• 제목/요약/키워드: daylight collapse

검색결과 2건 처리시간 0.016초

고속도로 터널막장 천단부의 붕락구간에 대한 지반보강 (The Ground Reinforcement on Daylight Collapsed Block of Crown Head in the Face of the Tunnel of Highway)

  • 천병식;정덕교;한기식;정진교
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.323-330
    • /
    • 1999
  • Daylight collapse have been occurred by about 5.0m deep at ground surface and collapse of the crown head part of the tunnel have connected to the ground surface during first step of shotcrete work after blasting of upper half section of the tunnel driving at two-way double track tunnel face section on highway construction. This study is for a successful illustration case for the earth improvement method through applying such strengthening methods as cement milk grouting, S.G.R grouting,, steel pipe reinforced multi-step grouting etc. for the purpose of earth strengthening of loosened earth block occurred by tunnel collapse.

  • PDF

국도 3호선 터널건설 공사 중 붕락구간에 대한 지반보강 (The Ground Reinforcement on Daylight Collapsed Block in Driving Work at the National Road No. 3 Line)

  • 천병식;정덕교;이태우;정진교
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 연약지반처리위원회 학술세미나
    • /
    • pp.14-22
    • /
    • 1999
  • Daylight collapse have been occurred by about 6.$^{0}$ m deep at ground surface which connected to the ground surface and excessive overbreak have been occurred by the space and height of 3.$^1$~6.$^2$m at crown head part of the tunnel during tunnelling of lower-half part after completing upper-half part on tunnelling of a phyllite mountain by NATM method at the construction work of two way-double track national road. This study is a successful illustration case of earth improvement by confirming structural safety of the tunnel in a whole through solving the cause of the tunnel collapse and the work have completed successfully through applying such earth strengthening method as cement mortarㆍcement milk injection, S.G.R, steel pipe reinforced multi-step grouting etc.

  • PDF