• 제목/요약/키워드: discharge and water quality

검색결과 703건 처리시간 0.022초

소규모 폐수배출시설 관리 강화의 필요성 (Necessity of Strengthening Small-Scale Wastewater Discharge Facilities Management)

  • 박재홍;류덕희
    • 한국물환경학회지
    • /
    • 제34권2호
    • /
    • pp.226-233
    • /
    • 2018
  • Small-scale wastewater discharge facilities account for 98% of all workplaces, but in the generation and emission of major pollutants, they account for 27.5 % and 23.5 %, respectively. Since the proportion of the emission load of the small-scale workplace is not large, the national environmental policy has been established mainly around large-scale wastewater discharge facilities. However, in the case of specific hazardous substances in water, the amount of the discharge load of the small-scale wastewater discharge facility was 2.4 times higher than that of the generation load. Certain types of specific hazardous substances in water, which have a higher discharge load than large-scale wastewater discharge facilities, account for 24 ~ 32 %. There are also cases in which the discharge load from a small-scale discharge facility is more than four times higher, depending on the specific kind of water pollutant. As a result of inspections, the violation rate of the small-scale wastewater discharge facility among the total violations by facilities is 93.9 ~ 97.5 %. As a result, the ecotoxicity value of small-scale wastewater discharge facilities was high in most industries, and there was a fluctuation in the measured value. This indicates that the ecological integrity of the water system can be largely influenced by small-scale wastewater discharge facilities. Therefore, it is necessary to expand the environmental management of small-scale wastewater discharge facilities, and in some cases, the effect of the improvement in quality may be more significant than in the management of large-scale wastewater discharge facilities.

미계측 지점에서의 유출 모의 및 예측 (Runoff Simulation and Forecasting at Ungaged Station)

  • 안상진;최병만;연인성;곽현구
    • 한국수자원학회논문집
    • /
    • 제38권6호
    • /
    • pp.485-494
    • /
    • 2005
  • 유량과 수질의 관계를 분석하는 것은 매우 중요하다. 하천의 실시간적 관리를 위해서는 유량과 수질의 측정이 동일한 지점에서 동시간적으로 이루어져야 보다 효과적이다. 그러나 수질자동측정망 지점과 T/M 수위관측소가 원거리에 위치한 경우들이 있으며, 평창강 수질자동측정망 지점이 그 중 하나이다. 이러한 지점에서는 보다 정확한 유량 산정과 이를 활용한 예측 프로그램이나 시스템이 요구된다. 이번 연구에서는 미계측 지점인 평창강 수질자동측정망 지점에 유량예측 신경망 모형을 적용하고, 적용성을 검토하기 위해 WMS 모형의 모의결과와 비교하였다. WMS 모형은 첨두유량이 작고, 수문곡선이 단조로운 사상에 적합한 것으로 나타났다. 신경망 모형의 유출량 예측값은 비유량과 WMS 모형의 모의값에 근사하였으며, 미계측 지점에서의 유출량 변화성향을 잘 반영하는 것으로 나타났다.

방사보가 도시하천수질에 미치는 영향에 관한 연구 (A study of the Effect of groin on the Water Quality in the Urban River)

  • 조홍제;김일권
    • 상하수도학회지
    • /
    • 제12권3호
    • /
    • pp.81-90
    • /
    • 1998
  • The purpose of this study was to analyze the effect of the groin which was constructed in the down stream of urban river for the prevention of sedimentation on the improvement of the water quality. We studied on the groin in the downstream of Taehwa River constructed to keep the navigation depth of Ulsan day, and used the measured data of the water quality and river discharge. In order to analyze the charge of the water quality due to the groin Que12E model was applied, and BOD and DO was examined. The analysis showed that removal of the groin would not have significant effect on the improvement of the water quality, rather, interception of the pollution source coming into the upstream of the groin would be more influential on the improvement of the water quality. Therefore, It was concluded that to improve the water quality in mild bottom slop of tidal river, interception of the pollution source and river maintenance discharge should precede.

  • PDF

낙동강 수질관리 방안-하수분리 무방류시스템의 개념적 고찰 (A Conceptual Zero-Discharge System for Water Quality Management of the Nak-Dong River)

  • 박희경;현인환;박중현
    • 상하수도학회지
    • /
    • 제11권2호
    • /
    • pp.40-49
    • /
    • 1997
  • From water management point of view, the industrialization that we have achieved in the last decades brought out two major changes: water shortage and water quality deterioration. They are getting the big obstacles we must overcome to continuously pursue industrialization for further development in the next century. Many plans using dams and advanced treatment methods have been developed for control of quantity and quality, respectively. In this paper, an alternative is conceptually reviewed which is much different from the plans in regard that the alternative looks at system itself. It is based on an interceptor system coupling with a concept of zero-discharge. This system allows no discharge of wastewaters from point-sources to waterbodies which are very sensitive in terms of water quality. In addition reuse of treated effluents is emphasized to a maximum extent. The application of the system to the Nak-Dong river basin indicated that an interceptor system will need from the middle reaches of the basin where industrialization gets heavier. Since wastewaters are not directly discharged to the river, water quality of the down stream will improve. Treated effluents will be able to be reused at a number of industrial complex which currently get water from the Nak-Dong river. This reuse will help alleviate water shortage. The biggest problem anticipated is cost for building and operating such system. A cost-sharing plan among the beneficiaries is considered. Further research is suggested focusing on detailed engineering and technical matters for potential implementation.

  • PDF

유량과 수질을 연계한 실시간 인공지능 경보시스템 개발 (I) 유량-수질 예측모형의 적용 (A Development of Real Time Artificial Intelligence Warning System Linked Discharge and Water Quality (I) Application of Discharge-Water Quality Forecasting Model)

  • 연인성;안상진
    • 한국수자원학회논문집
    • /
    • 제38권7호
    • /
    • pp.565-574
    • /
    • 2005
  • 평창강 수질자동측정망 실시간 자료를 이용하여 강우시와 무강우시로 구분하여 분석하였다. 강우시에 측정된 TOC 자료는 무강우시 측정된 자료에 비해 평균값, 최대값, 표준편차가 크게 나타났으며, 강우시의 DO 자료는 무강우시에 측정된 자료보다 낮아 유량이 수질변화에 영향을 미치는 것으로 분석되었다. 신경망 모형과 뉴로-퍼지 모형으로 수질예측 모형을 구성하고, 적용하였다. LMNN, MDNN, ANFIS 모형은 TOC 모의에서 DO 예측에서는 LMNN, MDNN 모형이 ANFIS 모형보다 좋은 결과를 보였으며, 정량적 자료에 정성적 자료인 시간을 학습한 MDNN 모형이 가장 작은 오차를 보였다. 하천의 실시간적 관리를 위해서는 유량과 수질의 측정이 동일한 지점에서 동시간적으로 이루어져야 보다 효과적이다. 그러나 수질자동측정망 지점과 T/M 수위관측소가 원거리에 위치한 경우들이 있으며, 평창강 수질자동측정망 지점이 그 중 하나이다. 연구에서는 평창강 수질자동측정망 지점의 유출예측을 위한 신경망 모형을 구성하여 수질예측 모형과 연계하였으며, 연계된 모형은 수질예측에 개선된 결과를 보였다.

낙동강 상류 유역에서의 유량변동에 따른 수질의 통계학적 분석 (A Stochastic Analysis of the Water Quality with Discharge Variation in Upper Nakdong River Basin)

  • 최현구;한건연;최승용
    • 환경영향평가
    • /
    • 제20권6호
    • /
    • pp.833-843
    • /
    • 2011
  • The purpose of this study is to analysis pollutant loading of upper Nakdong River basin according to the variation of discharge. The correlation between discharge and pollutant concentration and between discharge and pollutant loading were analyzed by statistical method, respectively. Regression equation of pollutant loading and discharge was represented as $L=_aQ^b$ in which L = pollutant loading(kg/day), and b = regression coefficients, and Q = discharge($m^3/day$). The correlation coefficient of study area was in range of 0.8428 to 0.9935. The SS was the highest b value 1.2856~1.7730 among water quality parameters because the pollutant loading of SS was much affected by flow. Additionally, the applicability of the regression equations was verified by comparing predicted results with observed value. The correlation coefficient of verification was in range of 0.8983 to 0.9987 and NSEC was in range of 0.7018 to 0.9960. Therefore the pollutant loading was good correlated with discharge. The main result will be used as basic data for water quality management and design of environment fundamental facilities.

SWMM과 WASP5모형을 이용한 간척지 담수호의 수질거동 특성 조사 (Behavior of Water Quality in Freshwater Lake of Tide Reclaimed Area Using SWMM and WASP5 Models)

  • 김선주;김성준;이석호;이준우
    • 한국농공학회지
    • /
    • 제44권2호
    • /
    • pp.148-160
    • /
    • 2002
  • Lake water quality assessment information is useful to anyone involved in lake management, from lakeshore owners to lake associations. 11 provides lake water quality, which can improve how to manage lake resources and how to measure current conditions. It also provides a knowledge base that can be used to protect and restore lakes. SWMM was applied to simulate the discharge and pollutant loads from Boryeong watershed, and WASP5 was applied to analyze the changes of water quality in Boryeong freshwater lake. In each model, the most suitable parameters were calculated through sensitive analysis and some parameters used default data. Simulated in SWMM and measured discharge showed the accuracy of 88.6%. T-N and T-P exceeds the criteria in the simulation of water quality in Boryeong freshwater lake, and control of pollutant loads in the main stream showed the most effective way. Integrated water quality management system was developed to give convenience in the operation of SWMM and WASP5 and data acquisition.

도시하천에서 하수처리수의 유지용수 이용에 따른 영향 평가 연구 (Study on the Effects of In-streams by Discharging the Treated Sewage in Urban Stream)

  • 방천희;박재로;권혁
    • 한국농공학회논문집
    • /
    • 제47권5호
    • /
    • pp.75-86
    • /
    • 2005
  • Recently since urbanization has brought about a dried stream and a worse water quality, Anyang city discharged the third treated sewage into the upper stream of Anyancheon and Hakuicheon. As the result, Hakuicheon had the water level and velocity enough for a living thing in the water to live in but water quality was worse than it had been. Therefore in case of meeting the water level and velocity of the second grade water-quality which living things in the water can live in, the discharge and water quality to secure in-stream flow must be at least 0.350 $m^3/s$ and $BOD_5\;3.2 mg/{\iota}$ respectively. In Anyancheon the water level was increased a little higher than it had been but the velocity was almost unchanged in comparison with it before. On the other hand the water quality was a little better than it had been. Therefore in case of meeting the water level and velocity of the third grade water-quality that people can do water-friendly activity, the discharge and water quality to secure in-stream flow must be at least 0.688 $m^3/s$ and $BOD_5\;4.8 mg/{\iota}$ respectively. The water-quality prediction on the suggested eight scenarios was simulated in all satisfying the third grade water-quality.

낙동강 수계에서 제사방적제조 업체에 대한 공정별 원단위산정 및 분석 (Unit Mass Estimation and Analysis from Textile Spinning/Weaving Manufacturing Facility Nearby Nakdong River Basin)

  • 이홍신;손건태;구정은;콘분락사;이홍태;이승환
    • 상하수도학회지
    • /
    • 제22권5호
    • /
    • pp.541-550
    • /
    • 2008
  • In this investigative study, the unit mass discharge for the major water quality parameters such as flowrate, SS, BOD, CODmn, CODcr, TN, TP from textile spinning/weaving industry nearby Nakdong river basin was estimated. To represent the respective industries, three companies from hundreds of textile spinning/weaving industries located in Nakdong river basin was carefully selected based on its manufacturing goods, flowrate and location for the estimation of unit mass discharge based on unit operation and process. There was a drastic decrease of unit mass discharge estimation between influents and effluents of water quality parameters, which represents the removal capacity of wastewater treatment plant. With the advent of new regulation on the imposed payment proportional to the total amount of pollutants discharge into the water body, the concept of cleaner production technology should be employed in the unit operation/process in wastewater treatment plant as well as textile manufacturing procedure to minimize the levy on the pollutants discharge. Unit mass discharge estimations of unit process (estimated in this study) in major water quality parameters (SS, BOD, COD, TN and TP) based on land were similar to those of composite process (estimated by National Institute of Environmental Research). But the unit mass discharge estimations of unit process in BOD and CODmn based on total sale were much higher than those of composite one while in SS, TN and TP similar to each other. For the detailed estimation of the imposed payment, unit mass estimation based on unit process should be further emphasized.

인위적인 요인이 하천의 유량과 수질변화에 미친 영향 - 일본 하다노 분지를 사례 로 - (The impact of anthropogenic factors on changes in discharge and quality of water in the Hadano basin, Japan)

  • 양해근
    • 대한지리학회지
    • /
    • 제30권3호
    • /
    • pp.242-254
    • /
    • 1995
  • 본 연구에서는 1960년대 이후 공업화와 도시화가 급격히 진행되고 있는 일본 하다 노 분지의 하천을 대상으로 유량과 수질의 변화를 조사하여, 수문환경의 변화에 인위적인 요인들이 어떻게 영향을 미치고 있는가를 알아보고자 하였다. 하다노 시는 분지의 풍부한 지하수를 기반으로 공업단지를 유치했으며, 그것을 계기로 급격한 인구증가와 토지이용변화 가 분지를 중심으로 일어났다. 급격한 도시화는 도시용수 부족을 유발했고, 그 대책으로서 새로운 지하수 개발과 다른 수계로부터 다량의 용수를 도입하여 각 하천의 유출특성이 변화 되었다. 그리고 하수 처리능력을 넘는 생활.산업폐수는 각 하천의 수질환경을 악화시키는 주요한 요인이 되고 있다. 각 하천 상.하류간의 유량증가에 대한 상관계수 r은 0.81-0.92이 고, 유량증가에 따른 오염 부하량은 약 3.7-6.9배로 증가하고 있다. 그리고 하수도 보급이 미비한 선정과 공업단지가 입지한 선앙에서 인위적인 유량증가와 수질악화가 현저하고, 인 위적인 영향에 의한 유량.수질의 일 변화도 뚜렷하게 나타나고 있다. 하수 처리지역의 확 대로 하천 수질은 점차적으로 회복되는 경향을 보이고 있지만, 상류에서의 토지이용 변화의 억제와 지하수의 인공유량 등과 같은 분지의 수문학적 특성을 고려한 근본적인 대책을 강구 하지 않는 한 극단적인 지하수 용출량의 저하를 초래해 하천 수문환경은 더욱 악화될 가능 성이 크다.

  • PDF