The Korea South-East Power Co., Ltd.(KOSEP) held a design competition for Energy Theme Park at Yeong-Heung power plant in October, 2004. The site is located in 980-1 Oe-ri, Yeong-Heung myun, OngJin gun, Incheon City and has an area of $54,450m^2$. Design objectives of KOSEP were to make environmentally sustainable space, to build a symbolic and gathering place for community members and visitors, to make a tourist spot of Yeong-Heung Island linked with adjacent sight spots in OngJin gun, and to elevate an identity and status of the KOSEP by creating a landscape correspondent to the concept of the building design. The spatial concept of this project was developed by expressing a circular course of energy, named 'energy circle' and accounting for principles of energy generation. By interpreting 'energy circle' and principles of energy generation, and applying it to the site, the design met the various desires of the KOSEP. This design consists of seven theme spaces; the future energy plaza, the wind plaza, the light plaza, the thermal power plaza, a water strider dam, a ecological pond and the stratum plaza. These theme spaces are consecutively placed along the circular path which surrounds the public information building and to represent how power plants generate energy in each space and diverse design techniques and special effects are used.
In order to solve the current shortage of parking spaces, and redesign the main gate area of the U University, the research investigated some cases of other schools located in Seoul which actively constructed multi-purpose building structures. Those schools are considered to be good samples showing their efforts to fulfill the needs of more parking spaces in their campuses, and to cover with the growing needs of multi-functioned facilities accommodating services of academic affairs, reading room spaces, and amenities. With the investigation, the research finded out the current trends of campus developments from the sample schools, such as underground parking facilities connected with multi-purpose buildings along the main arteries of campuses. Following the trends the research thoroughly examined the present conditions of our school and tried to make some possible alternatives for the facilities. Under the conditions, the research suggested 1)to construct underground parking lots accepting around 1,000 cars under the ivory tower square located in front of University Administration Building, 2)to develop a big-scaled open square at the university main gate, and 3)to build a multi-purpose structure along the main street of the campus, which included administration services, studying spaces, and some commercial facilities.
The west express way which links south west area of the central city of Seoul has been notorious for extremely heavy traffics since its first opening in 1991(i.e. the average vehicle speed is less than 25km/h, a daily traffic is 112,000 and among them, more than 94% of the vehicles are the light vehicles). The city government recently initiated a new BTO(Build-Transfer-Operate) project as an alternative in releasing heavy traffic and a high construction cost. The proposed underground express road is the first double-level tunnel (i.e. a total length of road is 10,91km and the tunnel is 9.308km long) ever built in South Korea, while such tunnel system is not new worldwide as such A86 East tunnel in France, SMART tunnel in Malaysia, and Fuxing tunnel in China. This paper discusses major design issues regarding the internal structures such as deck slab, and secondary liner.
This paper presents the design concept and operation results of float-off for FSO (340,000 DWT Class, ELF AMENAM KPONO Project) built on the ground, without dry dock facilities. It was the first attempt to build FSO, completely, on the ground and launch it using DBU (Double Barge Unit, which was connected by rigid frame structure.) The major characteristics of FSO, which are similar to general VLCC type hull, including topside structure, weigh 51,000 metric ton. In order to have sufficient stability during the deck immersion of DBU, while passing through a minimum water plane area zone, proper trim control was completed with LMC (Load Master Computer). The major features of the monitoring system include calculation for transverse bending moment, shear force, local strength check of each connector, based on component stress, and deformation check during the load-out and float-off. Another major concern during the operation was to avoid damages at the bottom and sides of FSO, due to motion & movement after free-floating; therefore, adequate clearances between DBU and FSO were to be provided, and guide posts were installed to prevent side damage of the DBU casings. This paper also presents various measures that indecate the connector bending moment, damage stability analysis, and mooring of DBU during float off.
본 논문은 영국 중동부지역의 고성장기업 육성을 위한 지원체계 구축과 성장기업 오너들의 리더쉽 함양과 기업경영을 보다 효과적으로 운영할 수 있도록 지속적으로 지원할 수 있는 조직운영체계를 분석하는데 목적을 두었다. 이러한 지원체계는 고성장기업들간의 상호협력 인적 네트워크를 통하여 활발하게 운영될 수 있다. 따라서 본 연구에서는 고성장기업육성 프로그램의 기존문헌조사 연구들과 정책지원 수요조사를 바탕으로 하여 맞춤형 기업서비스 프로그램을 개발하고 지원하며 이를 실행하는데 있어서 나아갈 정책프레임을 제시하고자 한다.
As the national interest in sports has been increased over time, sports facilities and sports complex are considered more than just physical environments for training athletes or watching games. Sports facilities now become symbolic spatial devices to represent the national and cultural pride of any countries. The existing national training camp located in Taenung, Seoul is gotting outdated and degraded. The polluted air in the city risks athletes' health condition. The government planned to construct the second training camp at Jincheon, Chungbuk at the area of $2,171,910m^2$. The Korea Sports Council called for proposals to envision the future training camp, and they held a design competition from August to November, 2005. The first phase was to present the masterplan for the entire site including training buildings, outdoor training facilities, dormitories, a visitor center, a research center, education and administration buildings. Considering the size of the site, the planning process required a strong relationship between landscape and architecture. This study tries to provide general explanations on the winning proposal focused on the landscape-related issues. It also attempts to have reference points for contemporary planning and design issues to situate the project in the stream of continuing design effort to avoid the dichotomy between nature and culture. The landscape proposal for the new national taming camp suggests four main strategies; 1) The camp has two intersecting and interweaving parks which represent the natural and urban order. 2) The entire site is organized and networked by the flow of landscape called landscape ribbon in terms of topography, vegetation, and water flow. 3) The landscape is choreographed through the time and process. 4) The ecological process and the digital contents are juxtaposed in the landscape. This winning proposal is the first step to portray the national vision for the sustainable environment coexisting with sports industry. Landscape in this proposal is an active agent to network various parts of the site which enables landscape to be infrastructure. Landscape design in this proposal should be considered open-ended strategies rather than determined concrete forms and its engaging further development will be tested in following Design-Build phase.
As project opportunities for the Architecture, Engineering and Construction (AEC) industry have grown more complex and larger, the utilization of Building Information Modeling (BIM) technologies for three-dimensional (3D) design and simulation practices has been increasing significantly; the typical applications of the BIM technologies include clash detection and design alternative based on 3D planning, which have been expanded over to the technology of construction management in the AEC industry for virtual design and construction. As for now, commercial BIM software has been operated under a single-user environment, which is why initial costs for its introduction are very high. Cloud computing, one of the most promising next-generation Internet technologies, enables simple Internet devices to use services and resources provided with BIM software. Recently in Korea, studies to link between BIM and cloud computing technologies have been directed toward saving costs to build BIM-related infrastructure, and providing various BIM services for small- and medium-sized enterprises (SMEs). This study addressed development of the usage metering functions of BIM software under cloud computing architecture in order to archive and use BIM data and create an optimal revenue structure so that the BIM services may grow spontaneously, considering a demand for cloud resources. For the reason, we surveyed relevant cases, and then analyzed needs and requirements from AEC industry. Based on the relevant cases, customizing for cloud BIM and design for the development was performed. We also surveyed any related-law to support cloud computing-based BIM service. Finally, we proposed herein how to optimally design and develop the usage metering functions of cloud BIM software.
Purpose- The purpose of this study is to increase the effect of public technology transfer through government R&D support to secure the competitiveness of public technology startups. The government's R&D budget in 2019 is over 20 trillion won, and there is a legitimate need to increase the performance of technology startups through such R&D results. Research design, data, and methodology- In this paper, we comprehensively analyzed the current status of public research institutes and R&D support projects suitable for founders and analyzed and presented cases of follow-up research conducted by the Institute of Science and Technology Jobs to analyze actual performance cases of R&D support institutes. Results- In this conclusion, a developmental model of public technology entrepreneurship was proposed to increase the performance of public technology commercialization with the scalability of research institutions. In order to create a public technology information system between consumers and suppliers, a Steinweiss-type technology commercialization model for public technology commercialization, and a job-creating enterprise-type linkage R&D support business model were presented to create the results of R&D support organizations. Conclusions- Through the results of this study, it is meaningful to analyze the performance cases of technology commercialization of R&D support institutions, which have not been studied so far, to build competitiveness of research institutions and to present a growth model for the spread of technology startups. This study has implications in terms of suggesting a way to build competitiveness in technology commercialization between market demanders and suppliers by linking existing public technology startups, which deviated from the simple commercialization support system, with job creation by expanding the R&D support system.
최근 해외건설시장에서는 산업설비 분야를 중심으로 기획, 설계, 구매조달, 시공을 통합하는 EPC(Engineering, Procurement, & Construction) 형태의 발주물량이 증가하고 있으며, 토목산업 분야에서도 점차 Design-Build 발주사례가 증가하고 있다. 이러한 발주환경의 변화에 따라 프로젝트종합관리, 기본설계 등 건설엔지니어링의 중요성이 대두되고 있으나, 아직까지 국내 건설산업은 시공 위주의 산업구조에서 벗어나지 못하고 있다. 따라서 본 연구는 국내 토목산업의 엔지니어링 역량을 제고하고, 장기적으로는 설계-시공 균형발전을 위한 산업 차원의 발전방안을 제시하는데 목적을 두고 진행되었다. 이를 위해 우선 국내외 건설산업 현황을 분석하였으며, 국내 건설업체들의 인식수준 및 니즈 파악을 위한 설문조사와 발전방안의 실효성 검토를 위한 전문가 심층면담을 순차적으로 진행하였다. 본 연구에서 도출한 국내 토목산업의 설계-시공 균형발전 방안은 1) 토목설계업 관리체계 효율화, 2) 토목설계업 관련 제도 선진화, 3) 고부가가치 우수인력 육성, 4) 엔지니어링조합 및 컨소시엄 구성, 5) 해외건설 협력기구 조직 및 운영으로 구분하여 제시되었다.
Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.