Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.1
/
pp.109-117
/
2023
Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.
Kim, Yong Hwan;Yoon, Hyeong Seok;Lee, Jae Hee;Kang, Leen Seok
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.1
/
pp.79-89
/
2023
The inventory of many materials requires a large storage space, and the longer the storage period, the higher the potential maintenance cost. When materials are stored on a construction site, there are also concerns about safety due to the reduction of room for movement and working. On the other hand, construction sites that do not store materials have insufficient inventory, making it difficult to respond to demands such as sudden design changes. Ordering materials is then subject to delays and extra costs. Although securing an appropriate amount of inventory is important, in many cases, material management on a construction site depends on the experience of the site manager, so a reasonable material inventory management plan that reflects the construction conditions of a site is required. This study proposes an economical material management method by reflecting variables such as the status of the preceding and following activities, site size, material delivery cost, timing of an order, and quantity of orders. To this end, we set the appropriate inventory amount while adjusting related activities in the activity network, using float time for each activity, the size of the yard, and the order quantity as the main variables, and applied a genetic algorithm to this process to suggest the optimal order timing and order quantity. The material delivery cost derived from the results is set as a fitness index and the efficiency of inventory management was verified through a case application.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.6D
/
pp.917-926
/
2006
Transportation Economies of scale are the essential properties of hub networks. One critical property of the hub network design problem is to quantify cost savings which stem from economies of scale, the costs of operating hub facilities and opportunity costs associated with delays stemming from consolidation of traffic flows. Due to the NP-complete property of the hub location problem, however, most previous researchers have focused on the development of heuristic algorithms for approximate solutions. The purpose of this paper is to develop a hub network design model considering transportation economies of scale from the consolidation of traffic flows. The model is designed to consider the uniqueness of hub networks and to determine several cost components. The heuristic algorithms for the developed model are suggested and the results of the model are compared with recently published studies using real data. Results of the analysis show that the proposed model reflects transportation economies of scale due to consolidation of flows. This study can form not only the theoretical basis of an effective and rational hub network design but contribute to the assessment of existing and planned logistics systems.
Yeonju Kim;Sang Woo Park;Min Seong Jung;Ji Hun Kim;Jong Kyung Park
Journal of the Microelectronics and Packaging Society
/
v.30
no.4
/
pp.8-16
/
2023
The importance of next-generation packaging technologies is being emphasized as a solution as the miniaturization of devices reaches its limits. To address the bottleneck issue, there is an increasing need for 2.5D and 3D interconnect pitches. This aims to minimize signal delays while meeting requirements such as small size, low power consumption, and a high number of I/Os. Hybrid bonding technology is gaining attention as an alternative to conventional solder bumps due to their limitations such as miniaturization constraints and reliability issues in high-temperature processes. Recently, there has been active research conducted on SiCN to address and enhance the limitations of the Cu/SiO2 structure. This paper introduces the advantages of Cu/SiCN over the Cu/SiO2 structure, taking into account various deposition conditions including precursor, deposition temperature, and substrate temperature. Additionally, it provides insights into the core mechanisms of SiCN, such as the role of Dangling bonds and OH groups, and the effects of plasma surface treatment, which explain the differences from SiO2. Through this discussion, we aim to ultimately present the achievable advantages of applying the Cu/SiCN hybrid bonding structure.
The Journal of the Convergence on Culture Technology
/
v.9
no.6
/
pp.843-848
/
2023
The purpose of this study is to understand in detail the development of infants in the 18-24-month period when language develops the most, and to prepare new standards for developmental evaluation that can promote appropriate intervention design at an early time. We divided sub-items such as screening tests and standardized test tools to know the language development ability indicators of infants aged 18-24 months were divided into syntax/phonology, meaning, and speech, and each question was classified and a checklist was made on a five-point scale to conduct a survey on parents with infants aged 18-24 months. Low sensitivity to screening of infants with language delays in nationally implemented infant health checkups, and domestic test tools are standardized for at least six to as many as 10 years, which is always possible in questionnaires related to acceptance and expression, with many reports from parents or teachers.The proportion of "wow" and "started to do" was more than 50-60%. Based on the results of this study, it is hoped that new standards for developmental evaluation will be developed to promote the design of appropriate interventions in detail at a short time.
Hanjin Kim;Kwanhyeok Kim;Beomsu Ha;Joo Young Kim;Sung Jun Shim;Jee Hoon Koo;Won-Tae Kim
The Transactions of the Korea Information Processing Society
/
v.13
no.6
/
pp.243-250
/
2024
Biomimetic robots, which emulate characteristics of biological entities such as birds or insects, have the potential to offer a tactical advantage in surveillance and reconnaissance in future battlefields. To effectively utilize these robots, it is essential to develop technologies that emulate the wing flapping of birds or the movements of cockroaches. However, this effort is complicated by the challenges associated with securing the necessary hardware and the complexities involved in software development and validation processes. In this paper, we presents the design and implementation of a multi-HILS based biomimic robot software validation testbed using modeling and simulation (M&S). By employing this testbed, developers can overcome the absence of hardware, simulate future battlefield scenarios, and conduct software development and testing. However, the multi-HILS based testbed may experience inter-device communication delays as the number of test robots increases, significantly affecting the reliability of simulation results. To address this issue, we propose the data distribution service priority (DDSP), a priority-based middleware. DDSP demonstrates an average delay reduction of 1.95 ms compared to the existing DDS, ensuring the required data transmission quality for the testbed.
Kim, Hyunbee;Karunarathne, Batagalle Vinuri;Kim, ByungSoo
Korean Journal of Construction Engineering and Management
/
v.25
no.1
/
pp.32-41
/
2024
In the construction industry, not only safety accidents, but also various complex risks such as construction delays, cost increases, and environmental pollution occur, and management technologies are needed to solve them. Among them, process risk management, which directly affects the project, lacks related information compared to its importance. This study tried to develop a MATM tunnel process risk classification system to solve the difficulty of risk information retrieval due to the use of different classification systems for each project. Risk collection used existing literature review and experience mining techniques, and DB construction utilized the concept of natural language processing. For the structure of the classification system, the existing WBS structure was adopted in consideration of compatibility of data, and an RBS linked to the work species of the WBS was established. As a result of the research, a risk classification system was completed that easily identifies risks by work type and intuitively reveals risk characteristics and risk factors linked to risks. As a result of verifying the usability of the established classification system, it was found that the classification system was effective as risks and risk factors for each work type were easily identified by user input of keywords. Through this study, it is expected to contribute to preventing an increase in cost and construction period by identifying risks according to work types in advance when planning and designing NATM tunnels and establishing countermeasures suitable for those factors.
Information sharing and decision making between airport stakeholders became possible after the introduction of airport cooperative making system (A-CDM). This also resulted in optimizing aircraft handling time and increased the efficiency of aircraft operations. Technological advances have recently led to the development of urban air mobility (UAM) which is a small aircraft taking off and landing vertically. It is emerging as a new air transportation system in the future due to its advantage of saving time and solving congestion problem in the urban area. This study aims to suggest how vertiport cooperative decision making system (V-CDM) should be managed for efficient operation of UAM. By establishing procedure for decision making system based on Vertiport ecosystem of UAM. By establishing procedure for decision making system based on Vertiport ecosystem and UAM aircraft, unnecessary flight delays or cancellations can be minimized and efficiency of UAM operation will be improved as well.
The Journal of Korean Academy of Sensory Integration
/
v.21
no.3
/
pp.1-12
/
2023
Objective : The purpose of this study was to compare the effects of the sensory processing characteristics of parents of developmentally delayed children and parents of typically developed children on parenting stress. Methods : From July to August 2022, 61 parents of children with developmental delays and 64 parents of children with typical development who used occupational therapy services at pediatric clinics and child development centers were evaluated for parenting stress and sensory profiles. Results : In a multiple regression analysis on the effect of sensory processing characteristics on the total score of parenting stress, tactile processing (β = 0.353, p = 0.001), gender (β = 0.438, p = 0.000), and monthly income (β = -0.261, p = 0.014) significantly affected the parenting stress of the parents of children with developmental delay. In parents of typically developing children, tactile processing (β = 0.376, p = 0.002) and gender (β = -0.264, p = 0.024) were found to have a significant effect on parenting stress. Conclusion : Parental gender and tactile processing characteristics of developmentally delayed and typically developing children are significant influencing factors for parenting stress.
In the maritime shipping industry, imbalance between supply and demand has persistently increased, leading to the utilization of blank sailings by major shipping companies worldwide as a key means of flexibly adjusting vessel capacity in response to shipping market conditions. Traditionally, blank sailings have been frequently implemented around the Chinese New Year period. However, due to unique circumstances such as the global pandemic starting in 2020 and trade tensions between the United States and China, shipping companies have recently conducted larger-scale blank sailings compared to the past. As blank sailings directly impact freight transport delays, they can have negative repercussions from perspectives of both businesses and consumers. Therefore, this study employed Poisson regression models and negative binomial regression models to analyze the influence of maritime freight rate determinants on shipping companies' decisions regarding blank sailings, aiming to proactively address potential consequences. Results of the analysis indicated that, in Poisson regression analysis for 2M, significant variables included global container shipping volume, container vessel capacity, container ship scrapping volume, container ship newbuilding index, and OECD inflation. In negative binomial regression analysis, ocean alliance showed significance with global container shipping volume and container ship order volume, the alliance with container ship capacity and interest rates, non-alliance with international oil prices, global supply chain pressure index, container ship capacity, OECD inflation, and total alliance with container ship capacity and interest rates.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.