• Title/Summary/Keyword: depth-area-duration

Search Result 64, Processing Time 0.022 seconds

Analysis on Inundation Characteristics for Flood Impact Forecasting in Gangnam Drainage Basin (강남지역 홍수영향예보를 위한 침수특성 분석)

  • Lee, Byong-Ju
    • Atmosphere
    • /
    • v.27 no.2
    • /
    • pp.189-197
    • /
    • 2017
  • Progressing from weather forecasts and warnings to multi-hazard impact-based forecast and warning services represents a paradigm shift in service delivery. Urban flooding is a typical meteorological disaster. This study proposes support plan for urban flooding impact-based forecast by providing inundation risk matrix. To achieve this goal, we first configured storm sewer management model (SWMM) to analyze 1D pipe networks and then grid based inundation analysis model (GIAM) to analyze 2D inundation depth over the Gangnam drainage area with $7.4km^2$. The accuracy of the simulated inundation results for heavy rainfall in 2010 and 2011 are 0.61 and 0.57 in POD index, respectively. 20 inundation scenarios responding on rainfall scenarios with 10~200 mm interval are produced for 60 and 120 minutes of rainfall duration. When the inundation damage thresholds are defined as pre-occurrence stage, occurrence stage to $0.01km^2$, 0.01 to $0.1km^2$, and $0.1km^2$ or more in area with a depth of 0.5 m or more, rainfall thresholds responding on each inundation damage threshold results in: 0 to 20 mm, 20 to 50 mm, 50 to 80 mm, and 80 mm or more in the rainfall duration 60 minutes and 0 to 30 mm, 30 to 70 mm, 70 to 110 mm, and 110 mm or more in the rainfall duration 120 minutes. Rainfall thresholds as a trigger of urban inundation damage can be used to form an inundation risk matrix. It is expected to be used for urban flood impact forecasting.

Application of Grid-based DAD Analysis Program According to Rainfall Spatial Distribution Technique (공간보간 기법에 따른 격자기반 DAD 분석 프로그램 적용)

  • Kim, Young-Kyu;Yu, Wan-Sik;Jeong, An-Chul;Jung, Kwan-Sue
    • Journal of Cadastre & Land InformatiX
    • /
    • v.47 no.1
    • /
    • pp.191-211
    • /
    • 2017
  • Assessment of a storm is accomplished by the duration and storm area rather than a simple analysis given by the ground rain gauge stations. One of the best method for assessing storm is Depth-Area-Duration(DAD) of rainfall analysis. but existing DAD analysis method is likely to possible errors. Therefore, DAD analysis and its applicability were examined using a grid-based DAD analysis program that can reduce the possibility of errors in this study. Three spatial distribution techniques were used to analyze the applicability. Then, DAD analysis was performed using the converted grid-based rainfall data. As a result, it was possible to estimate the MAAR values by area for each duration, and showed high applicability in the rainfall data using ordinary kriging technique.

The effect of depth discontinuity on spreading of motion aftereffect to non-adapted area (비순응 영역으로의 운동 잔여효과의 번짐에 미치는 삼차원 깊이 불연속의 효과)

  • Kham, Kee-Taek
    • Korean Journal of Cognitive Science
    • /
    • v.21 no.1
    • /
    • pp.1-24
    • /
    • 2010
  • The stationary image appears to move after we view a moving stimulus for a long time. The motion aftereffect(MAE) can spread to an adjacent region if there is no contrast discontinuity between two regions. In this study, it is investigated whether a phenomenon of MAE spreading to an adjacent non adapting area is affected by the depth discontinuity defined by binocular disparity. In the first experiment a disparity defined slanted pattern was presented in an unadapted region, and in the second experiment, a disparity defined pattern with a different depth was presented on the fronto-parallel plane. Although MAE duration in the condition with slanted pattern was not different from that in the non-slanted pattern condition, MAE durations in the pattern presented on pronto-parallel plane was vividly reduced, but not completely disappeared. These results suggest that a phenomenon of MAE spreading might be affected by depth discontinuity, and could be occurred after binocular information converges.

  • PDF

Determination of flood-inducing rainfall and runoff for highly urbanized area based on high-resolution radar-gauge composite rainfall data and flooded area GIS Data

  • Anh, Dao Duc;Kim, Dongkyun;Kim, Soohyun;Park, Jeongha
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.157-157
    • /
    • 2019
  • This study derived the Flood-Inducing-Rainfall (FIR) and the Flood-Inducing-Runoff (FIRO) from the radar-gage composite data to be used as the basis of the flood warning initiation for the urban area of Seoul. For this, we derived the rainfall depth-duration relationship for the 261 flood events at 239 watersheds during the years 2010 and 2011 based on the 10-minute 1km-1km radar-gauge composite rainfall field. The relationship was further refined by the discrete ranges of the proportion of the flooded area in the watershed (FP) and the coefficient variation of the rainfall time series (CV). Then, the slope of the straight line that contains all data points in the depth-duration relationship plot was determined as the FIR for the specified range of the FP and the CV. Similar methodology was applied to derive the FIRO, which used the runoff depths that were estimated using the NRCS Curve Number method. We found that FIR and FIRO vary at the range of 37mm/hr-63mm/hr and the range of 10mm/hr-42mm/hr, respectively. The large variability was well explained by the FP and the CV: As the FP increases, FIR and FIRO increased too, suggesting that the greater rainfall causes larger flooded area; as the rainfall CV increases, FIR and FIRO decreased, which suggests that the temporally concentrated rainfall requires less total of rainfall to cause the flood in the area. We verified our result against the 21 flood events that occurred for the period of 2012 through 2015 for the same study area. When the 5 percent of the flooded area was tolerated, the ratio of hit-and-miss of the warning system based on the rainfall was 44.2 percent and 9.5 percent, respectively. The ratio of hit-and-miss of the warning system based on the runoff was 67 percent and 4.7 percent, respectively. Lastly, we showed the importance of considering the radar-gauge composite rainfall data as well as rainfall and runoff temporal variability in flood warning system by comparing our results to the ones based on the gauge-only or radar-only rainfall data and to the one that does not account for the temporal variability.

  • PDF

Size Determination Method of Bio-Retention Cells for Mimicking Natural Flow Duration Curves (자연상태 유황곡선 보전을 위한 생태저류지 용량결정방법)

  • Lee, Okjeong;Jang, Suhyung;Kim, Hongtae;Kim, Sangdan
    • Journal of Wetlands Research
    • /
    • v.18 no.4
    • /
    • pp.424-431
    • /
    • 2016
  • LID facilities like bio-retention cells is applied to manage stormwater. LID concept becomes an important part in stormwater management, and the clear understanding of hydrologic performance and hydrologic impact on the corresponding catchment has been needed. In this study, the application of flow duration curves as design strategy is investigated. Bio-retention cells like many LID facilities are installed to reproduce natural hydrologic processes. In this study, the attempt to determine the size of a bio-retention cell is carried out to satisfy the flow duration criteria. From the results, it is shown that "5 mm * the area of a target catchment" which is the current facility design capacity is valid for the drainage area with 20-30% impervious rate. In the 100% impervious catchment where LID facilities are typically installed, the design capacity to intercept stormwater of approximately 47 mm depth is required to reproduce natural flow duration curves. This means that about 11% of the target catchment area should be allocated as a bio-retention cell. However, the criteria of the design capacity and facility surface area should be set at the possible implementation conditions in reality, and site-specific hydrologic characteristics of a target catchment should be considered.

Determination of Optimum Design Capacity of Bio-retention for Improvement of Urban Water Cycle (도시 물 순환 개선을 위한 생태저류지의 최적설계용량 결정)

  • Lee, Okjeong;Choi, Jeonghyeon;Lee, Jeonghoon;Kim, Sangdan
    • Korean Chemical Engineering Research
    • /
    • v.55 no.6
    • /
    • pp.745-753
    • /
    • 2017
  • In this study, a design strategy is proposed to restore the distorted urban water cycle to the natural water cycle through the LID facility. This is accomplished by determining the optimal LID facility design capacity through which flow duration curves remain the same before and after urban development. A part of the Noksan National Industrial Complex in Busan was selected as the study area and EPA SWMM was constructed to simulate long-term stormwater for various land use scenarios and LID facility design capacity. In the case that the study area was assumed to be a forest area or an agricultural area before urban development, it was found that it was necessary to allocate 7.3% or 5.5% of the impervious area to the area of the bio-retention in order for the flow duration curve to remain the same as before urban development. As a result of the sensitivity analysis of the bio-retention design capacity according to regional rainfall characteristics, the design capacity of 3.8~5.5% of impervious area is needed for the development of agriculture area. Therefore, it can be seen that the optimum capacity can be significantly different according to regional rainfall characteristics. On the other hand, as a result of analyzing the sensitivity of the design capacity according to the variation of the depth of each layer constituting the bio-retention and the size of contributing catchment area, the sensitivity of the optimal design capacity with respect to the design specifications of the bio-retention and the size of contributing catchment area was not significant.

Development and Application of Automatic Rainfall Field Tracking Methods for Depth-Area-Duration Analysis (DAD 분석을 위한 자동 강우장 탐색기법의 개발 및 적용)

  • Kim, Yeon Su;Song, Mi Yeon;Lee, Gi Ha;Jung, Kwan Sue
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.4
    • /
    • pp.357-370
    • /
    • 2014
  • This study aims to develop a rainfall field tracking method for depth-area-duration (DAD) analysis and assess whether the proposed tracking methods are able to properly estimate the maximum average areal rainfall (MAAR) within the study area during a rainfall period. We proposed three different rainfall field tracking algorithms (Box-tracking, Point-tracking, Advanced point-tracking) and then applied them to the virtual rainfall field with 1hr duration and also compared DAD curves of each method. In addition, we applied the three tracking methods and a traditional GIS-based tool to the typhoon 'Nari' rainfall event of the Yongdam-Dam watershed and then assess applicability of the proposed methods for DAD analysis. The results showed that Box-tracking was much faster than the other two tracking methods in terms of searching for the MAAR but it was impossible to describe rainfall spatial pattern during its tracking processes. On the other hand, both Point-tracking and Advanced point-tracking provided the MAAR by considering the spatial distribution of rainfall fields. In particular, Advanced point-tracking estimated the MAAR more accurately than Point-tracking in the virtual rainfall field, which has two rainfall centers with similar depths. The proposed automatic rainfall field tracking methods can be used as effective tools to analyze DAD relationship and also calculate areal reduction factor.

Railway Underground Crossing Method Using PC Slab (직접 PC슬래브설치를 통한 철도지하횡단 공법의 적용 연구)

  • Min, Kyung-Ju;Lee, Bang-Woo;Park, Byung-Yong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2439-2449
    • /
    • 2011
  • Existing grade crossings between railway and roadway area gradually changed to grade separation systems by the law. In the case of new roadway construction which crosses railways, it shall be grade separation system in principle. With the railway underground crossing method, many practices have been developed which can minimize rail displacements and avoid rail release. With these methods, the effects to the train can be reduced. The underground crossing methods can be identified as open-cut methods and non open-cut methods. The open-cut methods include temporary support methods and special rail construction methods. Also the non open-cut methods includes pipe roof methods, front jacking methods, messer shield methods, NTR methods and JES methods. Among these, the most suitable method is applied considering safety, economy, class of each rail system (train passing frequency and velocity), etc. In the non open-cut methods, the cost and duration shall be increased to keep existing rail system during construction. In the open-cut methods which use plate girders, the rail speed shall be restricted due to the displacement and vibration of the girder. In this study new grade separation methods were developed. With this method, the safety during construction can be increased. This method refines temporary support methods, but pc slab girder with huge stiffness is applied instead of plate girders. With this method, the rail displacement can be reduced and higher safety can be obtained during construction. Also construction cost and duration can be minimized because the temporary work and the overburden soil depth can be reduced.

  • PDF

Groundwater Resources of Gum-Ho River Basin (금호강유역(琴湖江流域) 지하수대(地下水帶)에 관한 연구(硏究))

  • Han, Jeong Sang
    • Economic and Environmental Geology
    • /
    • v.11 no.3
    • /
    • pp.99-108
    • /
    • 1978
  • The Gum-Ho river basin is one of the densely populated area having more than 35% of the total population and it was also well irrigated since earlier days in the Nackdong river basin. Most of the easily developed source of surface water are fully utilized, and at this moment the basin is at the stage that no more :surface water can be made available under the present rapid development of economic condition. Since surface water supplies from the basin have become more difficult to obtain, the ground water resources must be thoroughly investigated and utilized greatly hereafter. In economic ground of the basin what part could ground water play? In what quantities and, for what uses could it be put? The answer to these questions can be relatively simple;the ground water resources in the basin can be put at almost any desired use and almost anywhere in the basin The area of the basin is at about $2088km^2$ in the middle part of Nackdong river basin and it is located along the Seoul-Pusan express highway. The mean annual rainfall is about 974.7mm, most of which falls from June to September during the monsoon. Accumulated is appeared approximately after every 8 year's accumlated dry period with the duration of 5 years. The water bearing formation in the basin include unconsolidated alluvial deposits in Age of Quaternary, saprolite derived from weathered crystalline rocks, Gyongsang sedimentary formations of the period from late Jurassic to Cretaceouse, and igneouse rocks ranging of the Age from Mesozoic to Cenozoic. The most productive ground water reservoir in the basin is calcareous shale and sandstones of Gyongsang system, which occupies about 66% of the total area. The results of aquifer test on Gyongsang sedimentary formation show that average pumping capacity of a well drilled into the formation with drilling diameter and average depth of $8{\frac{1}{2}}$ inch and 136m is $738m^3/day$ and also average specific capacity of those well is estimated $77.8m^3/D/M$. Total amount of the ground water reserved in the basin is approximately estimated at 37 billion metric tons, being equivalent 18 years total precipitations, among which 7 billion metric tons of portable ground water can be easily utilized in depth of 200 meters.

  • PDF

Development of Nonpoint Sources Runoff Load Estimation Model Equations for the Vineyard Area (포도밭에 대한 비점오염물질 유출량 추정 모델식 개발)

  • Yoon, Young-Sam;Kwon, Hun-Gak;Yi, Youn-Jung;Yu, Jay-Jung;Lee, Jae-Kwan
    • Journal of Environmental Science International
    • /
    • v.19 no.7
    • /
    • pp.907-915
    • /
    • 2010
  • Agriculture nonpoint pollution source is a significant contributor to water quality degradation. To establish effective water quality control policy, environpolitics establishment person must be able to estimate nonpoint source loads to lakes and streams. To meet this need for orchard area, we investigated a real rainfall runoff phenomena about it. We developed nonpoint source runoff estimation models for vineyard area that has lots of fertilizer, compost specially between agricultural areas. Data used in nonpoint source estimation model gained from real measuring runoff loads and it surveyed for two years(2008-2009 year) about vineyard. Nonpoint source runoff loads estimation models were composed of using independent variables(rainfall, storm duration time(SDT), antecedent dry weather period(ADWP), total runoff depth(TRD), average storm intensity(ASI), average runoff intensity(ARI)). Rainfall, total runoff depth and average runoff intensity among six independent variables were specially high related to nonpoint source runoff loads such as BOD, COD, TN, TP, TOC and SS. The best regression model to predict nonpoint source runoff load was Model 6 and regression factor of all water quality items except for was $R^2=0.85$.