• Title/Summary/Keyword: curtain-wall work

Search Result 19, Processing Time 0.026 seconds

Development and comparative analysis of slat angle control algorithm of venetian blind according to window-to-wall ratio and zone orientation (창면적비 및 향변화에 따른 슬랫형 블라인드의 최적각도 제어 알고리즘 산출 및 비교분석)

  • Kwon, Hyuk-Ju;Lee, Keum-Ho;Lee, Kwang Ho
    • KIEAE Journal
    • /
    • v.17 no.4
    • /
    • pp.75-81
    • /
    • 2017
  • Purpose: Most contemporary office buildings supply external views, a sense of openness and a sense of time to their occupants by adopting the curtain walls, which are equipped with an outer cover having large window area. As a result, the amount of radiation increases, adversely affecting cooling load during the summer in office buildings. Although solar radiation decreases heating load and reduces energy costs during the winter period, due to the characteristics of offices where occupants work largely during daytime, the cooling load is important compared to the heating. Therefore, diverse measures to resolve those trade-offs and annual energy cost have been investigated. Method: In this study, the annual thermal load was comparatively analyzed according to the slat angle of the venetian blind along with lighting control technique. Result: After selecting effective conditions, in order to resolve such issues, this study established automated control strategies of slat angle depending on the window-to-wall ratio and zone orientation, so that the findings of this study can be effectively generalized to other circumstances.

Assessing the Impact of RFID based materials tracking - Focusing on Curtain-Wall Work - (RFID 기반 물류 관리의 적용 효과 분석 - 커튼월 공사를 중심으로 -)

  • Yoon, Su-Won;Chin, Sang-Yoon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.24-35
    • /
    • 2012
  • RFID-based logistics is increasingly adopted in various areas of the construction industry as a technology that can improve effectiveness and efficiency of construction logistics. However, the technology is not widely adopted yet compared to the potential of RFID applications in the construction industry that the existing research has shown. Since the validation and verification of the benefit from RFID applications were biased toward the productivity of managers, more wide aspect of validation and verification is necessary. Therefore, the objective of this paper is to show how much impact the RFID-based logistics management system can have on resource leveling and allocation that have a direct impact on a construction project as well as the managers' productivity improvement that was shown by the existing research. This paper also discusses issues arisen during the test process.

Economic Analysis on the Built-in Guide Rail Type Building Facade Cleaning Robot (건축물 외벽용 가이드레일 청소 로봇의 경제성 분석)

  • Kim, Kyoon-Tai;Han, Jae-Goo;Kim, Chang-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.157-159
    • /
    • 2012
  • In recent years, the number of high-rise buildings has been on the rise. As buildings have become larger in scale, significantly different issues related to their construction and maintenance have emerged. In addition, the automation and mechanization of the cleaning work for the curtain wall, one of the most frequently-performed tasks in building maintenance, is required as a fundamental measure. For this reason, a guide-rail type cleaning robot system is emerging as one of the measures in response to external factors, including gust. The major objective of this study is to propose an economic feasibility forecasting model and to apply the a building facade cleaning robot which is now under development.

  • PDF

Scheduling Risk Management at the Preconstruction Phase (공사 착공 전 단계의 공정리스크 대응방안)

  • Park Ji-Hoon;Kim Sun-Kuk;Han Choong-He
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.457-461
    • /
    • 2004
  • The insufficient management o( the risk of preconstruction phase causes the risk of construction phase so it makes bad effects such as the extension of construction time and raising of cost. Therefore, the management of the risk of preconstruction phase is being considered as an important element of success of project and the competitive power of construction companies. This study Is to suggest solution methods for each progress after examining reasons of the risk for the management of the risk of preconstruction phase 1'he progress is limited as earth work, RC work, steel work and curtain wall work. Through the introduction of Knowledge Management system, work flow is made by specialist of each part. The reasons of the risk of progress are chosen through the analysis of work flow and I suggest detailed solutions such as person in charge, the starting point of progress and the information of requirements according to the grade of importance about elements of the risk

  • PDF

Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

Exploring Effective BIM Workflow Among Practitioners by Technology Acceptance Model: A Case Study on the Construction of Facade

  • Guo, Jingjing;Yang, Jinze;Peng, Senlin;Mao, Chao
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.201-209
    • /
    • 2017
  • Facade structure system plays an important role in modern architecture and design. Many contractors start using Building Information Modeling (BIM) to help design and lay-out façade walls in recent years. However, there are still some users refuse to accept BIM on façade construction. Therefore, we employed Technology Acceptance Model (TAM) to assess the users acceptable of BIM work flow, with using a practical case of facade construction in Chongqing Wanda City. The factors that will affect the builder's decision of whether using BIM or not when construct façade, and the relationship among them will be found via this model. Through the analysis using TAM, this research found that the direct factors influencing the completely acceptance of BIM in façade construction is the BIM quality and Result Demonstrating, and the parameter impacting the intuition engendering is the Exterior Condition. Therefore, this paper proposes a more systemic model of BIM acceptance in curtain wall to analyze the user's acceptance. The solution can also offer a reference for future research and construct on façade structure. The acceptance model has the significance that it can help to analyze the reason why users refuse to use BIM in façade construction, thus to help users accept BIM.

  • PDF

A DEVELOPMENT OF RFID/USN-BASED INTELLIGENT EQUIPMENT FOR CONSTRUCTION SUPPLY CHAIN MANAGEMENT

  • Tae-Hong Shin;Su-Won Yoon;Sangyoon Chin;Soon-Wook Kwon;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.472-478
    • /
    • 2009
  • The scopes of the supply chain management in construction projects has expanded from the field management focusing on field storage, transportation, and lifting to the whole supply chain from the materials to field. The expansion of the supply chain management can raise the possibilities of leaner production, which enables shortened lead time of the difficult-to-operate materials, and prevents the work interference or delay. However, the expanded management range requires more information and management than an existing management style currently used for factory production of iron frame, curtain wall, PC, etc. In addition, there are limitations that expand the existing management style into the new supply chain management in construction projects and therefore it is required to automate the existing management style in order to extend the management range. The objective of this study is to propose the process and equipment that can manage the supply chain of the materials which range from the factory production to the field storage based on RFID/USN techniques, introducing small-sized transportation equipment(intelligent pallet), the vehicle tool kit(intelligent trailer), and in-and-out management equipment(Gate Sensor) as a prototype to effectively develop the appliances for operating the proposed process, and present the application possibility of the appliances. The full paper will present then the test results that the proposed appliances for the supply chain management automatically transmit and receive the generated information between the appliances or the appliance and sever under various wireless network circumstances such as zigbee, wibro, Wi-Fi, and CDMA.

  • PDF

Current on the Heat Loss in Greenhouses during Winter Season - Case Study Based on Gyeongnam Area - (동절기 온실의 열 손실에 관한 실태조사 - 경남지역을 중심으로 -)

  • Im, Jae Un;Yun, Sung Wook;Kim, Hyeon Tae;Yoon, Yong Cheol
    • Journal of Bio-Environment Control
    • /
    • v.22 no.1
    • /
    • pp.73-79
    • /
    • 2013
  • An experiment was conducted to study incidences of heat loss in greenhouse in Gyeongnam province using thermal imaging camera in order to determine ways minimizing greenhouse heat loss. Measurements of this work showed that temperature differences between two experiment zones before and after installation of thermal curtains were about $2.0{\sim}3.0^{\circ}C$ and $1.0{\sim}2.0^{\circ}C$ respectively. There was a high correlation between the temperature data measured using a thermal imaging camera and a temperature sensor. There was no serious difference among areas, but between places on the first and second floor with thermal curtains for heat insulation, there was a relatively larger heat loss on the first floor than the second floor. Then in general the greenhouse types had no particular bearing on this matter, there was a relatively large heat loss in the parts of side wall window, the gaps and the parts folded of horizontal thermal curtains, the gutter parts, and the gaps of thermal curtain in the side wall window and facade back side for heat insulation, aren't completely sealed. It was found that there was a substantial heat loss due to infiltration through cracks on covering material, doors, ventilating openings, roof gables and floors, in particular.