• Title/Summary/Keyword: deep tunnel

Search Result 332, Processing Time 0.022 seconds

A study of measures to improve the system for the construction of deep tunnels in urban area (도심지 대심도 터널 건설을 위한 제도개선 방안 연구)

  • Hoonki Moon;Joon-Shik Moon;Jongho Shin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.6
    • /
    • pp.469-478
    • /
    • 2023
  • The deep tunnel in urban area is a future-oriented construction plan that allows the above-ground space to be used as an eco-friendly park and transportation infrastructure to be constructed in the underground space. However, tunnel construction is often depicted as to cause ground collapse in some media and movies. In fact, while the construction of a deep tunnel in the urban area is underway, the project face with difficulties due to opposition complaints from residents near the route. In this study, we sought to identify perceptions on deep space development and citizen concerns through a public opinion survey regarding deep tunnels. By analyzing laws relevant with the promotion of deep tunnel construction, we reviewed the possibility of public engagement at each stage of the construction and investigated separated surface rights related to compensation for underground space. Through the results of the public opinion survey, it was identified that the concerns of citizens were problems that current technology could solve. Citizen's concerns were improved into a system that confirmed the stability of tunnel construction through public participation, and improvement measures were presented to encourage cooperation from those concerned regarding the establishment of divided superficies.

The Role of Feed Back Analysis in Observational Method (정보화 시공에서 Feed Back Analysis (터널, 암반사면, 지반굴착 등 Hard Material 사례중심으로))

  • 김학문
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.147-179
    • /
    • 2002
  • The important role of observational method in geotechnical engineering are emphasized together with the direction of future development, concerning successful application of the technique on the site investigation, design and feed back at various construction stages. Case histories on the application of feed back are introduced in order to achieve the most economical and reliable construction for tunnel, rock slope and deep excavations through feed back system at design and construction stages. Also the limitations and advantages of the observational method and the role of feed back system are discussed for construction of tunnel, rock slope and deep excavation in hard ground such as layered ground conditions including weathered, soft and hard rocks.

  • PDF

DESIGN OF THE CEMENT DEEP MIXING FOUNDATION FOR THE BUSAN-GEOJE IMMERSED TUNNEL

  • Kim, Yong-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09c
    • /
    • pp.96-103
    • /
    • 2010
  • The GK immersed tunnel as a part of the Busan-Geoje Fixed Link Project, introduced the immersed tunnel method into Korea for the first time. This challeging project to be completed in 2010 will open a new era to link oceans of the world with optimized design and safety for future use. The immersed tunnel method would possibly suitable for use in construction of a sub sea tunnel from Korea to Japan and from Korea to China that could potentially be built in the distant future. We hope the techniques learned from the Busan-Geoje Fixed Link Project can be applied to further projects in the near future.

  • PDF

Rock Quality using Seismic Tomography in Deep Tunnel Depths (대심도 탄성파 토모그래피 탐사를 이용한 암반분류)

  • Koo, Ja-Kab;Kim, Young-Duck;Kwon, So-Jin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.3 no.3
    • /
    • pp.5-13
    • /
    • 2002
  • In tunnel design, geotechnical survey of over 200m tunnel depth is required because of its characteristical topography. For this reason, there are difficulties in collecting information of basic data in tunnel design because of large-scale costs in borehole tests, of limits to a geotechnical analysis by the existing refraction seismic survey and of analytical errors in steep mountainous area. Seismic tomography has many advantages as follows; 1) seismic velocity as absolute value is more reliable than electrical resistivity, 2) geotechnical analysis in deep tunnel depth is available by seismic velocity, 3) analytical errors is reduced in steep mountainous area. In this paper, it was found out a correlation of seismic velocity and Q in tunnel design in the neighborhood of the National Capital region and the reduction effect of tunnel construction cost using reliable rock quality by seismic tomography compared with by borehole data and electricity resistivity data.

  • PDF

Conflict analysis and countermeasures due to construction of very-deep tunnels in urban area (도심지 대심도 터널건설에 따른 갈등분석 및 대책)

  • Moon, Joon-Shik;Jeon, Kichan;Kim, Young Geun;Moon, Hoonki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.371-384
    • /
    • 2021
  • Underground space, especially very-deep tunnel development in urban area, is a good alternative to solve the problem of insufficient ground space, and the need for underground space development is steadily increasing. However, due to the complex and time-consuming nature of design and construction, public conflicts related to the deep tunnel project are getting aggravating and more complex. In addition, since the public budget is mainly invested, when civil complaints arise, they often respond passively, resulting in amplification of conflicts or prolonging the deadlock in many cases. In this study, by analyzing the progress of major conflicts related to the construction of very-deep tunnels in urban area, the causes of conflicts, factors prolonging conflicts, and solutions are reviewed. Through a survey targeting ordinary citizens and tunnel experts, thoughts about the deep tunnel construction and major conflict factors were analyzed, and suggestions for minimizing conflicts were presented. The results of this study can be used to prepare alternatives such as various public involvement measures and improvement of project procedures to form a civic consensus on the construction of very-deep tunnels, and to prepare measures to improve prejudice against very-deep tunnels.

Study of seismic amplitude method using single source for tunnel detection (터널탐사에 단일 파동원을 이용한 탄성파 진폭법에 관한 연구)

  • Suh, Baek-Soo;Sohn, Kwon-Ik
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.3-7
    • /
    • 2007
  • There are many techniques to calculate the exact position of deep seated tunnel. Especially, tomography method has been used generally in present days. This method has been performed mainly by wave traveltime. Because of short interval of two measuring boreholes, it was very hard to interpret the exact tunnel position. To solve this problem, seismic amplitude method was tried to detect exact pososition of tunnel in this study.

  • PDF

Crack Detection Method for Tunnel Lining Surfaces using Ternary Classifier

  • Han, Jeong Hoon;Kim, In Soo;Lee, Cheol Hee;Moon, Young Shik
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.9
    • /
    • pp.3797-3822
    • /
    • 2020
  • The inspection of cracks on the surface of tunnel linings is a common method of evaluate the condition of the tunnel. In particular, determining the thickness and shape of a crack is important because it indicates the external forces applied to the tunnel and the current condition of the concrete structure. Recently, several automatic crack detection methods have been proposed to identify cracks using captured tunnel lining images. These methods apply an image-segmentation mechanism with well-annotated datasets. However, generating the ground truths requires many resources, and the small proportion of cracks in the images cause a class-imbalance problem. A weakly annotated dataset is generated to reduce resource consumption and avoid the class-imbalance problem. However, the use of the dataset results in a large number of false positives and requires post-processing for accurate crack detection. To overcome these issues, we propose a crack detection method using a ternary classifier. The proposed method significantly reduces the false positive rate, and the performance (as measured by the F1 score) is improved by 0.33 compared to previous methods. These results demonstrate the effectiveness of the proposed method.

Rock Classification Prediction in Tunnel Excavation Using CNN (CNN 기법을 활용한 터널 암판정 예측기술 개발)

  • Kim, Hayoung;Cho, Laehun;Kim, Kyu-Sun
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.9
    • /
    • pp.37-45
    • /
    • 2019
  • Quick identification of the condition of tunnel face and optimized determination of support patterns during tunnel excavation in underground construction projects help engineers prevent tunnel collapse and safely excavate tunnels. This study investigates a CNN technique for quick determination of rock quality classification depending on the condition of tunnel face, and presents the procedure for rock quality classification using a deep learning technique and the improved method for accurate prediction. The VGG16 model developed by tens of thousands prestudied images was used for deep learning, and 1,469 tunnel face images were used to classify the five types of rock quality condition. In this study, the prediction accuracy using this technique was up to 83.9%. It is expected that this technique can be used for an error-minimizing rock quality classification system not depending on experienced professionals in rock quality rating.

A Study on Falling Detection of Workers in the Underground Utility Tunnel using Dual Deep Learning Techniques (이중 딥러닝 기법을 활용한 지하공동구 작업자의 쓰러짐 검출 연구)

  • Jeongsoo Kim;Sangmi Park;Changhee Hong
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.498-509
    • /
    • 2023
  • Purpose: This paper proposes a method detecting the falling of a maintenance worker in the underground utility tunnel, by applying deep learning techniques using CCTV video, and evaluates the applicability of the proposed method to the worker monitoring of the utility tunnel. Method: Each rule was designed to detect the falling of a maintenance worker by using the inference results from pre-trained YOLOv5 and OpenPose models, respectively. The rules were then integrally applied to detect worker falls within the utility tunnel. Result: Although the worker presence and falling were detected by the proposed model, the inference results were dependent on both the distance between the worker and CCTV and the falling direction of the worker. Additionally, the falling detection system using YOLOv5 shows superior performance, due to its lower dependence on distance and fall direction, compared to the OpenPose-based. Consequently, results from the fall detection using the integrated dual deep learning model were dependent on the YOLOv5 detection performance. Conclusion: The proposed hybrid model shows detecting an abnormal worker in the utility tunnel but the improvement of the model was meaningless compared to the single model based YOLOv5 due to severe differences in detection performance between each deep learning model

Study of the Effective Fire and Smoke Control in Deep Underground Tunnel with Transverse Ventilation (대심도 터널 화재 시 균일배기 환기방식에서의 최적배연 연구)

  • Kim, Jong-Yoon;Lim, Kyung-Bum;Jeon, Yong-Han
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.1
    • /
    • pp.21-26
    • /
    • 2015
  • This study represents the effective fire and smoke control in the case of fire in deep underground tunnels, even if the exhaust system can be calculated, the optimal smoke capacity can be determined by establishing technical standards for the transverse ventilation system focusing on the design as a basis for deriving the parameters for utilization. Numerical analyses were performed using the FDS program as a function of the unsteady flow in a deep underground tunnel fire. The analysis results were calculated within 250 m smoke using an inside wind velocity of 0m/s when the capacity of smoke was exhausted, $80m^3/s$, whereas in case of an internal wind velocity of 3m/s, the capacity of smoke exhaust was $197.1m^3/s$, showing an approximately 2.5 fold increase.