The Investigation and Performance Assessment of the Design-Build Projects in Korea (국내 턴키/대안공사 실태조사를 통한 턴키/대안 입찰제도의 성과 분석)

  • Kim Sun-Hee;Kim Du Yeon;Park Sang Hyuk;Yeom Sang Min;Chae Myung Jin;Han Seung Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.462-467
    • /
    • 2004
  • Design-build, which is defined as single source responsibility for design and construction, has been widely used in large public works since governmental formulation of measure for encouraging use of design-build in 1996. However, civic groups and small and medium sized enterprises are highlighting over-competition and unbalanced market shares of conglomerate in domestic design-bid market and insisting on decrease in the use of design-build and absorption into the lowest-price bidding. This study collected information about cost, schedule, quality, new technology adoption from 51 civil design-build projects and measured their performance.

  • PDF

An Application of Value Engineering to Design-Build Projects at Design Development Phase (설계${\cdot}$시공일괄 사업의 실시설계단계 VE적용 방안에 관한 연구)

  • Jung Jae-Jin;Kim Jae-Hyun;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.294-298
    • /
    • 2003
  • Recently, Design-build project as delivery system public construction sector tends to be increased according to the Masterplan for promotion of construction technologies, and construction projects are increasing their complexity, variety and scale. And owner's requirements become various. Preliminary design for design eligibility judging of design-build has been designed excessively to get a good point and this tendency includes the elements which is capable of wasting the budget. Because of excessive design, owners require to apply VE study into the design development phase but in the Design-build system, VE application has not been of no effect that owners expect, owing to the characters of lum-sum contracts. The purpose of this study is to propose the plan for effective application of VE in the design development phase in order to solve the problems such as excessive design of preliminary design in the design-build project. This study established plans for VE application through investigating and analyzing VE application case and then proposed the applications in the aspect of regulations and contracts, parties participated in project, VE operation through research for verification of usefulness.

  • PDF

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

A comparative study of design guidelines for the decentralized rainwater management of apartment house (분산식 빗물관리를 위한 공동주택 외부공간 설계지침 연구)

  • Moon, Soo-young;Kim, Hyeon-soo;Lee, Keon-ho;Jang, Dae-hee
    • KIEAE Journal
    • /
    • v.6 no.3
    • /
    • pp.3-10
    • /
    • 2006
  • As environmental problems and water-shortage phenomenon become a global issue, many states look for the effective method to use water resources. So, decentralized rainwater management is recognized as a new water management system that rainwater can be infiltrated and used on-site. But it is little difficult to build a park, lake, and forest for evaporating rainwater in city because the land price of city is very high. In order to build an excellent infiltration system for a dwelling and a park in Korea, KICT has developed Linear infiltration system. This infiltration system is consist of first flush treatment, storage and infiltration, overflow control system. These elements are connected closely and working as a combined system. A storm sewer can be changed by the linear infiltration system. This study is to make design guideline using Linear infiltration system in apartment house. So ATV-DVWK-M13, FLL and present condition of Korean rainwater system were analyzed and the guidelines direction were set up. Through this study, a foundation is prepared to build the decentralized rainwater management of apartment house.

Implementation of Concurrent Engineering for Large Assembly Design: Part(II) -Developmen of a Digital Mock-Up System for Reducin Design Changes- (부품수가 많은 조립체 설계를 위한 동시공학의 구현: Part (II) -설계 변경을 줄이기 위한 Digital Mocj-Up 시스템의 개발-)

  • 정융호
    • Korean Journal of Computational Design and Engineering
    • /
    • v.2 no.2
    • /
    • pp.103-110
    • /
    • 1997
  • In the development of large complex assembly, most design changes are from the following reasons.: 1) insufficient consideration of assembling sequence of downstream process. 2) interference and fit-up of related parts. 3) initial design changes which are not completely resolved. In order to reduce the first reason of above, the assembly-centric modeling methodology was proposed in the part (1) of the thesis. In this part (2), a Digital Mock-Up system, which is a tool to build a virtual mock-up in design stage, has been developed in order to prevent the other two reasons. The system can build a virtual assembly in various ways as followings.: 1) assembling parts which are located in user defined envelope. 2) assembling parts with the specified disciplines. 3) assembling parts that are selected in the part list. It can also make an assembly by the combination of above methods. In addition to that, it has the functions to read/write the virtual assembly and to explode parts of the assembly in desired direction. With the virtual assembly, engineers can design interference free parts without making physical mock-up. The system has been implemented with Oracle database management system in CATIA environment.

  • PDF

A Design Process of Digital System in Polymachine Image (복합 기계 상에 의한 디지탈 시스템의 일반계 과정)

  • 김현재
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.19 no.6
    • /
    • pp.9-16
    • /
    • 1982
  • This is an introduction to an art of digital hardware design using polymachine image as a target structure of the product. As in the case of software design of a computer, the design process begins with a sketch of planned system in flow chart description and the flow charts is partitioned into divergent elements. Each of the element machine is derived from those divergent elements. We can build a complete digital system with the preparation of an index, and a polymer of these element machines.

  • PDF

DEFORMED BUILDING DESIGN AND FABRICATION BASED ON THE PARAMETRIC TECHNOLOGY

  • Eonyong Kim;Jongjin Park;Hanjong Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1107-1112
    • /
    • 2009
  • To design and build a deformed building, new approaches and technologies are required, in which a design approach with parametric and generative technology is used for design and for building it, computer based fabrication technology. Even if parametric design technology is not a state of the art thing, the technology is still used widely, in order to effect the efficiency and furthermore it will continue to be innovated upon continuously. To cope with the limitation of it, the generative design system is developed. Deformed building design requires new methodology to overcome the limitations of conventional ways, which have difficulties to create enough design alternatives to explore satisfied design solutions order to deformed design have geometrical complexity and dramatically increased amount of data. Hence the generative design system can be a cutting edge methodology to solve it. However we should consider how to build the design in the real world. For this, the computer based fabrication technology which is used in mechanical industry is required to introduce to architecture and construction domain for efficiency. In this research, the methodology is modeled and tested with Bezier surface based shell structure.

  • PDF

Optimum Radial Build of a Low Aspect Ratio Tokamak Reactor

  • Hong, B.G.;Hwang, Y.S.;Kang, J.S.
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2011.02a
    • /
    • pp.397-397
    • /
    • 2011
  • In a low aspect ratio (LAR) tokamak reactor with a superconducting toroidal field (TF) coil, the radial build of TF coil and the shield play a key role in determining the size of a reactor. For self-consistent determination of the reactor components and physics parameters, a system analysis code is coupled with one-dimensional radiation transport code. Conceptual design study of a compact superconducting LAR tokamak reactor with aspect ratio less than 2.5 was conducted and the optimum radial build was identified. It is shown that the use of an improved shielding material and high temperature superconducting magnets with high critical current density opens up the possibility of a fusion power plant with compact size and small re-circulating power simultaneously at low aspect ratio, and that by using an inboard neutron reflector instead of breeding blanket, tritium self-sufficiency is possible with outboard blanket only and thus compact sized reactor is viable.

  • PDF

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.