Journal of The Korean Society of Agricultural Engineers
/
v.64
no.2
/
pp.47-55
/
2022
The objective of this study was to analyze the effect of the duration and time distribution of probability rainfall on farmland inundation for the paddy fields in the drainage improvement project site. In this study, eight drainage improvement project sites were selected for inundation modeling. Hourly rainfall data were collected, and 20- and 30-year frequency probability rainfalls were estimated for 14 different durations. Probability rainfalls were distributed using Intensity-Duration-Frequency (IDF) and Huff time distribution methods. Design floods were calculated for 48 hr and critical duration, and IDF time distribution and Huff time distribution were used for 48 hr duration and critical duration, respectively. Inundation modeling was carried out for each study district using 48 hr and critical duration rainfalls. The result showed that six of the eight districts had a larger flood discharge using the method of applying critical duration and Huff distribution. The results of inundation depth analysis showed similar trends to those of design flood calculations. However, the inundation durations showed different tendencies from the inundation depth. The IDF time distribution is a distribution in which most of the rainfall is concentrated at the beginning of rainfall, and the theoretical background is unclear. It is considered desirable to apply critical duration and Huff time distribution to agricultural production infrastructure design standards in consideration of uniformity with other design standards such as flood calculation standard guidelines.
In order to construct a dam, the diversion facility such as cofferdam and a diversion tunnel should be installed in advance. And size of a cofferdam depends on type of a main dam. According to the Korea Dam Design Standard, if the main dam is a concrete dam, design flood of the cofferdam is 1~2 years flood frequency. This means that overflow of the cofferdam occurs one time for 1 or 2 years, therefore, stability of the cofferdam should be secured against any overflow problem. In this study, failure probability analysis for the concrete cofferdam is performed considering the overflow. First of all, limit state function of the concrete cofferdam is defined for overturning, sliding and base pressure, and upstream water levels are set as El. 501 m, El. 503 m, El. 505 m, El. 507 m. Also, after literature investigation research, probabilistic characteristics of various random variables are determined, the failure probability of the concrete cofferdam is calculated using the Monte Carlo Simulation. As a result of the analysis, when the upstream water level rises, it means overflow, the failure probability increases rapidly. In particular, the failure probability is largest in case of flood loading condition. It is considered that the high upstream water level causes increase of the upstream water pressure and the uplift pressure on the foundation. In addition, among the overturning, the sliding and the base pressure, the overturing is the major cause for the cofferdam failure considering the overflow.
Magazine of the Korean Society of Agricultural Engineers
/
v.39
no.3
/
pp.83-95
/
1997
This study was conducted to derive optimal design floods by Gamma distribution models of the annual maximum series at eight watersheds along Geum , Yeong San and Seom Jin river Systems, Design floods obtained by different methods for evaluation of parameters and for plotting positions in the Gamma distribution models were compared by the relative mean errors and graphical fit along with 95% confidence interval plotted on Gamma probability paper. The results were analyzed and summarized as follows. 1.Adequacy for the analysis of flood flow data used in this study was confirmed by the tests of Independence, Homogeneity and detection of Outliers. 2.Basic statistics and parameters were calculated by Gamma distribution models using Methods of Moments and Maximum Likelihood. 3.It was found that design floods derived by the method of maximum likelihood and Hazen plotting position formular of two parameter Gamma distribution are much closer to those of the observed data in comparison with those obtained by other methods for parameters and for plotting positions from the viewpoint of relative mean errors. 4.Reliability of derived design floods by both maximum likelihood and method of moments with two parameter Gamma distribution was acknowledged within 95% confidence interval.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
1999.10c
/
pp.479-485
/
1999
This study was conducted to derived design floods by Generalized Extreme Value(GEV) distributiion for the annual maximum series at ten watersheds along Han, Nagdong, Geum , Yeongsan and Seomjin river systems. Adequency for the analysis of flood data used in this study was established by the test of Independence, Homogeneity , detection of Outliers. Coefficient of variation , skewness and kurtosis were calculated by the L-Moment, and LH-Moment ratio respectively. Parameters were estimated by the Method of L-Method of LH-Moment. Design floods obtained by Method of L-Moments and LH-Moments using different methods for plotting positions in GEV distributions and were compared with those obatined using the Method of L-Moments and LH-Moments by the Relative Mean Errors and Realtive Absoulte Errors. It was found that desgin floods derived by the method of L-Moments and LH-Moments using Cunnane plotting position foumula in the GEV distribution are much closer to those of the observed data in comparison with those obtained by methods of L-moments and LH-moments using the other formula for poltting postions from the viewpoint of Relative Mean Errors and Relative Absoulte Errors. In view of the fact that hydraulic structures indcluding dams and levees are generally usiong design floods with the return period of two hundred years or so, design floods derived by LH-Moments are seemed to be more reasonable than those of L-Moments in the GEV distribution.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.9
/
pp.238-250
/
2020
This study investigated the long-term measures to minimize flood damage in the event of flooding in urban areas. The relationship between urban spatial factors and the impact of flood damage was analyzed, focusing on non-structural measures. The urban spatial factors were categorized into three parts: open space, disaster prevention facilities, and urbanization sectors. Multiple regression analysis was used to investigate how urban spatial factors influence flood damage. As a result of the analysis, the crucial factors, such as the reduced green areas and parks included in the open space sectors, resulted in an increased flood damage potential. The posterior factors, such as the population density and GRDP included in the urbanization sector concurrently led to an increase in the flood damage potential. Therefore, to better adapt to climate change, it is necessary to establish urban spatial plans strategically, such as green areas and parks. Meanwhile, the population density and GRDP are also the main factors causing flood damage. Therefore, when used appropriately in terms of resilience, it will serve as adaptations and recovery.
Seo, Il Won;Kim, Sung Eun;Minoura, Yasuhisa;Ishikawa, Tadaharu
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.6B
/
pp.515-522
/
2011
The hydrodynamic models are widely used in the research for analysis of flow characteristics and design of hydraulic structure and river channel. These models need to be calibrated with observed data. But, there are few field data of two-dimensional flow velocity in flood because the direct measurement of the flood flow velocity are very dangerous. For this reason the results of two-dimensional numerical models are usually calibrated and verified with only a few observed data. Moreover, the verification of numerical models for the design flood is usually carried out using the result of one-dimensional model, HEC-RAS. In this study, using the flow velocity profile extracted from the aerial photos of a flood of the Tone River in Japan, two-dimensional numerical models, RAM2 in RAMS, RMA2 in SMS, and one-dimensional numerical model, HEC-RAS which are most widely used in research and design work are verified and the validity for verification of two-dimensional models with HEC-RAS is reviewed. The results showed that the water surface elevation of HEC-RAS, RAM2 and RMA2 models have similar results with observed data. But, the velocity results of RAM2 and RMA2 models in the floodplain have some difference with the velocity from aerial photo analysis. And the velocity result of HEC-RAS has big difference with the sectional averaged value of velocity from aerial photo analysis.
In Korea, torrential rain frequency and intensity have surged over the past five years (2019-2023), breaking rainfall records. Due to insufficient observation facilities for rainfall and runoff data in small mountainous catchments, preparing for unexpected floods is challenging. This study examines the Bidogyo catchment in Goesan-gun, Chungcheongbuk-do, comparing design flood discharge calculated with optimized parameters versus standard guidelines. Using HEC-HMS and Q-GIS for model construction, five rainfall events were analyzed with data from the National Water Resources Management Information System. The time of concentration (Tc) and storage constant (K) were calculated using the Seokyeongdae formula and model optimization. Results showed that optimized parameters produced higher objective function values for flood events. The design flood discharge varied by -10.7% to 17.3% from the standard guidelines when using optimized parameters. Moreover, optimized parameters yielded flood discharges closer to observed values, highlighting limitations of the Seokyeongdae formula for all catchments. Further research aims to develop suitable parameter estimation methods for small mountainous catchments in Korea.
Magazine of the Korean Society of Agricultural Engineers
/
v.37
no.5
/
pp.111-118
/
1995
첨두유량이 연속적으로 발생하므로 인하여 수리구조물의 파괴에 영향을 끼치는 설계홍수량의 추정을 위해 본 연구에서는 제I보에 이어 2차적으로 부분 기간 계열인 금강, 영산강 및 섬진강 수계 6개 유역의 비년 초과치를 중심으로 하여 변환법인 SMEMAX법, 멱변화(Power Transformation) 및 2단계 멱변환(Two Step Power Transformation, TSPT)법에 의해 빈도분포의 정규화를 시도하고 이들에 대한 정규화 효율성의 비교분석과 설계홍수량 유도를 위한 변환법별 적합도 검정을 수행하였다. 왜곡분포의 정규화 시도는 제I보의 결과와 마찬가지로 SMAMAX 및 Power변환법에서는 빈도분포의 정규화가 미흡하였으나 2단계 멱변환법에서는 빈도분포의 만족한 정규화를 기할 수 있었다. 또한 3개 변환법에 의해 유도된 설계홍수량의 비교 분석에서는 3개 방법 모두 재현기간 20년 이내의 설계홍수량이 거의 유사한 결과를 나타내었으며 Kolmogorov-Smirnov Test에 의한 3개 변환법별 적합도검정 결과 2단계 멱변환법이 적정 변환법으로 인정되었다.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2001.10a
/
pp.310-313
/
2001
This study was conducted to derive optimal design floods by Gumbel, GEV, GLO and GPA distributions for the annual maximum series at sixteen watersheds. Adequacy for the analysis of flood data used in This study was established by the tests of Independence, Homogeneity, detection of Outliers. Parameters were estimated by the Methods of L, L1 and L2-moments. Design floods obtained by Methods of L, L1 and L2-moments using Gringorten methods for plotting positions in GEV distribution were compared by the Relative Mean Errors and Relative Absolute Errors.
Magazine of the Korean Society of Agricultural Engineers
/
v.27
no.2
/
pp.23-37
/
1985
This studies were carried out to get characteristics of frequency distribution, probable flood flows according to the return periods, and the correlation between return periods and those length of records affect the Risk of failure in the annual maximum series of the main river systems in Korea. Especially, Risk analysis according to the levels were emphasized in relation to the design frequency factors for the different watersheds. Twelve watersheds along Han, Geum, Nak Dong, Yeong San and Seom Jin river basin were selected as studying basins. The results were analyzed and summarized as follows. 1. Type 1 extremal distribution was newly confirmed as a good fitted distribution at selected watersheds along Geum and Yeong San river basin. Three parameter lognormal Seom Jin river basin. Consequently, characteristics of frequency distribution for the extreme value series could be changed in connection with the watershed location even the same river system judging from the results so far obtained by author. 2. Evaluation of parameters for Type 1 extremal and three parameter lognormal distribution based on the method of moment by using an electronic computer. 3. Formulas for the probable flood flows were derived for the three parameter lognormal and Type 1 extremal distribution. 4. Equations for the risk to failure could be simplified as $\frac{n}{N+n}$ and $\frac{n}{T}$ under the condition of non-parametric method and the longer return period than the life of project, respectively. 5. Formulas for the return periods in relation to frequency factors were derived by the least square method for the three parameter lognormal and Type 1 extremal distribution. 6. The more the length of records, the lesser the risk of failure, and it was appeared that the risk of failure was increasing in propotion to the length of return periods even same length of records. 7. Empirical formulas for design frequency factors were derived from under the condition of the return periods identify with the life of Hydraulic structure in relation to the risk level. 8. Design frequency factor was appeared to be increased in propotion to the return periods while it is in inverse proportion to the levels of the risk of failure. 9. Derivation of design flood including the risk of failure could be accomplished by using of emprical formulas for the design frequency factor for each watershed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.