetation Cover Changes on the Regulated River - A Case of the Downstream River of Andong Dam/Imha Dam on the Nakdong River (조절된 하천의 수문지형학적 변화와 식생 피복의 변화에 관한 기초 조사 - 낙동강 안동댐/임하댐 하류 하천 사례)

  • Woo, Hyo Seop;Rhee, Dong Sup;Ahn, Hong Kyu;Lee, Chang Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.1335-1339
    • /
    • 2004
  • A hydro-geomorphologic change in a sand bed channel reach and vegetation expansion by changes in the How regime is analyzed in this study. Field and aerial photo surveys, basic hydrological analysis about flow regime change due to two dams, Andong Dam and Imha Dam, on the upstream river and computer modeling are conducted. Two Dams in the study reach have obviously affected downstream channel in many ways including the bed particle coarsening, vegetation expansion on the sandbars and following river channel braiding. The phenomenon of no vegetation on the large point bar in front of Hahwe Village seems due to disturbance of the sandbar surface probably due to the cross flow in the meander reach during the flood. Another reason for no vegetation is that the sandbar on this reach has lower subsurface water lovels, as compared with the others in the up- and downstream of the reach where vegetation expanded, which would hinder vegetation from germinating and growing on the sandbar.

  • PDF

The optimal operation of reservoir systems during flood season (홍수기 저수지의 최적연계운영)

  • Han, Kun-Yeun;Choi, Hyun-Gu;Kim, Dong-Il;Lee, Kyeong-Teak
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.743-746
    • /
    • 2008
  • Recently, due to the effect of global warming and extreme rainfall, the magnitude of flood disaster and the frequency of flood is rapidly increasing. In order to mitigate the damage of human and property from this kind of meteorological phenomenon and manage water resources scientifically, effective operation of dam and reservoir is very important. In case of Andong dam which was not performed a flood control function needs to develop new types of dam safety management measure because of recent extraordinary flood by typhoons. In case of Andong dam and Imha dam, I am using HEC-5 model in order to apply reservoir simulation. In this case, complex conditions among 100-year floods , 200-year floods and PMF was used. Also, I modified the maximum outflow 3,800m3/s into 3,490m3/s and applied this modified discharge in order to secure freeboard in the downstream. In an analysis that I applied modified outflow by 100-year floods and 200-year floods to, the result showed that river didn't overflow in Andong area but some other places have relatively low freeboard. In the cases that I modified maximum outflow, results showed that freeboard of levee is larger than existed simulation. In the simulation that I applied 200-year floods and PMF to and under a condition connected with PMF, results showed overflowing the levees. Because of the difference between the frequency of dam outflow and the design flood in river, it is required to improve the existed flood plan in the downstream of Andong dam. As a result of this study, the optimal operation of reservoir systems can be proposed to mitigate the flood damage in the downstream of Andong dam and also can be used to establish the flood plans.

  • PDF

A Study on Hydraulic Characteristics of the Curved Channel in the Downstream of Dam (댐 하류 만곡부 하천에 대한 수리학적 특성 연구)

  • Choi, Han-Kyu;Beak, Hyo-Seon;Lee, Kye-Yu
    • Journal of Industrial Technology
    • /
    • v.25 no.A
    • /
    • pp.3-14
    • /
    • 2005
  • In order to accurately analyze the detailed hydraulic characteristics of the curved channel in the downstream of dam with the hydraulic structures such as bridge piers, RMA2 model which is one of two-dimensional models is applied to ChunCheon dam downstream curved channel. A series of hydraulic model tests are carried out for comparison studies. HEC-RAS model is also applied to the same site. There are no errors when velocities and water levels resulted from HEC-RAS model RMA2 model are compared with those of hydraulic model test on the straight channel. But, it is found that results of RMA2 model have a better agreement with those of hydraulic model test than those of HEC-RAS model on the curved channel with bridge piers. Additionally, RMA2 model can be predicted the eddy phenomena around bridge piers of the curved channel.

  • PDF

Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works (II)-Economic Benefit and Cost Allocation Analysis (댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (II) -경제적 편익 및 비용분담률 분석)

  • Yoo, Seung-Hoon;Lee, Gwang-Man;Lee, Eul-Rae
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.9
    • /
    • pp.765-776
    • /
    • 2011
  • Flood discharge capacity in a dam downstream reach has been decreased after dam construction because of the river cross section reduction impacted by farm lands, sand-bars and parking lots, etc. in river flood plains. Those obstacles being in the river inside areas have caused negative influences to the dam operation policy. Therefore, the dam downstream river improvement work associated with the dam operation improvement plan is under construction for removing reduction factors on the dam effective storage, assuring flood safety in the dam downstream river and incrementing dam operation benefits. But the project has issued some problems such as project feasibility, economic evaluation, cost allocation and benefit share, etc. Since a dam enterpriser has not committed such kind of project before, it is necessary to set up an objective analysis process and a quantitative financial valuation. This study examines the measurable economic benefits and the cost allocation of the project for the fairness between benefit owners (central government and water electricity enterprisers). As a result, the total economic benefit from 3 dams (Imha, Daechung and Youngdam Dam) accounts for 14.41 Billion Won/year. The financial valuation of K-water as a project enterpriser is approximately estimated at 40% of the total value and the government is 60%.