• Title/Summary/Keyword: dam safety

Search Result 347, Processing Time 0.035 seconds

A STUDY ON THE SAFETY ANALYSIS OF ROCK FILL DAM (1) (필댐의 안정성 해석 연구 (1))

  • HoWoongShon;DaeKeunLee
    • Journal of the Korean Geophysical Society
    • /
    • v.6 no.3
    • /
    • pp.165-177
    • /
    • 2003
  • The purpose of this paper is to analyze the behavior and to study the safety evaluation of the Unmun Dam located in Cheongdo-Gun of GyeongBuk Province, Korea. For this purpose, soil analyses including boring data, geophysical surveys were conducted. In this paper, especially many geophysical methods were adopted to configure out the subsurface situation of dam. Applied geophysical methods were: 1) electric resistivity survey, 2) high frequency magnetotelluric (HFMT) survey, 3) ground penetrating radar (GPR) survey, 4) seismic refraction survey, 5) seismic cross-hole tomography survey, and 6) high frequency impedance (ZHF) survey. Each of geophysical surveys were analyzed and joint analyses between geophysical surveys were also performed to deduce the more reliable subsurface information of Dam by using the features and characteristics of each geophysical survey. Since many defects, such as gravel and weathered rock blocks in the dam core, and lots of amounts of leakage, by boring analyses were found, reinforcement by compaction grouting system (CGS) has been conducted in some range of dam. Some geophysical data and data of geotechnical gauges were also used to confirm the effects of reinforcement. Electric resistivity, EM, GPR, ZHF, seismic refraction and seismic tomography surveys show that left side of dam is weak, which means the possibility of existence of gravel, rock block, water and cavities in the core of dam. This result coincides with the boring data. Especially, electric survey after reinforcement shows that even the right side of the dam has been deformed by the strong pressure during the reinforcement itself. As a conclusion, some problems in the dam found. Especially, the dam near spillway shows the high possibility of leakage. It should be pointed out that only the left side of he dam has not a leakage problem. As a whole, the dam has problems of weakness, because of unsatisfactory construction. It is strongly recommended that highly intensive monitoring is required.

  • PDF

Analysis of Geophysical and Geotechnical SPT Data for the Safety Evaluation of Fill Dam (필댐 안정성 평가를 위한 물리탐사와 SPT 자료의 분석)

  • Oh, Seok-hoon;Sun, Chang-Guk
    • Journal of the Korean Geophysical Society
    • /
    • v.7 no.3
    • /
    • pp.171-183
    • /
    • 2004
  • Electrical resistivity survey is widely used to investigate the stability of center-core type fill dam against the seepage phenomenon. In this study, we analyze the resistivity information obtained on a earth fill dam and compare it with the geotechnical SPT result. The analysis shows that the zones showing low resistivity value generally have low N value. However, some zones with high resistivity pattern do not accompany the increase of N value, and even showing low N value. These results imply that the direct identification of resistivity value to the real status of the core material of fill dam is impossible, and a highly resistive zone may be in serious status due to the effect increasing the resistivity value by the piping condition. Therefore, multiple exploration should be planned to reduce the uncertainty in application of geophysical methods to dam safety evaluation.

  • PDF

Safety estimation of check dam in Muju region according to debris yield (토사유출에 따른 무주지역 사방댐의 안전성 평가)

  • Kwon, Hyuk Jae;Kim, Hyeong Gi
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.11
    • /
    • pp.915-924
    • /
    • 2021
  • In this study, the probability of exceeding capacity for 4 check dams in Muju mountain region have been estimated. From the results, optimum design of check dam and safety according to wild fire have been discussed. Reliability model has been established by using MSDPM for calculating debris yield to estimate the probability of exceeding capacity of check dam. Probability of exceeding capacity for 4 check dams has been estimated according to maximum rainfall intensity of return periods (10year, 50year, 100year, and 200year). It was found that 1 check dam of Samga-ri basin and 1 check dam of Jeungsan-ri basin were designed by overestimation and 61% and 47% of capacity should be reduced, respectively. Furthermore, probability of exceeding capacity according to burned area has been estimated and compared. It was found that check dam of Sanga-ri basin is the weakest for the wild fire effect in this study area.

Prediction of Water Level at Downstream Site by Using Water Level Data at Upstream Gaging Station (상류 수위관측소 자료를 활용한 하류 지점 수위 예측)

  • Hong, Won Pyo;Song, Chang Geun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.28-33
    • /
    • 2020
  • Recently, the overseas construction market has been actively promoted for about 10 years, and overseas dam construction has been continuously performed. For the economic and safe construction of the dam, it is important to prepare the main dam construction plan considering the design frequency of the diversion tunnel and the cofferdam. In this respect, the prediction of river level during the rainy season is significant. Since most of the overseas dam construction sites are located in areas with poor infrastructure, the most efficient and economic method to predict the water level in dam construction is to use the upstream water level. In this study, a linear regression model, which is one of the simplest statistical methods, was proposed and examined to predict the downstream level from the upstream level. The Pyeongchang River basin, which has the characteristics of the upper stream (mountain stream), was selected as the target site and the observed water level in Pyeongchang and Panwoon gaging station were used. A regression equation was developed using the water level data set from August 22th to 27th, 2017, and its applicability was tested using the water level data set from August 28th to September 1st, 2018. The dependent variable was selected as the "level difference between two stations," and the independent variable was selected as "the level of water level in Pyeongchang station two hours ago" and the "water level change rate in Pyeongchang station (m/hr)". In addition, the accuracy of the developed equation was checked by using the regression statistics of Root Mean Square Error (RMSE), Adjusted Coefficient of Determination (ACD), and Nach Sutcliffe efficiency Coefficient (NSEC). As a result, the statistical value of the linear regression model was very high, so the downstream water level prediction using the upstream water level was examined in a highly reliable way. In addition, the results of the application of the water level change rate (m/hr) to the regression equation show that although the increase of the statistical value is not large, it is effective to reduce the water level error in the rapid level rise section. Accordingly, this is a significant advantage in estimating the evacuation water level during main dam construction to secure safety in construction site.

Strain-based seismic failure evaluation of coupled dam-reservoir-foundation system

  • Hariri-Ardebili, M.A.;Mirzabozorg, H.;Ghasemi, A.
    • Coupled systems mechanics
    • /
    • v.2 no.1
    • /
    • pp.85-110
    • /
    • 2013
  • Generally, mass concrete structural behavior is governed by the strain components. However, relevant guidelines in dam engineering evaluate the structural behavior of concrete dams using stress-based criteria. In the present study, strain-based criteria are proposed for the first time in a professional manner and their applicability in seismic failure evaluation of an arch dam are investigated. Numerical model of the dam is provided using NSAD-DRI finite element code and the foundation is modeled to be massed using infinite elements at its far-end boundaries. The coupled dam-reservoir-foundation system is solved in Lagrangian-Eulerian domain using Newmark-${\beta}$ time integration method. Seismic performance of the dam is investigated using parameters such as the demand-capacity ratio, the cumulative inelastic duration and the extension of the overstressed/overstrained areas. Real crack profile of the dam based on the damage mechanics approach is compared with those obtained from stress-based and strain-based approaches. It is found that using stress-based criteria leads to conservative results for arch action while seismic safety evaluation using the proposed strain-based criteria leads to conservative cantilever action.

The Comparison of Behavior by Instrumentation and Numerical Analysis on Non-Weir Concrete Dam (콘크리트댐 비월류부 수치해석과 계측결과 비교)

  • 임정열;오병현
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.392-395
    • /
    • 2003
  • In this study was compared with result of instrumentation and numeral analysis of non-weir of concrete dam to prepare a plan for total safety estimation method such as reliability estimation of numerical analysis result, characteristics of dam behavior and etc. The results of instrument analysis of displacement and stress on N.H.W.L was similar to that of numeral analysis.

  • PDF

Examination of 3D long-term viscoplastic behaviour of a CFR dam using special material models

  • Karalar, Memduh;Cavusli, Murat
    • Geomechanics and Engineering
    • /
    • v.17 no.2
    • /
    • pp.119-131
    • /
    • 2019
  • Time dependent creep settlements are one of the most important causes of material deteriorations for the huge water structures such as concrete faced rockfill dams (CFRDs). For this reason, performing creep analyses of CFRDs is vital important for monitoring and evaluating of the future and safety of such dams. In this study, it is observed how changes viscoplastic behaviour of a CFR dam depending the time. Ilısu dam that is the longest concrete faced rockfill dam (1775 m) in the world is selected for the three dimensional (3D) analyses. 3D finite difference model of Ilısu dam is modelled using FLAC3D software based on the finite difference method. Two different special creep material models are considered in the numerical analyses. Wipp-creep viscoplastic material model and burger-creep viscoplastic material model were rarely used for the creep analyses of CFRDs in the last are taken into account for the concrete slab and rockfill materials-foundation, respectively. Moreover, interface elements are defined between the concrete slab-rockfill materials and rockfill materials-foundation to provide interaction condition for 3D model. Firstly, dam and foundation are collapsed under its self-weight and static behaviour of the dam is evaluated for the empty reservoir conditions. Then, reservoir water is modelled considering maximum water level of the dam and time-dependent creep analyses are performed for maximum reservoir condition. In this paper, maximum principal stresses, vertical-horizontal displacements and pore pressures that may occur on the dam body surface during 30 years (from 2017 to 2047) are evaluated in detail. According to numerical analyses, empty and maximum reservoir conditions of Ilısu dam are compared with each other in detail. 4 various nodal points are selected under the concrete slab to better seen viscoplastic behaviour changes of the dam and viscoplastic behaviour differences of these points during 30 years are graphically presented. It is clearly seen that horizontal-vertical displacements and principal stresses for maximum reservoir condition are more than the empty reservoir condition of the dam and significant pore pressures are observed during 30 years for maximum reservoir condition. In addition, horizontal-vertical displacements, principal stresses and pore pressures for 4 nodal points obviously increased until a certain time and changes decreased after this time.

Safety Index Evaluation from Resistivity Monitoring Data for a Reservoir Dyke (전기비저항 상시관측에 의한 제체 안전도 지수 산출)

  • Cho, In-Ky;Kang, Hyung-Jae;Lee, Byoung-Ho;Kim, Byoung-Ho;Yi, Sang-Sun;Park, Young-Gyu;Lee, Bo-Hyun
    • Geophysics and Geophysical Exploration
    • /
    • v.9 no.2
    • /
    • pp.155-162
    • /
    • 2006
  • An abnormal seepage flow, which is mainly caused by the piping, is one of the major reasons for embankment dam failure. A leakage detection is therefore a vital part of an embankment dam's monitoring. Resistivity method, which is an efficient tool to detect leakage zones, has been used all over the world for an embankment dam's monitoring. Although the resistivity method gives us very useful information about the leakage problem, there is no more quantitative interpretation than the low resistivity zones in the 2-dimensional resistivity section are regraded simply as the anomalous seepage zones. Recently, resistivity monitoring technique is applied for the detection of leakage zones. However, its interpretation still remains in the stage of presenting the resistivity ratio itself. An increased seepage flow increases a porosity and an increasing porosity decreases the dam's stability. Therefore, the porosity is one of the major factors for an embankment dam's stability. Based on Archie's experimental formula, we try to evaluate a porosity distribution from the resistivity data which is obtained on the dam's crest. We also attempt to represent a procedure to evaluate a safety index of the embankment dam from the resistivity monitoring data.

Slops Stability Analysis of Carsington Dam (Carsington 댐의 사면안정 해석)

  • 손준익;안상로
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.75-86
    • /
    • 1991
  • In this paper the failure of Carsington Dam was discussed based on the informations reported in the first edition of Korean Geotechnical Society News. The causes of dam failure and its influences were evaluated based on the results of the slope stability analysis. The effects of the shear strain pre-existing in the yellow clay disclosed by the post-failure site investigation and the progressive nature of the dam failure were preponderantly evaluated. Stability analysis was performed based on the proposed values of strength parameters characterizing possible field ground conditions at failure. The calculated safety factors were evaluated for different cases of strength parameters in order to find the most probable field ground condition at the dam failue.

  • PDF

Analysis of Small reservoir system by Flood control ability augmentation (치수능력 증대에 따른 저수지시스템 분석)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.14 no.11
    • /
    • pp.995-1004
    • /
    • 2005
  • As a research establish reservoir safety operation for small dam systems. This study presents hydrologic analysis conducted in the Duckdong and Bomun dam watershed based on various rainfall data and increase inflow. Especially the Duckdong dam without flood control feature are widely exposed to the risk of flooding, thus it is constructed emergency gate at present. In this study reservoir routing program was simulation for basin runoff estimating using HEC-HMS model, the model simulation the reservoir condition of emergency Sate with and without. At the reservoir analysis results is the Duckdong dam average storage decrease $20\%$ with emergency gate than without emergency gate. Also, the Bomun dam is not affected by the Duckdong flood control augmentation.