• Title/Summary/Keyword: crisis management system

Search Result 331, Processing Time 0.022 seconds

Research on the Convergence of CCTV Video Information with Disaster Recognition and Real-time Crisis Response System (CCTV 영상 정보와 재난재해 인식 및 실시간 위기 대응 시스템의 융합에 관한 연구)

  • Kim, Ki-Bong;Geum, Gi-Moon;Jang, Chang-Bok
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.3
    • /
    • pp.15-22
    • /
    • 2017
  • People generally believe that disaster forecast and warning systems and response systems are well established in the age of cutting edge technology. As a matter of fact, reliable systems to respond to disasters are not properly equipped, as we witnessed the Sewol ferry disaster in 2014. The existing forecast and warning systems are based on sensor information with low efficiency, and image information is only operated by monitoring staff manually. In addition, the interconnection between a warning system and a response system in order to decide how to cope with the recognized disaster is very insufficient. This paper introduces the CCTV based disaster recognition and real time crisis response system composed of the CCTV image recognition engine and the crisis response technique. This system has brought the possibility to overcome the limitations of existing sensor based forecast and warning systems, and to resolve the problems in the absence of monitoring staff when responding to crisis.

A Study of Corporate CSR Effects on Corporate Crisis Management

  • LEE, Jae-Min;QUAN, Zhixuan
    • The Journal of Economics, Marketing and Management
    • /
    • v.8 no.2
    • /
    • pp.13-17
    • /
    • 2020
  • Purpose: In modern corporate management, the establishment of a crisis management system that minimizes damage through measures used to respond to corporate crises is no longer an option. The importance of corporate reputation and brand asset management in modern enterprise management cannot be overemphasized and negative events that might arise from a number of different causes can cause brand crises. Research design, data and methodology: More than half of the questionnaire respondents were female (252 or 53%). More than a fourth of the respondents were aged 20 (122 or 26%) and the number of married participants was 196 (41%). Of the participants, 32% (153) had graduated from college. Only 18% (87) were employees and the monthly household income was 121. In this study, we conducted factor analysis in order to extract the variables that may enhance the explanation capability of each variable. For the method of factor extraction, an Eigen value of at least 1 was used as was factor loading. An analysis was performed using the Cronbach's alpha coefficient to verify the reliability of the measurement scale. Results: First, the analysis of the impact of the social responsibility activities on brand image revealed that the social, economic, philanthropic, ethical, and environmental responsibility activities significantly affected brand image, but legal responsibility activities were not statistically significant. Second, the analysis of the impact of brand image on loyalty showed that brand image had a significant impact on loyalty. Third, the analysis of the impact of social responsibility activities on loyalty showed that they had a significant impact on loyalty. Conclusions: The pro-social enterprise image is not only a brand asset that can be shared, but also a heavy proposition followed by a corresponding social responsibility, it will have to practice transparent corporate management based on clear principles through the establishment of various systems and the implementation of a strict code of conduct within the enterprise.

ESTABLISHMENT OF CONSTRUCTION INDUSTRY CREDIT GUARANTEE SYSTEM-BASED ON TAIWAN'S CONSTRUCTION INDUSTRY

  • Ting-Ya Hsieh;Tsung-Shi Liu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.399-406
    • /
    • 2011
  • Various construction bonds and warranties critically burden the general contractor. Also, sporadic or cumulative delays of progress payment by the owner can further trap the contractor in a financial quagmire. Facing the possibility of cash flow deficiency and callous response from the banks, most construction firms may become financially incapable of market competition, and attractive project tenders become a bidding game among few deep-pocket players. The downside of such market environment is that the depth of pocket, rather than that of professional competency dictates the choice of market winners. In Taiwan, this has been a potential crisis to the construction industry after the financial crisis which started out since 2008. To encounter this problem, this research will examine the means to better manage the construction industry. Essentially, a credit guarantee system (CGS) is the prime solution to strengthen a bank's confidence in any particular construction firm. Thus establishing a national platform which evaluates and rewards a construction firm's overall credibility is pivotal, and this third-party rated credit can help a bank to render a loan more wisely. Finally, this paper will propose the ideal operating schemes of construction-specific CGS in Taiwan and a credit scoring prototype model for construction industry, as reference for the government and banks, respectively.

  • PDF

Development of Open Water Management Program(OWMP) for Water Management Automation System with Open Architecture (물관리자동화시스템을 위한 개방형 운영 프로그램 개발)

  • 김선주;김필식;윤찬영;박재홍
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.43 no.5
    • /
    • pp.83-92
    • /
    • 2001
  • As a result of the recent water resources crisis, development of water management automation system becomes important. This system should be developed with open architecture in order to flexibly meet the spacial and time change of irrigation water demand. Thereby, water management automation system requires open architecture and suitable software program. This study presents an application of object-oriented methodology for Open Water Management Program(OWMP). Accordingly, OWMP provides a high degree of reliability which allows modification of parameters by change of region or time to be possible. OWMP consists of Data Base Management System(DBMS) and Model System. DBMS makes it possible to analyze data related with planning water schedule and establishing database. Model System calculates reservoir inflow, reservoir effluent and basin water demand. An operator decides the reservoir operation with results of Model System and DBMS. OWMP could be adapted to the planning and decision for saving water.

  • PDF

A Study on the Establishment of Process Safety Management (PSM) System for Small and Medium Size Chemical Plants (중소화학공장의 공정안전관리(PSM)시스템 구축에 관한 연구)

  • Baek Jong-Bae;Ko Jae-Wook
    • Journal of the Korean Institute of Gas
    • /
    • v.3 no.1
    • /
    • pp.8-13
    • /
    • 1999
  • The article 49-2 of Industrial Safety Law requires that all the owners of industrial plants which contains dangerous facilities perform the process safety management. That is, this law requires the owners of industrial plants to take necessary measures to prevent fire, harmful gas leaking, explosion, and other serious accidents that could cause demage and injuries to the employees. So far, domestic chemical plants have tried to invest money and time in safety management. But, such efforts have been made only in chemical plants that were subsidiaries of large business groups. Moreover, since the economic crisis of Korea which is symbolized by the IMF bailout, small and medium size companies could not afford to invest in safety management. Their major concern is to increase productivity and thereby, survive in this crisis. The goal of this research is to develop the process safety management system that can help small and medium size companies to positively secure the process safety management. So, in developing the process safety management system, the financial and practical difficulties of such companies are fully taken into consideration.

  • PDF

A Study on Information Management System for Efficient Asset Management (효율적인 자산관리를 위한 정보관리 체계 구축 방안에 대한 기초연구)

  • Kim, Do-Min;Seo, Hee-Chang;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.121-123
    • /
    • 2012
  • Since the financial crisis in 1997, the paradigm in property has been changed. So the domestic asset management market was generated and developed. While developing the asset management, however, there were a variety of problems about management of property information and asset management specialist shortage. For effective property management, this study propose the strategy of making information management system.

  • PDF

Common Business Analysis of Disaster and Safety Response Processes Based on Crisis Management SOP Manuals for Development of BRM (재난안전 분야 기능분류체계(BRM) 개발을 위한 위기관리 표준매뉴얼(SOP) 기반 공통업무 분석)

  • Gang, Ju-yeon;Han, Hui-jeong;Myung, Hyun;Oh, Hyo-jung
    • The Korean Journal of Archival Studies
    • /
    • no.58
    • /
    • pp.191-224
    • /
    • 2018
  • In order to effectively respond to repeated disasters, the most important thing is the systematic management of records which were produced from past disaster response processes. It is necessary to develope a business reference model(BRM) to incorporate scattered disaster safety record information resources into the record management system. In this regard, this study examined crisis management standard operation procedures(SOP) manuals and analyzed common businesses of disaster and safety response processes. Based on analysis of 28 manuals three times, 1,667 main business transactions are drawn, which are grouped by 5 middle functions and 20 small functions. Furthermore, by looking at forecast records by business type, several insight is proposed in terms of disaster and safety response business processes and of disaster and safety records management.

Modeling the Aviation Safety Risk Management (항공안전 위기관리 모형 구축에 관한 연구)

  • Hong, Seok-Jin;Kim, Yeon-Myeong
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.1 s.87
    • /
    • pp.19-28
    • /
    • 2006
  • To develop a crisis management for aviation safety, this study has defined crisis management includes risk management which is eliminates or lowers risks prior to accidents and emergency response after the accidents. This study takes a look at different kinds of crisis managements, risk managements and statistical methods of other nations and fields in order to develop a risk management model. Through surveys which have 102 risk factors that include air traffic control, maintenance and airport sectors, the weight of each risk factor was calculated and the probability was divided to develop a model for risk management. The risk management model of this study is conducted using four steps (risk management plan, risk factor identification, weight and probability analysis, decision making) and 4 standards of weight along with 5 standards of probability This study takes a look at Predictions through a quantitative method using a risk index for the risk management model An effective risk management model should have a wide and continuous collection of data and adopt various methods using this model. The crisis management could not be very effective only using a pre-active risk management. So it should also be conducted by using a pro-active response system to protect additional damage and to prevent accidents of the same nature. From the results, the most important points were the establishment of command and control accountabilities, and cooperation of related organizations.

Overcoming the Local Industrial Complex Crisis in the Era of Digital Transformation (디지털전환 시대 지방산업단지 위기 극복방안)

  • Seung-Hee Lee
    • Journal of Digital Convergence
    • /
    • v.21 no.1
    • /
    • pp.15-18
    • /
    • 2023
  • The purpose of this study is to suggest ways to overcome the crisis of regional industrial complexes by examining the changes that the digital transformation era will bring and the crisis situation of regional industrial complexes. To this end, first, we examine the changes brought about by the digital transformation era from various angles in the fields of industrial sites, industrial complexes, policy areas, and changes in working methods, and identify the problems and crises of local industrial complexes from various aspects. According to the problems and crises of these existing local industrial complexes, plans and various policy tasks were presented for local industrial complexes to overcome the crisis using digital technology. As a result of this study, important policy directions and alternatives for overcoming the crisis of local industrial complexes in stagnation are presented at the government level, and plans for strengthening self-sustainability to overcome the crisis at the corporate level and digital transformation for future local industrial complexes It was possible to look at the direction and tasks of the project from various aspects.