• Title/Summary/Keyword: demand to capacity ratio

검색결과 138건 처리시간 0.025초

신재생에너지원을 고려한 집단에너지 경제성평가 방법론에 관한 연구 (A Study on the Method about the Economic Feasibility Estimation Considering Renewable Energy)

  • 신혜경;최영준;최인선
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 추계학술대회 논문집
    • /
    • pp.372-374
    • /
    • 2008
  • Korea classified into a development country when UNFCCC was concluded in 1995. So Korea doesn't have a GHG reduction duty until 2012. As the UNFCCC is strengthened, recently there is a growing interest in renewable energy and energy usage efficiency improvement for reducing GHG emission. It is associated with CES and renewable energy. CES is a total energy (heat, cooling and power)supplier in aggregated demand zone like a hotel, building, hospital and redevelopment district using CHP and it improves energy usage efficiency. At present, renewable energy is needed for GHG reduction duty but renewable energy doesn't have economic feasibility. So renewable energy is needed various support system to popularize which is a FIT and RPS. Especially RPS is carrying out instead of FIT in many advanced country and it will be inroduced in Korea. RPS is a duty which electricity service provider must guarantee renewable energy as much as specific ratio of total capacity. Therefore this study conducts an economic feasibility estimation of CES considering renewable energy when RPS will introduced in the future.

  • PDF

강성기반 연층비를 활용한 주거형 필로티 건축물의 내진성능예비평가 기법 개발 (Development of Preliminary Seismic Performance Evaluation Method for Residential Piloti Buildings Using Stiffness-Based Soft Story Ratios)

  • 최재혁;최인섭;김준희;손정훈
    • 한국전산구조공학회논문집
    • /
    • 제34권4호
    • /
    • pp.175-182
    • /
    • 2021
  • 연층을 가지는 건축물들의 피해사례가 관측됨에 따라 기존 건축물 내진성능평가시 수직비정형의 고려가 중요해졌다. 하지만 기존 방법은 수직비정형을 충분히 반영하기 어렵기 때문에 수직비정형을 가지는 건축물에 대해 내진성능을 과소 혹은 과대평가할 여지가 있다. 본 연구는 강성기반 연층비(Soft Story Ratio, SSR)를 이용해 수직비정형 건축물의 내진성능평가 기법을 개발하는데 목적이 있다. SSR은 변위에 대한 요구량과 능력의 비율을 나타내고, 강성차이에 의한 수직비정형을 고려하여 건축물의 변위집중 비율을 의미하는 파라미터다. 1층 기둥을 변수로 하는 필로티 건축물 네 개를 대상으로 개발한 내진성능평가 기법을 기존의 내진성능평가 기법과 비교하였다. 기존 기법은 수직비정형이 극대화되는 모델에 대해 내진성능을 과대평가하는 경우가 발생하였다. 반면 제안된 기법은 모든 모델에 대해서 상세평가의 결과와 동일했다. 따라서 제안하는 내진성능평가 기법은 수직비정형이 극대화되는 필로티 건축물에서 기존의 방법보다 정밀하게 내진성능평가 결과를 제공할 수 있다고 사료된다.

개량수평스티프너를 보강한 고강도강(HSA800) 접합부 내진성능평가 (Seismic Performance of High Strength Steel(HSA800) Beam-to-Column Connections with Improved Horizontal Stiffener)

  • 오상훈;박해용
    • 한국강구조학회 논문집
    • /
    • 제26권4호
    • /
    • pp.361-373
    • /
    • 2014
  • 건설시장이 보다 고층화 장스팬화되어감에 따라 건설재료 또한 고성능화되어가고 있다. 이러한 추세에 따라 국내에서도 건축용 인장강도 800MPa급 강이 개발되었다. 현재 고강도강을 대상으로 한 휨재, 압축재, 접합부의 적용실험이 지속적으로 이루어지고 있으나 아직까지 고강도강 적용에 대한 설계지침이 마련되어 있지 않은 실정이다. 이 중 고강도강 기둥-보 접합부의 경우 고강도강의 특성이라고 할 수 있는 높은 항복비에 의해 연성접합부 구현에 대한 평가가 비관적이며 연구자료 또한 미비하다. 따라서 본 연구에서는 고강도강 기둥-보 접합부의 변형능력 향상을 위하여 접합상세를 변수로 하고 연성접합부 구현을 위한 연구를 수행하였다. 접합상세로는 논스캘럽 공법과 개량 수평스티프너 공법을 적용하였다. 적용한 접합상세를 가지는 접합부 모델들을 대상으로 실물대 반복재하실험과 비선형 유한요소해석을 실시하였다. 연구결과, 제시한 접합상세를 가지는 고강도강 기둥-보 접합부의 구조성능은 KBC기준의 특수모멘트골조의 요구성능을 만족하는 것으로 나타났다.

중진대의 지진환경하에서 내풍설계된 초고층 철골조 중심가새골조의 지진응답해석 및 내진성능평가 (Seismic Response Analysis and Performance Evaluation of Wind-Designed Concentrically Braced Steel Highrise Buildings under Moderate Seismicity)

  • 이철호;김선웅
    • 한국지진공학회논문집
    • /
    • 제9권1호통권41호
    • /
    • pp.33-42
    • /
    • 2005
  • 국내와 같이 풍하중이 지배 횡하중으로 작용하는 중/약진대라 할지라도 초고층건물의 설계를 담당하고 있는 구조기술자는 특정세기의 잠재지진(가령 재래기 500년 정도의 설계용지진동 또는 재래기 2400년 정도의 최대한도지진)이 구조시스템에 미칠 수 있는 구조적 영향을 합리적으로 평가할 수 있어야 한다. 본 연구에서는 중/약진대로 분류되는 국내의 지진환경하에서, 국내 구조사무소의 평균적 실무관행에 따라 내풍설계된 초고층 철골중심가새골조를 가정하여 지진해석을 수행하고 내진성능을 평가하였다. 내풍설계에서 요구되는 사용성 요건 및 횡력저항 철골부재에 부과돠는 폭-두께비 제한 등으로 인해 상당한 크기의 시스템 초과강도(system overstrength)가 유입됨을 확인할 수 있었다. 내풍설계과정에서 부차적으로 기인하는 이 시스템 초과강도로 인하여, 본 연구의 세장비 6 이상의 철골조 초고층 중심가새골조는 2400년 재래기의 최대한도지진에 대해서도 즉시입주 가능한 거동수준에서 탄성적으로 저항할 수 있음을 확인하였다.

우리나라 웹 접근성 정책 영향요인 분석 - 16개 광역자치단체 패널데이터를 중심으로 - (An Analysis of Panel Data on the Web-accessibility Policies of Local Governments in Korea)

  • 진상기;현준호
    • 정보화정책
    • /
    • 제18권4호
    • /
    • pp.42-58
    • /
    • 2011
  • 웹(Web)의 창시자인 팀 버너스 리 경(Sir. Tim Berners-lee)은 웹의 힘은 보편성에 있으며, 장애에 구애 없이 모든 사람이 접근할 수 있는 것이 가장 중요한 요소라고 지적(W3C WAI, 2006)하였다. 또한 Lasswell(1971)과 허범(2009a;2009b)이 말하는 정책학의 이상과 가치의 핵심인 인간의 존엄성 추구라는 관점에서 볼 때에도 인터넷 상의 형평성 구현은 정보사회에서의 중요한 가치이다. 이러한 맥락에서 본 연구는 지식정보사회의 핵심인 웹 상에서의 형평성을 구현하는데 있어 중요한 웹 접근성 준수에 영향을 주는 요인을 도출하고 정책적 시사점을 제시하는데 연구 목적이 있다. 본 연구는 특히, 광역자치단체의 웹 접근성 정책에 영향을 미치는 주요 요소를 문헌 연구와 수요공급 균형 모형의 가정을 준용하여 법제도 환경 요소, 재정 기반 요소, 정책자원 투입 요소, 정책 수요 요소로 가정을 하고 이에 따라 연구 모형을 설계하였다. 이를 바탕으로 우리나라 16개 광역자치단체에 대한 전수 분석을 통해 웹 접근성 정책 결정요인 분석을 실시하였다. 연구의 정확성을 위해 본 연구는 각 광역자치단체들의 5개년 패널자료를 바탕으로 최적모형 검정을 통해 도출한 패널분석모형을 통해 분석을 실시하였다. 본 연구의 패널분석모형은 웹 접근성 지수를 종속변수로 설정하고 독립변수로는 정책수요(인터넷 이용률, 장애인 및 노인비율), 정책자원 투입(정보화 예산비율, 정보화 인력), 재정기반(재정자립도)을 설정하여 패널분석을 실시하였다. 분석 결과 정책 수요, 정책자원 투입, 정보화 역량 변수가 16개 광역자치단체의 웹 접근성 제고에 영향을 주는 것으로 나타났다. 나아가 본 연구는 패널분석 모형과 문헌연구를 통해 지방자치단체의 웹 접근성 제고를 위한 법제도 환경요소의 중요한 역할을 추론해 낼 수 있었다. 이러한 연구 결과를 바탕으로 웹 접근성 인식제고를 위한 노력, 표준 제정 및 관련 기술 개발 연구 확대, 웹 접근성 관련 인력양성 그리고 법 제도 개선을 정책제안으로 제시하였다.

  • PDF

물부족 지역에서 샌드댐 설치에 의한 장기 물공급 개선 효과 분석 (Analysis of the effect of long-term water supply improvement by the installation of sand dams in water scarce areas)

  • 정일문;이정우;이정은;김일환
    • 한국수자원학회논문집
    • /
    • 제55권12호
    • /
    • pp.999-1009
    • /
    • 2022
  • 춘천 물로리 지역은 지방상수도가 보급되지 않은 물복지 소외지역으로 복류수 및 지하수를 수원으로 하는 소규모 급수시설로 마을에 물을 공급하고 있다. 가뭄시 물부족 문제를 해결하고 증가하는 물수요에 대비하기 위해 계곡에 연하여 샌드댐을 설치하였으며, 2022년 5월부터 이 시설을 운영하고 있다. 본 연구에서는 과거 가뭄시 샌드댐이 있을 경우의 물공급 신뢰도를 평가하기 위해 MODFLOW모형을 이용한 지하수유출량 모의결과를 활용하여 미계측 기간인 2011년부터 2020년까지의 유입량 자료를 생성하였다. 기존 취수원과 샌드댐이 위치한 곳의 상류부 유역에 대해 SWAT-K 유역수문모델링을 수행하여 지하수유출량을 산정하고, 2021년 월별 지하수유출량에 대한 그 이전 10년 동안의 각 월별 지하수유출량의 상대적 비율을 구한 후 2021년 유입량 시계열 자료에 이 비율을 적용하여 2011년부터 2020년까지의 과거 유입량 자료를 생성하였다. 수요량 20 m3/일, 50 m3/일, 100 m3/일 세 가지 경우에 대해 과거 극한 가뭄시의 물공급 가능여부를 분석한 결과, 샌드댐 설치로 물공급 신뢰도가 증가하는 것을 확인 할 수 있으며, 수요량 100 m3/일인 경우에는 기존 취수원과 샌드댐을 연계 운영해야만 신뢰도 90%를 넘는 것으로 분석되었다. 세 가지 운영조건 모두 물공급 신뢰도 95%를 기준으로는 수요량 50 m3/일 이상, 신뢰도 99%를 기준으로는 수요량 30 m3/일 이상을 만족하는 것으로 평가되었다.

혼합공정과 부착성장공정을 조합한 2단계 혐기 조합공정에서 palm oil mill effluent의 처리 (Treatment of palm oil mill effluent using 2 stage reactors combined anaerobic hybrid reactor and anaerobic attached growth reactor)

  • 신창하;손성민;정주영;박주양
    • 상하수도학회지
    • /
    • 제27권1호
    • /
    • pp.21-29
    • /
    • 2013
  • Present study was conducted to evaluate the performance of Anaerobic Hybrid Reactor (AHR) combined with two types of anaerobic attached growth reactors at mesophilic temperature ($37^{\circ}C$). The reactor was operated at the influent substrate condition of 19,400 mg/L soluble chemical oxygen demand (sCOD). The organic loading rate (OLR) and flow rate were varied in the range of $9.5{\sim}22.5kg/m^3$. day and 10.6 ~ 26.0 L/day respectively since start-up was done. The COD removal efficiency of 93 % was measured at the OLR of $14kg/m^3$. day in AHR. However a reduction in removal efficiency to as low as 85 % could have been related to a combined effect of high concentration suspended solids (SS) concentration over 3,800 mg/L. On the other hand the total COD removal efficiencies were measured to be 96.3 % and 96.2 % for AHR+APF and AHR+ADF respectively. The pH of the POME was adjusted to neutral range by using sodium bicarbonate at the initial stages of the reactor feed, later stages pH adjustment was not required as the pH was maintained in the desired neutral range due to self-buffering capacity of the reactor. The reactor proved to be economically acceptable and operationally stable. The biogas was measured to have $CH_4$ and $CO_2$ with a ratio of 35:65, and methane gas production rate was estimated to be $0.17{\sim}10.269L\;CH_4/g\;COD_{removed}$.

황화영가철 기반의 과황산 고도산화공정을 이용한 페놀 오염토양 처리 (Treatment of Phenol Contaminated Soil Using Sulfidated Zero-Valent Iron as a Persulfate Activator for Advanced Oxidation Process)

  • 정혁성;응우옌 쿠엔 비엔;최재영;황인성
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제28권1호
    • /
    • pp.15-24
    • /
    • 2023
  • A persulfate(PS)/sulfidated microscale zero-valent iron(S-mZVI) system was tested for treating a soil contaminated with phenol. Sulfidation of bare mZVI was conducted using a mechanochemical process utilizing a ball mill in order to improve persulfate activation capacity and stability of unmodified mZVI. The synthesized S-mZVI performed markedly better than the bare mZVI in activating PS. The optimum molar ratio of sulfur to mZVI was around 0.12. In the soil slurry experiments, a very rapid and complete removal of phenol was observed at the optimum molar ratios of PS to S-mZVI of 2:1 and PS to phenol of 16:1. The phenol removal efficiencies decreased as the water content of the slurries decreased. This was believed to be due to increased soil oxidant demand as the amount of soil was increased as relative to the water content. To evaluate the field applicability of the process, slurry experiments adopting high soil contents were carried out that simulated in-situ soil mixing conditions. These experiments resulted in substantially compromised degradation efficiencies of 54.3% and 43.8% within 4 hours. The current study generally shows that the PS/S-mZVI process has a potential to be developed into a remediation technology for soils contaminated with organics.

EPANET을 이용한 농업용 관수로 시스템의 운영 및 유지관리 인자 분석 (Analysis of Operating and Maintenance Parameters for Agricultural Pipeline System Using EPANET)

  • 김남도;김선주;권형중;김필식;박현준
    • 한국농공학회논문집
    • /
    • 제59권4호
    • /
    • pp.17-26
    • /
    • 2017
  • In this study, EPANET model which is using on the pipe network analysis was applied to Haenam irrigation district has provided irrigation water by pipeline system about 1,125ha and then have built pipe network to study area and supply performance evaluation of existing structure was analyzed by SPA (Single Period Analysis) in EPANET. As model results of simulation average ratio of maximum supply quantity/irrigation water requirements(base demand) was analyzed by 2.63. It means also that was analyzed as being capable of ensuring the water supply capacity. It was provided the necessary information for the maintenance facility through analyzed hydraulic behaviors in the pipeline inside such as flow velocities, pressures and hydraulic grade lines. It was satisfied with the allowable design criteria that was compared analyzed results with presented allowable design standards at agricultural production infra improvement project planning and design (Pipeline design standard). In order to analyze efficiency promotions of irrigation water, using Extended Period Simulation it was compared supply quantity with irrigation water requirements while pumps set operating pattern in 24 hours, then efficiency promotions of irrigation water was determined through analyzed oversupply water quantity and occurrence time by branch lines. According to results for oversupply quantity in Haenam district by time and end of branch lines efficiency promotions of irrigation water was suggested from 0.33 % to 37.59 %. To draw reasonable operating rules for water use and through this research, it is expected to be helpful for efficient water use and operational management of agricultural pipeline system to the current agricultural irrigation.

Managing Deadline-constrained Bag-of-Tasks Jobs on Hybrid Clouds with Closest Deadline First Scheduling

  • Wang, Bo;Song, Ying;Sun, Yuzhong;Liu, Jun
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제10권7호
    • /
    • pp.2952-2971
    • /
    • 2016
  • Outsourcing jobs to a public cloud is a cost-effective way to address the problem of satisfying the peak resource demand when the local cloud has insufficient resources. In this paper, we studied the management of deadline-constrained bag-of-tasks jobs on hybrid clouds. We presented a binary nonlinear programming (BNP) problem to model the hybrid cloud management which minimizes rent cost from the public cloud while completes the jobs within their respective deadlines. To solve this BNP problem in polynomial time, we proposed a heuristic algorithm. The main idea is assigning the task closest to its deadline to current core until the core cannot finish any task within its deadline. When there is no available core, the algorithm adds an available physical machine (PM) with most capacity or rents a new virtual machine (VM) with highest cost-performance ratio. As there may be a workload imbalance between/among cores on a PM/VM after task assigning, we propose a task reassigning algorithm to balance them. Extensive experimental results show that our heuristic algorithm saves 16.2%-76% rent cost and improves 47.3%-182.8% resource utilizations satisfying deadline constraints, compared with first fit decreasing algorithm, and that our task reassigning algorithm improves the makespan of tasks up to 47.6%.