• Title/Summary/Keyword: direct construction approach

Search Result 88, Processing Time 0.026 seconds

An Empirical Analysis of the Relationship between Direct Construction Approach and Construction Quality in General Construction Companies (종합건설기업의 직접 시공과 건설 품질 사이의 관련성에 대한 실증분석)

  • Park, Hong-Jo;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.619-628
    • /
    • 2023
  • This study undertook a empirical analysis, delving into the association between the direct construction approach and the construction quality of general construction companies. The research hinged on corporate financial data to elucidate the premise that a reduced emphasis on direct construction approach by general construction companies correlates with a notable prevalence of building defects. Specifically, the analysis engaged with the top 100 construction companies based on their construction capability evaluation in 2022. This appraisal leveraged the Empirical Research Model(ERM) rooted in financial data-sets spanning 2017 to 2021. Findings underscored that as the ratio of direct construction approach diminishes, the incidence of building defects amplifies, signifying a consequential dip in construction quality. Moreover, the research reaffirmed that companies with elevated construction capability evaluations or larger organizational scales tend to register decreased defect rates. This study fortifies, from a theoretical perspective, the legislative imperatives championing direct construction approach, by empirically spotlighting the potential perils of over-reliance on subcontracting.

Resolving the Ambiguities of Negative Stripping Construction in English : A Direct Interpretation Approach (영어 부정 스트리핑 구문의 중의성 해소에 관한 연구: 직접 해석 접근법을 중심으로)

  • Kim, So-jee;Cho, Sae-youn
    • Cross-Cultural Studies
    • /
    • v.52
    • /
    • pp.393-416
    • /
    • 2018
  • Negative Stripping Construction in English involves the disjunction but, the adverb not, and a constituent NP. This construction is an incomplete sentence although it delivers a complete sentential meaning. Interpretation of this construction may be ambiguous in that the constituent NP can either be construed as the subject, or as the complements including the object. To generate such sentences and resolve the issue of ambiguity, we propose a construction-based analysis under direct interpretation approach, rejecting previous analyses based on deletion approaches. In so doing, we suggest a negative stripping construction rule that can account for ambiguous meaning. This rule further can enable us to explain syntactic structures and readings of Negative Stripping Construction.

Data mining approach for identifying factors impacting construction accident costs: from indirect expenses perspectives

  • Ayesha Munira CHOWDHURY;Eun-Ju HA;Jae-ho CHOI
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.319-326
    • /
    • 2024
  • Construction projects account for a significant proportion of workplace hazards globally. While construction cost reports typically emphasize direct accident costs such as treatment expenses, nursing care costs, or disability benefits, indirect factors like work interruption loss costs or consolation costs are frequently overlooked, because it is relatively difficult to estimate those factors in advance. Recognizing and accurately estimating the indirect costs factors associated with construction accidents would not only shed light on the monetary impact these incidents have on overall project costs but also would enable to estimate the total accident cost in advance. The current study seeks to identify factors influencing indirect costs, which ultimately govern the total accident cost, through a data mining approach. A survey was conducted in domestic construction companies, resulting in a dataset of 1038 accident records collected from construction sites. First, statistical analysis was performed to uncover characteristics and patterns of factors affecting construction accident costs from both direct and indirect perspectives. Later, this study proposes four distinct machine learning (ML) models, comparing their performances in predicting the total accident cost (including indirect costs) in advance. Additionally, this research sheds light on an important issue in construction data analysis, which is the scarcity of data in a particular class, by applying random oversampling and random undersampling techniques. The suggested framework can assist practitioners and management in estimating construction accident costs and identifying the relevant attributes that impact accidents at the construction site for future practices.

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.

Post-earthquake fast building safety assessment using smartphone-based interstory drifts measurement

  • Hsu, Ting Y.;Liu, Cheng Y.;Hsieh, Yo M.;Weng, Chi T.
    • Smart Structures and Systems
    • /
    • v.29 no.2
    • /
    • pp.287-299
    • /
    • 2022
  • Rather than using smartphones as seismometers with designated locations and orientations, this study proposes to employ crowds' smartphones in buildings to perform fast safety assessment of buildings. The principal advantage of using crowds' smartphones is the potential to monitor the safety of millions of buildings without hardware costs, installation labor, and long-term maintenance. This study's goal is to measure the maximum interstory drift ratios during earthquake excitation using crowds' smartphones. Beacons inside the building are required to provide the location and relevant building information for the smartphones via Bluetooth. Wi-Fi Direct is employed between nearby smartphones to conduct peer-to-peer time synchronization and exchange the acceleration data measured. An algorithm to align the orientation between nearby smartphones is proposed, and the performance of the orientation alignment, interstory drift measurement, and damage level estimation are studied numerically. Finally, the proposed approach's performance is verified using large-scale shaking table tests of a scaled steel building. The results presented in this study illustrate the potential to use crowds' smartphones with the proposed approach to record building motions during earthquakes and use those data to estimate buildings' safety based on the interstory drift ratios measured.

TALENs Construction: Slowly but Surely

  • Hegazy, Wael Abdel Halim;Youns, Mahmoud
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.7
    • /
    • pp.3329-3334
    • /
    • 2016
  • Cancer is thought to be a direct result of transcriptional misregulation. Broad analysis of transcriptional regulatory elements in healthy and cancer cells is needed to understand cancer development. Nucleases regulatory domains are recruited to bind and manipulate a specific genomic locus with high efficacy and specificity. TALENs (transcription activator-like effector nuclease) fused to endonuclease FokI have been used widely to target specific sequences to edit several genes in healthy and cancer cells. This approach is promising to target specific cancer genes and for this purpose it is needed to pack such TALENs into viral vectors. There are some considerations which control the success of this approach, targeting appropriate sequences with efficient construction of TALENs being crucial factors. We face some obstacles in construction of TALENs; in this study we made a modification to the method of Cermk et al 2011 and added one step to make it easier and increase the availability of constructs.

Application of Direct Analysis Method Considering Initial Imperfection Limitation (초기변형 허용값을 고려한 직접해석법 적용)

  • Kim, Hee Dong
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.5
    • /
    • pp.487-495
    • /
    • 2013
  • As the first step to suggest effective ways of using direct analysis method considering current situations of construction fields in Korea, analytical approach is used to verify direct analysis method which adapts initial imperfection limitation of Korean specification of building construction. The main analytical variables are size of frames, axial load ratio, axial load distribution, value of notional loads, location of notional loads, and applied method of notional loads. The results show that the use of initial imperfection limitation of Korean specification, L/700 is suitable, and the recommendable method to use direct analysis method is applied notional loads based on L/700 as minimum lateral load at each story, even if B2 is less than 1.5 and lateral loads exist.

Prediction of Nonlinear Seismic Response (지진하중에 의한 구조물의 비선형 거동 예측)

  • Kim, Hee Joong
    • Journal of Korean Society of Steel Construction
    • /
    • v.8 no.4 s.29
    • /
    • pp.77-84
    • /
    • 1996
  • The structural members under seismic loading actually show inelastic behavior, so the inelastic responses should be calculated for the seismic design of structures or estimating the structural damage level. Although direct time history analysis may calculate the exact dynamic nonlinear responses for given ground motions, this approach involves a high computational cost and long period. Therefore, it should be developed the approach to estimate nonlinear responses for the practical purpose. The artificial earthquake accelerograms were generated to obtain the smoothed responses spectra, and the samples of generated accelerogram for each seismic event was used to examine average nonlinear response spectra. The stabilized response spectra for each earthquake event was used to evaluate the effects of various yield strength ratios, damping values and nonlinear hysteretic models. The approach, which can simply predict the nonlinear seismic responses of structures, was shown in this study.

  • PDF

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

Image Reconstruction Using 2D M-ch Perfect Reconstruction Filter Bank with Optimized Adaptive interpolation kernel (최적 적응 보간 커널 기반 2차원 M-채널 완전 복원 Filter Bank를 이용한 이미지 재구성)

  • Kim, Jin-Young;Nam, Sang-Won
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.4
    • /
    • pp.795-798
    • /
    • 2007
  • In this paper, we propose an image reconstruction method utilizing an optimized adaptive interpolation kernel along with a 2D M-channel perfect reconstruction filter bank (M-ch PR-FB) structure. In particular, the proposed approach leads to construction of a sharper image than a direct conversion, still preserving high frequency components of the original image through the subband processing of the 2D M-ch PR-FB. Finally, the image quality of the proposed approach is demonstrated by comparing with those of the direct methods using conventional interpolation kernels.