• Title/Summary/Keyword: development projects

Search Result 3,628, Processing Time 0.025 seconds

Factors Affecting the Performance of Agricultural Project from the Perspectives of Agriculture Extension Workers - A Case Study of Malawi - (농촌지도사의 관점에서 본 농촌개발 성과 영향요인 - 말라위 사례 -)

  • Tuchitechi, Hawonga;Lee, Misook
    • Journal of Agricultural Extension & Community Development
    • /
    • v.25 no.2
    • /
    • pp.111-120
    • /
    • 2018
  • This study aims to identify the factors influencing the perofrmance of agricultural projects for small farmers in Malawi. This cross-sectional study was conducted to discover the factors behind the slow performance of agricultural projects in alleviating poverty. The research was conducted in the Karonga and Phalombe Districts in the northern and southern parts of Malawi, respectively. The data were collected through a structured questionnaire survey administered to 82 agriculture extension workers, and a multiple regression analysis was conducted. The results indicated that farmers' socioeconomic factors, including high illiteracy and poverty rates, poor participation regarding project implementation, and high dependency syndrome, significantly affected the performance of agricultural projects. Within the projects them selves, this study discovered that there was no consistent flow of funds. This greatly affected the schedule of project activities, thereby compromising performance. The study recommends that the government and all relevant stakeholders work jointly to alleviate poverty. It is especially important to ensure that smallholder farmers are equipped with self-help capabilities. In addition, it is critical to examine the issues of funding disbursement.

A Study on the Development Demand and Consciousness Investigation to the Rural Village Development Projects of YongDuSan Area in Jecheon City (제천시 용두산권역의 농촌마을종합개발사업에 따른 개발수요 및 의식조사에 관한 연구)

  • Kim, Seung-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.8 no.3
    • /
    • pp.9-16
    • /
    • 2006
  • This study is the YongDuSan area which finished a basic plan of a rural village development projects in 2006 February. Rural village development Projects of YongDuSan area in Jecheon city progressed as follows. It is played by consciousness investigation to the objects with 143 adult man and woman in a region until November 4th from October 28th(for eight days) in 2005. The results of study as follows; First, YongDuSan area and income were mostly contenting themselves in life. This is as there is income through HwangGi, and be as there is a little inconvenience of a life as is located in the city neighboring. Also, prepare the infrastructure which can process a twice and three times through HwangGi businesses, were as an income business they are continuous, and to be stable was possible, and were investigated if done so. The second, local residents were recognizing so that a rural related projects enforcing in the most governments can't affect greatly a life improvement and activation. Therefore, let you understand residents so that these projects are performed by residents, and an educational program and aggressive public information to be able to feel participation consciousness are necessary. The third, Must review a plan to strengthen bisexual a talented person leadership education in order to develop a local ability. And Construction of a system to be able to increase efficiency operating a village and The system that can manage systematically that kind of system is necessary.

  • PDF

A Study on the Revitalization of Digital Contents Industry (디지털콘텐츠 산업육성 사업 구조개편 방안 연구)

  • Jin-Hyeon Chang
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.23 no.5
    • /
    • pp.159-167
    • /
    • 2023
  • Due to the convergence of digital technology and the rapidly changing characteristics of the digital industry, the development projects in each technology field that have been carried out so far have blurred the boundaries of the business, dispersed business effects, and reached the limit in fostering a flexible industry that accommodates technological development. It appears that Therefore, the goal is to support the policy of the digital content development project by suggesting a plan to reorganize the structure and improve the management system of the digital content industry development project to effectively respond to the changing direction of the future digital content industry. Through structural analysis and diagnosis of government supported projects, it was proposed to reorganize the existing 19 key projects and 49 detailed projects into 7 key projects projects and 17 detailed projects. As a plan to improve the project management system, there are too many project implementation agencies and the absence of a general agency for detailed project support management, which limits the promotion of large-scale projects for organic linkage between projects and market creation. To improve this, a general agency that oversees the project management function was selected, and it was suggested that there was a need to unify project management into a general organization to manage the project efficiently.

Development Method's Impact on Function Points in IT Projects - Focused on New Development and Enhancement - (IT프로젝트에서 개발방법이 기능점수에 미치는 영향 - 신규개발과 보강개발을 중심으로 -)

  • Lee, Won-Ho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.4
    • /
    • pp.131-139
    • /
    • 2009
  • The decision makers of IT projects are faced to situations to choose a best development method between inhouse development and solution purchase when companies must develop a new system or enhance the existed system. For those decision makers related to the IT projects, this study provides them with meaningful results through the ISBSG project repositary, how each development method, such as a development inhouse, a solution purchased, a combined method, impact the function point, which is a critical factor to measure the required time, efforts, cost of IT project development.

The Impacts of Requirement Uncertainty and Standardization on Software Project Performance : A Comparison of Korea and USA (요구사항 불확실성과 표준화가 소프트웨어 프로젝트 성과에 미치는 영향 : 한국과 미국의 비교연구)

  • 나관식
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.2
    • /
    • pp.15-27
    • /
    • 2004
  • Most software projects inevitably involve various types and degrees of uncertainty. Without proper risk assessment and coordination, software projects can easily run out of control and consume significant additional resource. Thus, risk management techniques are critical issues to information system researchers. Previous empirical studies of U.S. software firms support the adoption of development standardization and user requirement analysis techniques in risk-based software project management. Using data collected from software projects developed in Korea during 1999-2000, we conduct a comparative study to determine how risk management strategies impact software product and process performance in countries with dissimilar IT capabilities. In addition, we offer an alternative conceptualization of residual performance risk. We show that the use of residual performance risk as an intervening variable is inappropriate in IT developing countries like Korea where the role of late stage risk control remedies are critical. A revised model is proposed that generates more reliable empirical implications for Korean software projects.

  • PDF

Economics Evaluation Model for Information Systems Project (IT 사업의 경제성 평가 모형 설계)

  • Lee, Sangwon;Kim, Sunghyun;Park, Sungbum;Ahn, Hyunsup
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2014.07a
    • /
    • pp.97-98
    • /
    • 2014
  • Lots of investment projects of new development and redevelopment for information systems have been not taken care of in the field of administration and evaluation, for these information systems projects have unique characteristics such as technology sensitiveness, network effectiveness, embeddedness, and externality. In fact, quantitative and qualitative evaluation of investments in information systems projects are not sufficient. It is critically important to generally evaluate benefits of development or operation cost, urgency, external effects, and so on. In addition, the efficient monitoring and effective analysis of information systems are surely needed for beneficient results of investment in information systems. We propose an economics evaluation model for information systems projects.

  • PDF

An Analysis of the Applicability of Technical Risk Index in the Weapons System Research & Development Projects (무기체계 연구개발사업에서 기술적 위험지표 적용 가능성 분석)

  • Lee, Sunhun;Kim, Minjun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.6
    • /
    • pp.835-843
    • /
    • 2017
  • The Technology Readiness Assessment(TRA) has the advantage of identifying immature technologies in promoting weapon system research and development project. However, a more diverse set of information is required for the determination of phase shift and technical risk management for weapons system R&D projects. In this paper, we investigate the various indexes the various indexes proposed to overcome the limitations of the Technology Readiness Level(TRL) and analyze the possibility of applying to the actual weapons system R&D projects. Based on the analysis, it was possible to provide additional information that could not be presented in TRA using technical risk indexes other than TRL, confirming that it could be used for technical risk management for weapons system R&D projects.

Trend Analysis of Development Projects in Gyeonggi Province - Focusing on the Target Projects of Environmental Impact Assessment - (경기도 개발사업의 추이 분석 - 환경영향평가 대상사업을 중심으로 -)

  • Kim, Su-Ryeon;Sung, Hyun-Chan
    • Journal of Environmental Impact Assessment
    • /
    • v.25 no.1
    • /
    • pp.15-24
    • /
    • 2016
  • This study was analyzed the distribution tendencies and statuses of development projects for EIA projects. According to the result of this study, in the annual analysis, a number of consultations and areas have shown increasing trend across the board. In the project type analysis, there are development project types; urban development, industrial complex, sport facility installation, resort complex development, road construction, which have a lot of developments. In the cities analysis, a number of consultations were about 53% on the top 5 cities, the areas were focused on 75%, and the development projects were concentrated in the southern distribution of Gyeong-gi province. The development axis, from 2004 to 2006, was C-type, but it was extended to O-type until 2010. Therefore, the development will expand into nature conservation zones and forest areas to the east. The development restriction area will be disappeared gradually because the development density of the surrounding Seoul city is more advanced, and we could predict that may be accelerated conurbation between the neighboring cities. Thus, when the development project is located, it would be reviewed difference in existing development project type, project size, and concentration in each city on the basis of environmental capacity.

An Option Pricing Model for the Natural Resource Development Projects (해외자원개발사업 평가를 위한 옵션가격 결정모형 연구)

  • Lee, In-Suk;Heo, Eunnyeong
    • Environmental and Resource Economics Review
    • /
    • v.13 no.4
    • /
    • pp.735-761
    • /
    • 2004
  • As a possible alternative to Traditional Discounted Cash Flow Method, "Option Pricing Model" has drawn academic attentions for the last a few decades. However, it has failed to replace traditional DCF method practically due to its mathematical complexity. This paper introduces an option pricing valuation model specifically adjusted for the natural resource development projects. We add market information and industry-specific features into the model so that the model remains objective as well as realistic after the adjustment. The following two features of natural resource development projects take central parts in model construction; product price is a unique source of cash flow's uncertainty, and the projects have cost structure from capital-intense industry, in which initial capital cost takes most part of total cost during the projects. To improve the adaptability of Option Pricing Model specifically to the natural resource development projects, we use Two-Factor Model and Long-term Asset Model for the analysis. Although the model introduced in this paper is still simple and reflects limited reality, we expect an improvement in applicability of option pricing method for the evaluation of natural resource development projects can be made through the process taken in this paper.

  • PDF

A study on the Feasibility Analysis factor Model for Housing Development Projects (주택개발사업의 사업성분석인자 모델에 관한 연구;사업성 분석인자의 중요도 분석 및 타당성 검증을 증심으로)

  • Hong, Yeong-Geon;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.249-254
    • /
    • 2007
  • The main bodies of housing markets of today need to carry out a systematic and objective feasibility analysis even from the step of planning in order to succeed in a diverse and complex market environment. Therefore, it is meaningful to understand this housing market environment and propose a necessary model for the feasibility analysis of hosing business. In this vein, the aim of this study was to extract an actual and practical feasibility analysis factor and its importance for housing market, and then present and apply a feasibility analysis factor model to an on-site example, in order to verify the model's validity. For this, the investigator interviewed with and carried out a questionnaire survey of experts in housing development projects. Study findings are as follows:First, the feasibility analysis factor, derived in this study, could provide a ground to evaluate the feasibility of subject projects in the planning of development through an analysis index. Second, when feasibility is under the level of carrying out the projects, it is possible to reexamine the projects through extracting analysis factors of which points are under the standard and via a feedback process for improvable analysis factors. Therefore, the result of applying the feasibility analysis model of this study to actual housing development projects analytically shows that the model could provide a practical evaluation criterion to the person in charge of project development through an analysis index.

  • PDF