• Title/Summary/Keyword: design control sediment discharge

Search Result 5, Processing Time 0.02 seconds

Estimation of Sediment Discharge Controlled by Sediment-filled Check-dam in a Forested Catchment (산림유역의 만사 사방댐에 의한 토사유출 조절 효과 추정)

  • Seo, Jung Il;Chun, Kun Woo;Song, Dong Geun
    • Journal of Korean Society of Forest Science
    • /
    • v.105 no.3
    • /
    • pp.321-329
    • /
    • 2016
  • To estimate the sediment discharge controlled by sediment-filled check-dam and thereby enhancing factor for check-dam design and dredging criteria, we surveyed slope failures and stream-bed fluctuation caused by geomorphic disturbances (i.e., landslides and debris flows) in Inje, Gangwondo. In general, check-dams play roles for restraining and controlling sediment discharge within a section under the design equilibrium gradient and a section under the design flood gradient, respectively. The results in this study showed same pattern: that is, the closed type check-dam, which has a design restraint sediment discharge of $2,111m^3$, estimated to control a sediment discharge of $3,996m^3$ in the stream section within 250 m right upper area immediately after the disturbances occurred in 2006. As a result, a design control sediment discharge of the check-dam was larger than its design restraint sediment discharge. This represents that the check-dam is still having an own function for controlling sediment discharge although it exceeded the designed capacity by the sediment discharged from upstream during the disturbances. Our finding suggests that the sediment discharge controlling of check-dam may need to be evaluated separately from its sediment discharge restraint. Currently, the country, however, does not consider the design control (or restraint) sediment discharges, based on the actual field survey, as criteria for check-dam design and/or dredging work. Therefore, the accumulation of the quantitative data is required to support that check-dam has functions for both restraining and controlling sediment discharge. This would be a way to develop our erosion control technology to the scientific technology equipped with a more objective and systematic aspects.

Prediction of total sediment load: A case study of Wadi Arbaat in eastern Sudan

  • Aldrees, Ali;Bakheit, Abubakr Taha;Assilzadeh, Hamid
    • Smart Structures and Systems
    • /
    • v.26 no.6
    • /
    • pp.781-796
    • /
    • 2020
  • Prediction of total sediment load is essential in an extensive range of problems such as the design of the dead volume of dams, design of stable channels, sediment transport in the rivers, calculation of bridge piers degradation, prediction of sand and gravel mining effects on river-bed equilibrium, determination of the environmental impacts and dredging necessities. This paper is aimed to investigate and predict the total sediment load of the Wadi Arbaat in Eastern Sudan. The study was estimated the sediment load by separate total sediment load into bedload and Suspended Load (SL), independently. Although the sediment records are not sufficient to construct the discharge-sediment yield relationship and Sediment Rating Curve (SRC), the total sediment loads were predicted based on the discharge and Suspended Sediment Concentration (SSC). The turbidity data NTU in water quality has been used for prediction of the SSC in the estimation of suspended Sediment Yield (SY) transport of Wadi Arbaat. The sediment curves can be used for the estimation of the suspended SYs from the watershed area. The amount of information available for Khor Arbaat case study on sediment is poor data. However, the total sediment load is essential for the optimal control of the sediment transport on Khor Arbaat sediment and the protection of the dams on the upper gate area. The results show that the proposed model is found to be considered adequate to predict the total sediment load.

Numerical Analysis for Bed Changes in the Upstream Channel due to the Installation of Sediment Release Openings in the Flood Control Dam (홍수조절댐에서의 배사관 설치에 따른 상류 하천의 하상변동에 관한 수치모의 연구)

  • Ji, Un;Son, Kwang-Ik;Kim, Mun-Mo
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.4
    • /
    • pp.319-329
    • /
    • 2009
  • Sediment release openings or pipes are installed in the flood control dam constructed to reduce flood damages, which are to allow water and sediments pass through the dam and to prevent flow blockage and sedimentation in the upstream area of the dam. The Hantan River Flood Control Dam (HRFCD) has been projected for flood damage reduction and sediment release openings and ecological passages are considered for the dam design. In this study, sediment deposition due to the construction of HRFCD was analyzed using the HEC-6 model and compared with the state before the dam construction with respect to the conditions of the annual mean daily discharge and annual discharge hydrograph. According to the numerical results, although downstream water levels were changed by the dam structure, the effects of bed changes were not propagated from the dam over 2 km upstream. Also, 2D numerical models of RMA2 and SED2D were used to predict bed changes in the upstream area with and without sediment release openings. Consequently, it is presented that sediment release openings decreased maximum deposition height in the upstream channel of the dam.

Conceptual Design of Mechanical System for Recovery of Seabed-Deposited Hazardous and Noxious Substances Based on Performance Requirements (해저침적 HNS 회수용 기계장치의 성능요건 기반 개념설계)

  • Hwang, Ho-Jin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.26 no.6
    • /
    • pp.689-697
    • /
    • 2020
  • Hazardous and noxious substances (HNS) may cause maritime incidents during marine transportation, which are liable to lead to a large amount of spillage or discharge into the sea. The damage to the marine environment caused by the HNS spill or discharge is known to be much greater than the damage caused by oil spill. Particularly dangerous is HNS, which is deposited or buried in the seabed, as it can damage the organisms that live on, in, and near the bottom of the sea, the so-called "benthos," forming the benthic ecosystem. Therefore, it is vital that the HNS deposited on the seabed be recovered. In order to do so, procedures and equipment are required for accurate detection, stabilization treatment, and recovery of HNS in subsea sediment. Thus, when developing a mechanical recovery system, the performance requirements should be selected using performance indices, and the conceptual design of the mechanical recovery system should be based on performance requirements decided upon and selected in advance. Therefore, this study was conducted to arrive at a conceptual design for a mechanical recovery system for the recovery of HNS deposited on the seabed. In the design of the system, based on the fundamental scenario, the method of suction foundation with the function of self enclosing was adopted for recovering the HNS sediment in the subsea sediment. The mechanical recovery system comprises the suction foundation, pollution prevention, a pump system, control system, monitoring device, location information device, transfer device, and tanks. This conceptual design is expected to be reflected and used in the basic design of the components and shapes of the mechanical recovery system.

Evaluation of Channel-forming Discharge for the Abandoned Channel Restoration Design of Cheongmi Stream (청미천 구하도 복원 설계를 위한 하도형성유량 산정)

  • Ji, Un;Kang, Jun-Gu;Yeo, Woon-Kwang;Han, Seung-Won
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.12
    • /
    • pp.1113-1124
    • /
    • 2009
  • The abandoned channel restoration is one of methods to enhance the environmental function and ecological habitat as well as the functions of water-utilization and flood control. The channel-forming or dominant discharge must be evaluated and defined to design the cross-sectional and plane geometries of the stable and equilibrium channel for the abandoned channel restoration project. In general, bankfull discharge, specified recurrence interval discharge, and effective discharge have been used to decide the channel-forming discharge. In this study, bankfull discharge, specified recurrence interval discharge, and effective discharge were calculated and compared for the abandoned channel restoration site of Cheongmi Stream and their relations to historical bed changes were analyzed. The bankfull discharge, 488 $m^3/s$, of the abandoned channel restoration site of Cheongmi Stream was calculated using HEC-RAS data and ranged between 1.5-year and 2-year recurrence discharges. Also, the effective discharge evaluated with the sediment rating curve and mean daily discharge data is greater than the bankfull discharge. According to the survey data of 1994 and 2008, the bed elevation of the study reach was decreased over time. It is indicated that the channel bed is changing to the stable condition to allow the effective discharge.