  • The fundamental goal of this study is to minimize the uncertainty of the median fragility curve and to assess the structural vulnerability under earthquake excitation. Bayesian Inference with Markov Chain Monte Carlo (MCMC) simulation has been presented for efficient collapse response assessment of the independent intake water tower. The intake tower is significantly used as a diversion type of the hydropower station for maintaining power plant, reservoir and spillway tunnel. Therefore, the seismic fragility assessment of the intake tower is a pivotal component for estimating total system risk of the reservoir. In this investigation, an asymmetrical independent slender reinforced concrete structure is considered. The Bayesian Inference method provides the flexibility to integrate the prior information of collapse response data with the numerical analysis results. The preliminary information of risk data can be obtained from various sources like experiments, existing studies, and simplified linear dynamic analysis or nonlinear static analysis. The conventional lognormal model is used for plotting the fragility curve using the data from time history simulation and nonlinear static pushover analysis respectively. The Bayesian Inference approach is applied for integrating the data from both analyses with the help of MCMC simulation. The method achieves meaningful improvement of uncertainty associated with the fragility curve, and provides significant statistical and computational efficiency.

수치모형과 수리분석을 활용한 도수터널 운영에 따른 수충격 영향 검토 (Water Hammer Impact of Diversion Tunnel with Operation Gate using the Numerical Model and Mathmatical Analysis)

  • 장석환;오경두;오지환;조준원
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2017년도 학술발표회
    • /
    • pp.323-323
    • /
    • 2017
  • 본 연구 대상인 주암댐-주암조절지댐간 도수터널은 저수지 간 연계운영을 통하여 서 남해안 일대의 용수 공급하기 위하여 건설되어 운영되었으나, 터널의 구조적 불안정성이 제기됨에 따라 향후 발생 가능성이 있는 용수공급 중단을 방지하기 위하여 신규 도수터널이 제안되었다. 계획된 신규 도수 터널의 주요 시설물은 크게 양방향 운영이 가능한 터널(D=3.3 m, L=11.23 km), 각 저수지 상황별 운영을 위한 취수문비 2개소, 도수가 이루어지는 상황에서 수문 돌발 폐쇄시 수충격을 감쇄하기 위한 배기구(air vents) 2개소가 계획되었다. 이에 따라 본 연구에서는 주암댐에서 주암조절지댐으로 최대 유량이 통수되는 상태에서, 수문폐쇄에 따른 수충격을 정량적으로 분석하고자 Joukowsky 공식에 적용하여 완폐쇄와 급폐쇄시 도수터널의 안정성을 검토하였으며, 수문 폐쇄로 인한 천이적인 흐름상태 등 수충격 모의가 가능한 1차원 ITM 모형을 적용하여, 수리분석과 수치모형과 결과 비교하고, 계획된 배기구의 유무에 따른 효과를 알아보고자 하였다. 분석 결과, 계획된 0.3 m/min으로 수문을 폐쇄할 경우, 도수터널의 안정성에는 문제가 없을 것으로 분석되었으나, 수문을 급 폐쇄 할 경우, 압력수두가 크게 증가하여 도수터널에 위험이 있을 것으로 분석되었으며 배기구 유무에 따른 수충격 검토 결과 도수터널 내의 수압상승을 적절히 조절하는 조압수조의 역할을 만족스럽게 수행할 것으로 분석되었다.

  • PDF

보령댐계통 물 공급망 운영에 있어서의 수량-수질(BOD)-전력을 고려한 보령댐 비상도수로 최적운영 Rule 연구 (Optimized Boreoung Dam Emergency Diversion Tunnel Operation Rule Study, considering Water Quantity-BOD-Electric Power in Boreong Dam Water Supply Network)

  • 임건묵;김성훈;류경식;정관수
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2020년도 학술발표회
    • /
    • pp.42-42
    • /
    • 2020
  • 충남서부권은 기상이변으로 강수량이 적고 가뭄이 심화되고 있는 반면, 신규수원 개발 적지 부족 등 용수공급에 어려움을 겪고 있다. 2015년부터 2016년까지 가뭄시 비상용수공급을 위해 비상도수로를 건설하였다. 이 비상도수로는 보령댐의 가뭄단계 상황기준으로 운영중에 있다. 가뭄단계 상황이 경계단계에 진입하면 도수로를 가동시작하여 관심단계 회복시에 중단하게 된다. 동 연구는 현재 운영중인 보령댐도수로의 가동Rule을 수량(이수안전도), 수질(BOD), 전력비용을 고려하여 시나리오별로(상시도수, 총 도수량대비 25%, 50%, 75%, 100%) 도수할 때 어느 도수 Rule이 수량-수질-에너지 넥서스 측면에서 가장 유리한지를 밝혀 내고자 하였다. 연구에 사용된 기초자료는 보령댐도수로 준공이후 2016년~2019년 도수실적 자료를 이용하였다. 수량(이수안전도) 검토는 MODSIM을 활용하였고, 수질개선효과는 실측 BOD를 기준으로 도수조건별로 오염부하량으로 검토하였다. 전력비용은 금강원수 도수년도별로 산정하여 분석하였다. 추가 연구결과를 통해 가뭄단계 상황기준, 월별 물관리 여건을 고려하여 기준향후 비상도수로 운영에 있어서 수량절량, 수질개선, 전력비용 절감을 기대할 수 있을 것이다.

  • PDF

안동-임하 연결도수로 설치에 따른 가용 수자원량에 관한 연구 (Study on Potential Water Resources of Andong-Imha Dam by Diversion Tunnel)

  • 추연문;지홍기;권기대;김철영
    • 한국산학기술학회논문지
    • /
    • 제15권2호
    • /
    • pp.1126-1139
    • /
    • 2014
  • 도시화 및 산업화에 따른 온실가스의 증가로 전 세계적인 이상기후 현상이 빈번하게 발생하고 있으며, 국내에서도 이러한 현상의 하나로 홍수와 가뭄의 영향이 지속적으로 심화되고 있다. 기후변화는 이수, 치수, 환경 등 다양한 측면에서 물 관리 전반에 걸쳐 복잡성을 가중시키고 불확실성을 확대시키는 등 많은 영향을 초래한다. 또한 과거와는 달리 하천유지수량, 환경용수량 등 다양한 용수수요의 증가에 따라 제한된 가용수자원의 추가적인 확보를 위한 분석과 연구가 필요하다. 본 연구에서는 안동댐과 임하댐 유역을 대상으로 기후변화 시나리오와 토양수분 저류구조 Tank 모형을 이용하여 장기 유출량을 산정하였고, 연결도수로를 통해 병렬 연결된 안동댐과 임하댐의 저수지 연결모의운영을 수행하여 임하댐에서 안동댐으로 전환되는 추가 가용 수자원량을 분석, 비교함으로서 미래 기후변화가 가용수자원 확보에 미치는 영향을 정량적으로 평가하였다. 대표농도경로 기후변화 시나리오 중 RCP 6.0과 RCP 8.5를 이용하여 대상유역의 상세 수문자료를 생산하여 과거 유역의 관측 강수량 자료와 경향성을 분석한 결과 시나리오별 모두 5%~9%의 범위로 강수량이 증가하는 것으로 분석되었으며, 목적함수를 이용한 민감도 분석을 통해 가장 높은 적합도를 나타낸 개체군의 크기는 1000 이었으며 교차비율은 80% 이었다. 본 연구의 결과를 이용하여 미래 기후변화에 대응한 물 관리 측면에서 저수지 운영의 효과를 극대화하고 장기적으로 안정적이고 풍부한 용수공급 계획을 수립하는데 도움이 될 것으로 기대된다.

Experimental and numerical investigation on bearing mechanism and capacity of new concrete plug structures

  • Weng, Yonghong;Huang, Shuling;Xu, Tangjin;Zhang, Yuting
    • Computers and Concrete
    • /
    • 제24권5호
    • /
    • pp.459-468
    • /
    • 2019
  • The stability and safety of concrete plug structure of diversion tunnel is crucial for the impoundment of upstream reservoir in hydropower projects. The ongoing Wudongde hydropower plant in China plans to adopt straight column plugs and curved column plugs to replace the traditional expanded wedge-shaped plugs. The performance of the proposed new plug structures under high water head is then a critical issue and attracts the attentions of engineers. This paper firstly studied the joint bearing mechanism of plug and surrounding rock mass and found that the quality and mechanical properties of the interfaces among plug concrete, shotcrete, and surrounding rock mass play a key role in the performance of plug structures. By performing geophysical and mechanical experiments, the contact state and the mechanical parameters of the interfaces were analyzed in detail and provide numerical analysis with rational input parameters. The safety evaluation is carried out through numerical calculation of plug stability under both construction and operation period. The results indicate that the allowable water head acting on columnar plugs is 3.1 to 7.4 times of the designed water head. So the stability of the new plug structure meets the design code requirement. Based on above findings, it is concluded that for the studied project, it is feasible to adopt columnar plugs to replace the traditional expanded wedge-shaped plugs. It is hoped that this study can provide reference for other projects with similar engineering background and problems.

보령댐 도수로 운영기준에 따른 보령댐 운영 효과 분석 (Analysis of Boryeong Dam Operation Effects according to Boryeong Dam Diversion Tunnel Operation Standard)

  • 최영제;안재황;이재응
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2017년도 학술발표회
    • /
    • pp.52-52
    • /
    • 2017
  • 우리나라에서 2014년부터 2016년까지 중부지방을 중심으로 지속된 강우부족은 용수공급에 피해를 발생시키는 주요 원인이 되었다. 2014년부터 2016년까지 보령 기상관측소의 연강수량은 각각 1,010.6 m, 782.5 mm, 792.8 mm였으며 이는 보령 기상관측소 연강수량의 평년값인 1,244.3 mm의 81.2 %, 62.9 %, 63.7 %에 해당하는 양이었다. 이러한 강우부족으로 인하여 충청남도 서북부권에 용수공급을 담당하고 있는 보령댐의 저수율이 20 % 미만으로 감소하는 문제가 발생하였다(2015년 11월 6일 기준). 국토교통부는 보령댐의 저수율 감소가 지속될 경우 보령댐 용수공급 지역에 피해가 발생할 것으로 판단하였고 이러한 피해를 저감시키는 방안으로 금강 백제보 하류의 물을 보령댐 상류로 공급하기 위한 긴급용수공급 시설인 보령댐 도수로를 설치하였다. 보령댐 도수로 운영 시 지형 및 수질 문제를 해결하기 위하여 가압시설, 정수시설과 같은 부대시설이 함께 설치되었다. 이로 인해 도수로 운영 시 부대시설의 운영비용이 소요되므로 보령댐 도수로는 운영일수를 최소화하고 보령댐의 용수공급은 최대화하는 도수로의 운영방안이 필요하다. 본 연구에서는 보령댐 도수로의 효율적인 운영방안을 모색하기 위하여 다양한 보령댐 도수로 운영방안을 설정하고 각 운영방안 따른 저수지 모의운영을 실시하여 보령댐 도수로의 운영효과를 분석하고자 하였다. 도수로의 운영방안은 보령댐 유역의 유역평균강수량을 활용하여 산정한 SPI, 보령댐 실측유입량을 활용하여 산정한 월 평균유입량, 용수공급 조정기준의 단계별 저수량 등을 활용하여 설정하였다. 또한 저수지 모의운영 결과를 평가하기 위한 지표로 용도별 용수공급 신뢰도와 용수공급 조정기준의 각 단계별 도달일수, 도수로 운영일수, 무효방류량 등을 산정하고 그 결과를 비교 분석하였다.

  • PDF

영천 화강암지역 지하수의 지화학적 모델링 (Geochemical Modeling of Groundwater in Granitic Terrain: the Yeongcheon Area)

  • Koh, Yong-Kwon;Kim, Chun-Soo;Bae, Dae-Seok;Yun, Seong-Taek
    • 대한지하수환경학회지
    • /
    • 제5권4호
    • /
    • pp.192-202
    • /
    • 1998
  • 영천 도수터널 내 화강암 지역의 단열대를 따라 유출되는 지하수에 대하여 지화학 및 환경동위원소 연구를 수행하였다. Ca-HCO$_3$유형에 속하는 유출수의 화학 조성은 화강암을 구성하는 규산염 광물 및 열극 충진 방해석의 지화학적 용해 반응에 의해 설명되며, 그 수문지화학적 진화는 부분적 개방계에서 진행되었음을 보여준다. 환경동위원소 연구 결과, 유출수는 모두 강수 기원으로서 적어도 1953년 이전에 함양된(즉 체류 시간이 최소 45년 이상인) 지하수임을 지시해주며, 나아가 지표로부터의 거리와 단열대의 발달 상태에 따라 부분적으로 지표수의 혼입이 진행되고 있음을 지시한다. 지화학 반응 경로 모델인 CHILLER를 이용하여 본 지역 화강암 지하수의 수문지화학적 진화를 모델링 하였다. 그 결과, $Ca^{2+}$, $Na^{+}$, HCO$_3$$^{-}$ 및 pH는 규산염 광물 및 방해석의 용해 작용과 더불어 점차 증가되는 반면, $Mg^{2+}$$K^{+}$는 각각 몬트모릴로나이트와 백운모의 2차 생성과 더불어 감소됨을 보여준다. 2차 광물의 생성 순서는 적철석, 깁사이트, 카올리나이트, 몬트모릴로나이트, 백운모, 장석의 순이다. 모델링 결과는 유출수의 물리화학적 분석값과 2차 광물의 동정 결과와도 잘 일치한다. 따라서, 이러한 물-암석 상호 반응 모델링을 비교적 복잡한 암반 지하수의 수문지화학적 진화 해석에 타당성 있게 적용할 수 있음을 보여준다.

  • PDF

상류 수위관측소 자료를 활용한 하류 지점 수위 예측 (Prediction of Water Level at Downstream Site by Using Water Level Data at Upstream Gaging Station)

  • 홍원표;송창근
    • 한국안전학회지
    • /
    • 제35권2호
    • /
    • pp.28-33
    • /
    • 2020
  • Recently, the overseas construction market has been actively promoted for about 10 years, and overseas dam construction has been continuously performed. For the economic and safe construction of the dam, it is important to prepare the main dam construction plan considering the design frequency of the diversion tunnel and the cofferdam. In this respect, the prediction of river level during the rainy season is significant. Since most of the overseas dam construction sites are located in areas with poor infrastructure, the most efficient and economic method to predict the water level in dam construction is to use the upstream water level. In this study, a linear regression model, which is one of the simplest statistical methods, was proposed and examined to predict the downstream level from the upstream level. The Pyeongchang River basin, which has the characteristics of the upper stream (mountain stream), was selected as the target site and the observed water level in Pyeongchang and Panwoon gaging station were used. A regression equation was developed using the water level data set from August 22th to 27th, 2017, and its applicability was tested using the water level data set from August 28th to September 1st, 2018. The dependent variable was selected as the "level difference between two stations," and the independent variable was selected as "the level of water level in Pyeongchang station two hours ago" and the "water level change rate in Pyeongchang station (m/hr)". In addition, the accuracy of the developed equation was checked by using the regression statistics of Root Mean Square Error (RMSE), Adjusted Coefficient of Determination (ACD), and Nach Sutcliffe efficiency Coefficient (NSEC). As a result, the statistical value of the linear regression model was very high, so the downstream water level prediction using the upstream water level was examined in a highly reliable way. In addition, the results of the application of the water level change rate (m/hr) to the regression equation show that although the increase of the statistical value is not large, it is effective to reduce the water level error in the rapid level rise section. Accordingly, this is a significant advantage in estimating the evacuation water level during main dam construction to secure safety in construction site.

댐 월류 수리실험을 통한 사면붕괴지연 성능인자 도출 (Performance Factors for Delaying Slope Failure through Hydraulic Experiments of Dam Overtopping)

  • 이성우;김동현;이승오
    • 한국방재안전학회논문집
    • /
    • 제17권2호
    • /
    • pp.1-11
    • /
    • 2024
  • 국내 저수지의 대부분 흙댐으로 되어있다. 흙댐은 건설비용이 저렴하고, 용이한 시공성을 가지고 있기 때문이다. 그러나 흙댐은 침투나 월류에 매우 취약하기 때문에, 과도한 홍수량이 발생하였을 경우 급격한 붕괴 가능성이 매우 높다. 급격한 붕괴는 급격한 홍수량 증가로 이어져, 하류 하천 또는 민가에 매우 큰 피해를 발생시킬 가능성이 있다. 이에 본 연구에서는 흙댐 사면에 포설한 사석의 흙댐 붕괴 지연효과에 대해 실험연구를 수행하였다. 붕괴시간이 지연되면, 대피시간을 확보하여 인명 피해를 크게 줄일 수 있기 때문에 재난 대응 관점에서 큰 의미가 있다고 판단된다. 수리실험은 직선형 개수로에서 수행하였으며, 보호공 사석의 크기를 2가지로 결정하였다. 기존 선행 실험과는 달리 실험을 부정류로 수행하였으며 이를 통해 댐 내부의 수위 상승 변화 효과를 반영하였다. 대상댐은 도수터널에 설치된 가물막이 댐으로 결정하였다. 실험결과 수행한 실험조건에서 사석보호공이 있는 경우 사면의 붕괴를 방지할 수 있었고, 사석보호공이 없는 경우 사석의 입경 증가에 따라 붕괴 시간 지연 효과가 있는 것으로 나타났다. 이는 첨두 유출량 감소로 댐 하류부의 피해를 감소시키는 효과가 있을 것으로 판단된다. 또한 저수지 붕괴에 대한 비상대처계획(EAP) 수립 시 주요 참고자료로 활용될 수 있을 것이다.