• Title/Summary/Keyword: deck joint

Search Result 117, Processing Time 0.025 seconds

Influence of post-pouring joint on long-term performance of steel-concrete composite beam

  • Huang, Dunwen;Wei, Jun;Liu, Xiaochun;Zhang, Shizhuo;Chen, Tao
    • Steel and Composite Structures
    • /
    • v.28 no.1
    • /
    • pp.39-49
    • /
    • 2018
  • The concrete bridge decks are usually precast and in-situ assembled with steel girders with post-pouring joint in the construction practice of super-wide steel-concrete composite beam. But the difference of concrete age between the precast slabs and the post-pouring joint has been not yet considered for the long-term performance analysis of this kind composite beam. A simply supported precast-assembled T-shaped beam was taken as an example to analyze the long-term performance of steel-concrete composite beam with post-pouring joint. Based on the deformation coordination conditions of the old-new concrete deck and steel girder, a theoretical model for the long-term behavior of precast-assembled composite beam is proposed in this paper according to age-adjusted effective modulus method. Then, the feasibility of the proposed model is verified by the available test data from the Gilbert's composite beams. Parametric studies were preformed to evaluate the influences of the cross-sectional area ratio of the post-pouring joint to the whole bridge deck, as well as the difference of concrete age between the precast slabs and the post-pouring joint, on the long-term performance of the composite beam. The results indicate that the traditional method without considering the age difference would seriously underestimate the effect of creep and shrinkage of concrete bridge decks. The concrete age difference between the precast slabs and the post-pouring joint should be demonstrated for the life cycle design and long-term performance analysis of precast-assembled steel-concrete composite beams.

Probabilistic fatigue assessment of rib-to-deck joints using thickened edge U-ribs

  • Heng, Junlin;Zheng, Kaifeng;Kaewunruen, Sakdirat;Zhu, Jin;Baniotopoulos, Charalampos
    • Steel and Composite Structures
    • /
    • v.35 no.6
    • /
    • pp.799-813
    • /
    • 2020
  • Fatigue cracks of rib-to-deck (RD) joints have been frequently observed in the orthotropic steel decks (OSD) using conventional U-ribs (CU). Thickened edge U-rib (TEU) is proposed to enhance the fatigue strength of RD joints, and its effectiveness has been proved through fatigue tests. In-depth full-scale tests are further carried out to investigate both the fatigue strength and fractography of RD joints. Based on the test result, the mean fatigue strength of TEU specimens is 21% and 17% higher than that of CU specimens in terms of nominal and hot spot stress, respectively. Meanwhile, the development of fatigue cracks has been measured using the strain gauges installed along the welded joint. It is found that such the crack remains almost in semi-elliptical shape during the initiation and propagation. For the further application of TEUs, the design curve under the specific survival rate is required for the RD joints using TEUs. Since the fatigue strength of welded joints is highly scattered, the design curves derived by using the limited test data only are not reliable enough to be used as the reference. On this ground, an experiment-numerical hybrid approach is employed. Basing on the fatigue test, a probabilistic assessment model has been established to predict the fatigue strength of RD joints. In the model, the randomness in material properties, initial flaws and local geometries has been taken into consideration. The multiple-site initiation and coalescence of fatigue cracks are also considered to improve the accuracy. Validation of the model has been rigorously conducted using the test data. By extending the validated model, large-scale databases of fatigue life could be generated in a short period. Through the regression analysis on the generated database, design curves of the RD joint have been derived under the 95% survival rate. As the result, FAT 85 and FAT 110 curves with the power index m of 2.89 are recommended in the fatigue evaluation on the RD joint using TEUs in terms of nominal stress and hot spot stress respectively. Meanwhile, FAT 70 and FAT 90 curves with m of 2.92 are suggested in the evaluation on the RD joint using CUs in terms of nominal stress and hot spot stress, respectively.

Development of Bridge Expansion Joint for Fiber Reinforced Polymer Deck (FRP바닥판용 신축이음장치 개발)

  • Lee, Young-Ho;Park, Jong-Sup
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.2
    • /
    • pp.348-353
    • /
    • 2007
  • This paper presents design specifications and characteristics of bridge expansion joints to develop new type-joints in fiber reinforced polymer decks. Based on properties of the fiber reinforced polymer decks and fundamental process to calculate their expansion length, new expansion joints fur fiber reinforced polymer decks on typical steel or concrete girder are developed and proposed.

  • PDF

A Study on the Development of the Rock Blastability Classification and the Methods for Minimizing Overbereak in Tunnel (터널 굴착면 여굴 최소화를 위한 발파암 분류(안) 및 공법 개발 연구)

  • 이태노;김동현;서영화
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.303-310
    • /
    • 2002
  • Overbreak occurred inevitably in a tunnel excavation, Is the main factor for increasing cost and time in tunnel projects. Furthermore the damage to the remained rock mass related to the overbreak can give rise to a serious safety problem in tunnels. As a rule of thumb, causes for the overbreak are inaccuracy in drilling, the wrong design of blasting and selection of explosives, and heterogeneity in rock mass. Specially, the geological features of the rock mass around periphery of an excavation are very important factors, so a lot of researches have been conducted to describe these phenomena. But the quantitative geological classification of the rock mass for the overbreak and the method for decreasing the amount of the overbreak have not been established. Besides, the technical improvement of the charge method is requested as explosives for the smooth blasting have not functioned efficiently. In this study, the working face around periphery of an excavation has been continuously sectionalized to 5∼6 parts, and the new Blastability Index for the overbreak based on 6 factors of RMD(Rock Mass Description), UCS(Uniaxial Compressive Strength) JPS(Joint Plane Spacing), JPO(Joint Plane Orientation), JPA(Joint Plane Aperture) and FM(Filling Material) is proposed to classify sections of the working face. On the basis of this classification, the distance between contour holes and the charging density are determined to minimize the overbreak. For controlling the charging density and improving the function of explosives, the New Deck Charge(N.D.C) method utilizing the deck charge method and detonation transmission in hole has been developed.

  • PDF

A Study on Construction Method for Joints between Old and New Concrete Deck Slabs (콘크리트 교량 바닥판 신구접합부의 시공방안에 관한 연구)

  • Paek Nak Seung;Choi Young Chul;Cha Soo Won;Oh Byung Hwan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.363-366
    • /
    • 2005
  • When widening or repairing concrete deck slab, there is a joint inevitably. However, joining-construction method have following problem, that is the additional stress in existing part of bridge resulting from the specific process of joining-construction and the difference of amount of shrinkage between new and existing bridge. On this study, compared shrinkage stress of the direct joining construction method with the indirect joining construction method, and concluded the proper substitution rate of expansion cement. The rate of replacement was proper at $10\%$. but more than $15\%$, concrete had excessive expansion and weeker compressive strength. The time of placing closure concrete, considering the shinkage stresses and creep, was suitable in $45\~60$ days after placing the new concrete deck slab.

  • PDF

Track Longitudinal Irregularities at Bridge Deck Expansion Joint with ZLR(Zero Longitudinal Restraint) (활동체결장치가 설치된 교량상판 신축이음부에서의 궤도고저틀림에 미치는 영향)

  • Eom, Jong-Woo;Kim, Si-Chul;Kim, In-Jae
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1093-1098
    • /
    • 2007
  • In designing the high-speed railroad track, it is important to utilize appropriate track components to maintain uniform stiffness and ensure track alignment within the tolerance set for that system. In this regard, continuous welded rails (CWRs) were introduced to the Korean railways. Yet the installation of CWRs can result in an adverse impact due to the track/structure interaction on bridge sections yielding variations in the stiffness at the expansion joints. It may also impose additional axial force, generate excessive stress or deflection on track, and loosen the ballast at the ends as a bridge deck contracts or expands owing to a thermally-induced dynamic response. The risk is even greater in a long bridge deck, resulting in track longitudinal irregularities, deteriorating passenger's comfort, and increasing maintenance efforts. This study evaluates the performance of ZLR and their impact on track longitudinal irregularities through the track measuring results on a test section installed the ZLR in order to minimize the thermally-induced responses and the maintenance efforts for the high speed railway bridges.

  • PDF

A Study on the Fatigue Strength of a Welded Joint with Misalignment of a U-type Trough Rib in a Steel Deck Plate (강상판(鋼床版) U형(形) 트라프리브 단차용접(段差熔接)이음부(部)의 피로강도(疲勞强度)에 관(關)한 연구(硏究))

  • Lee, Dong Uk;Seo, Won Chan
    • Journal of Korean Society of Steel Construction
    • /
    • v.8 no.3 s.28
    • /
    • pp.13-20
    • /
    • 1996
  • With the adoption of welded joints rather than bolted joints, we investigate the fatigue strength and the fatigue crack initiation of U-type trough rib and welded specimen with misalignment in a steel deck plate. The stress concentration factor of welded specimens with a misalignment is also verified by a finite element method. The main conclusions obtained from this study are as follows Experimental results of full-scaled U-type trough rib models have indicated that fatigue life depends on misalignments of welded joints in steel deck plate ; The more misalignments are, the less the fatigue life is. It has also shown that fatigue crack propagates from the welded root to the bead surface. We have also obtained the same results from both the fatigue test of welded specimens with a misalignment and the stress analysis of a finite element method.

  • PDF

Development of Precast deck Joint System (새로운 형식의 Precast 바닥판 연결방법 개발)

  • 주봉철;김영진;김병석;류형근;김덕진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.469-474
    • /
    • 2003
  • Recently, to overcome the disadvantages of RC decks, advanced countries such as Japan and USA, and Europe are using prestressing connection precast decks and loop connection precast decks. The prestressing connection precast deck, however, has a weakness against steel corrosion, because of unreliable enforced grouting. The relatively low loading and fatigue capacities of the loop connection precast deck make it difficult to be used for the bridge that requires high fatigue resistance due to the frequent over loaded vehicles. This research proposes the improved connecting method for the precast decks to minimize its shortcomings based on both numerical analyses and full scale model tests. The proposed method maximizes the advantages of precast decks and extends it's service life.

  • PDF

Fatigue Tests on Transverse Joints of Precast Prestressed Concrete Bridge Deck (프리스트레스를 도입한 프리캐스트 콘크리트 교량 바닥판의 연결부에 관한 피로실험)

  • 정철헌;김영진;장성욱;김철영;심창수
    • Magazine of the Korea Concrete Institute
    • /
    • v.10 no.5
    • /
    • pp.159-165
    • /
    • 1998
  • 중트럭 통행으로 인한 철근콘크리트 교량바닥판의 열화는 교량구조물을 유지보수하는데 있어 심각한 문제 중 하나이며, 프리캐스트 바닥판을 이용한 교량바닥판의 시공 및 교체 방법이 실용적이며 효과적인 방법으로 인식되고 있다. 본 연구에서는 횡방향 ddusruf부에 종방향 프리스트레싱을 도입한 프리캐스트 바닥판의 모델을 제작하여 바닥판간 횡방향 연결부의 강성 평가 및 연결부의 피로 거동을 파악하기 위해서 피로실험을 수행하여 피로하중하에서의 휨강성의 변화, 균열발생 및 파괴하중 등을 측정하였다. 실험결과를 통해서 피로하중하에서 프리스트레스 프리캐스트 부재의 프리스트레스 효과를 평가하였으며, 현장타설에 의해서 시공되는 일반 RC 부재에 비해서 우수한 구조적 거동을 보여주는 적정량의 종방향 프리스트레스 크기를 결정하였다.

Evaluation on Structural Performance of Joint with Asymmetric Ribbed Connection Details used in Precast Bridge Deck (비대칭 격벽단면을 갖는 프리캐스트 바닥판 이음부의 구조성능 평가)

  • Chung, Chul-Hun;Byun, Tae-Kwan;Kim, In-Gyu;Shin, Dong-Ho;Lee, Han-Joo
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.2
    • /
    • pp.159-167
    • /
    • 2017
  • A precast concrete deck system is considered an effective alternative in terms of its rapid construction and quality assurance than cast-in-place concrete deck. In precast concrete deck system, structural performance and serviceability are mostly determined by the connection methods between the precast decks. This research proposes more improved precast deck system with asymmetric ribbed connection details improving the disadvantage of previous precast deck system such as difficulties in assembling precast decks. And in this precast deck system, a separate form is not required at the site because partition wall of the precast decks serves as a form when placing non-shrinkage mortar in the connection part of the precast decks. Therefore, rapid construction is possible. Flexural performance is verified through load tests considering main parameter such as rib length in the precast deck connection. From the test results, it can be inferred that the development of the rebar and prevention of adhesion failure in the partition wall of the precast deck system are important factors in securing the flexural performance. Although the structural performance of the precast deck system with asymmetric connection details is gradually reduced as the rib length in the precast deck connection increases, the proposed precast deck system shows sufficient flexural performance and can be applied to the connection part of precast decks effectively.