Quantitative Risk Assessment based on Fault Tree Analysis for Gangform Accident (갱폼 재해의 FTA를 통한 정량적 위험성 산정에 관한 연구)

  • Ham, Young Jong;Kee, Jung Hun;Park, Jong Yil
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.40-47
    • /
    • 2020
  • Although gangform has good workability due to the integration of outer wall forms and working platforms, 22 workers were died from 21 gangform related accidents during 2012 to 2016. Quantitative risk assessment is required for evident based prevention measure selection. In this study, based on 52 accident data from 2004 to the first half of 2019, FTA is conducted for probabilities of direct causes and their contribution to accidents. Three stages are considered; gangform installation, dismantling and lifting, and using. The effectiveness of countermeasures is evaluated through minimum cut set, RAW and RRW. Complete assembly of gangform on the ground level, detailed planning, and fall prevention device are suggested as prevention measures for installation, dismantling and lifting, and using stages, respectively.

Development of the Pushing Type Cutting Device to Dismantle Concrete Structure for Decommissioning of Nuclear Power Plant (원전해체 시 콘크리트 구조물 절단을 위한 밀기형 절단장치 개발)

  • Lee, Bong-Jae;Kwon, Yong-Kyu;Hong, Chang-Dong;Lee, Dong-Won;Min, Kyong-Nam
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.18 no.1
    • /
    • pp.103-111
    • /
    • 2020
  • Pulling-type cutting devices, which use a diamond wire saw, have been used generally for cutting concrete structures. In this study, a pushing-type cutting device with a collection cover was developed by overcoming the disadvantages of pulling-type devices. In this device, dry or liquid methods can be selected to cool frictional heat. Operation and leakage tests of the dust generated during the dismantling of a concrete structure were carried out, confirming the suitable operation of the fabricated cutting device; the leakage rate was approximately 1.7%. For a conservative evaluation, the internal dose of workers was estimated in dismantling the core center part of biological shield concrete with a specific activity of 99.5 Bq·g-1. The committed effective dose per worker was 0.25 mSv. The developed cutting device contributed to reducing radioactive concrete waste and minimizing worker exposure due to its easy installation. Therefore, it can be utilized as a cutting apparatus for dismantling not only reinforced concrete structures but also radioactive biological shield concrete in nuclear power plant decommissioning efforts.

A Study on Structural Performance by Condition Grade of Temporary Equipment (가설기자재 상태등급별 구조성능에 관한 연구)

  • Moon, Seong-Oh;Mo, Seung-Un;Youn, Ye-Bin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.16-17
    • /
    • 2020
  • The Temporary construction refers to the construction or dismantling of temporary structures installed for the construction of the main structure at the construction site, and the members constituting this temporary facility are called temporary equipment. Temporary equipment used in construction sites is mostly used products that are reused rather than new products, and it is necessary to consider performance degradation due to repeated use. This study is a preliminary study to develop the performance evaluation criteria applied to temporary equipment that is distributed and reused for secondhand. This study is to analyze the performance status of temporary equipment of used goods owned by rental companies by condition grade through performance tests.

  • PDF

A Study on the Change of Urban Spatial Structure and Transformation of circumjacent Lot by Course of the Construction of Railroads and the Dismantlement of Eupseong in the Early 20th Century (20세기 초 철도부설과 읍성해체에 따른 도시공간구조와 주변 필지 변화에 관한 연구)

  • Kim, Dae-Jung;Cho, Jae-Mo
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.31-40
    • /
    • 2019
  • Considering the situation in the early 20th century when the existing urban system centered on urban areas began to change, the biggest factors causing urban structural changes in urban areas are construction of railroad and urban dismantling. The change process of Eupseong, in the microscopic viewpoint, can be understood as a process of change in the course of dismantlement of town's demarcation, improvement of accessibility and urban expansion due to the construction of railroads, process of urban expansion following the crumbling boundaries and structural changes. This study aimed to look at the transformation process of the Eupseong in the early 20th century, focusing on the demolition of the castle and the railway construction from a microscopic point of view of city.

Status and Problems of Buildings Neglected for Long Period after Discontinuance of Construction in Jeju (제주도내 공사중단 장기방치 건축물 현황과 문제점)

  • Kim, Doo-Seong;Han, In-Deok;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.153-154
    • /
    • 2023
  • Neglected buildings for long period can seriously reduce the durability of the building due to rust in rebars and deterioration in concrete quality due to exposure to outside air, and the seriousness of suspended buildings such as safety accidents and social crimes is emerging due to poor management. In this study, various problems such as the occurrence of safety accidents were analyzed through a fact-finding survey of buildings that have not been maintained due to long-term neglect in all areas of Jeju. In order to reuse a building that has been discontinued, the safety of the building structure itself must be checked. After securing safety through durability investigation, construction should be resumed or converted into a normal building through re-purposing, dismantling, remodeling, etc.

  • PDF

Application of 3D Printing Technology for Formwork Constructability Review in Tall Building Construction (초고층 거푸집 공사의 시공성 검토를 위한 3D Printing의 활용)

  • Lee, Junehyuck;Lee, Dongmin;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.69-70
    • /
    • 2016
  • The constructability of formwork has a significantly influence on the duration and cost in tall building construction. However, current installation and dismantling process are conducted with heuristic approaches due to the absence of reasonable constructability review method. This study proposes a new method to review the constructability of formwork by utilizing 3D printing technology. It is expected that the suggested review method could reduce formwork duration and cost with subjective, but rational manner.

  • PDF

Development of the Selection of Optimal Conceptual Design for the Noise-reduced Aluminum System Form

  • Hong, Jong Hyun;Yeom, Dong Jun;Seo, Jung Hoon;Kim, Young Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.708-709
    • /
    • 2015
  • In Korea, a series of noise-reduced aluminum forms are being recently used in apartment housing construction. However, their complicated and time-consuming work processes, and the noise which is still generated due to the inherent property of aluminum when especially installing and dismantling them are have been pointed out as a problem to be certainly solved for increasing their practical use in construction sites. The primary objectives of this study are to propose a conceptual design of a newly designed noise-reduced aluminum form in which the noise can be enormously decreased during form works. The conceptual design in this study improved problems of conventional system aluminum forms, and, later, a system aluminum form developed based on this conceptual design will be able to ensure noise-reduction and safety as well as excellent applicability.

  • PDF

RISK ASSESSMENT USING BIM BASED SAFETY MANAGEMENT SYSTEM

  • Hongseob Ahn;Hyunjoo Kim;Wooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.107-110
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, falsework (temporary structures) in construction projects is fundamentally important. However, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. It is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop the safety assessment system, this research utilizes the BIM technology and collects important information by importing data from BIM models and use it in the planning stage.

  • PDF

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

A Case Study on Explosive Demolition of Turbine Building of Steel Frame Structure (터빈동 철골구조물 발파해체 시공사례)

  • Hoon, Park;Sung-Woo, Nam;You-Song, Noh;Chul-Gi, Suk
    • Explosives and Blasting
    • /
    • v.40 no.4
    • /
    • pp.35-46
    • /
    • 2022
  • While the construction of dismantling the old industrial complex and restoring the dismantled industrial site to its original natural environment the is underway. In this paper, we introduce a case of dismantling a turbine building which one of the a large steel frame structures in an old industrial complex by applying the progressive collapse method among the blasting demolition methods. We used a charge container that generates a metal jet to cut dismantling the turbine building. The thickness of the steel structure was adjusted to 30 mm or less by applying gouging, which was a method of digging deep grooves by gas and oxygen flames or arc thermal, in the part where the cutting thickness was thick in the blasting section. The total amount of charge used for the blasting of turbine building was 175 kg, 165 electronic detonators and 124 charge containers. As a result of the blasting demolition, the turbine building was collapsed precisely according to the estimated direction. The blasting demolition was completed without causing any damage to the surrounding facilities.