• 제목/요약/키워드: crest height

검색결과 156건 처리시간 0.036초

성견 1면 골결손부에서 rhBMP-2/ACS가 치주조직 치유에 미치는 영향 (The Effects of rhBMP-2/ACS on the Periodontal Healing of 1-Wall Intrabony Defects in Dogs)

  • 전혜영;조규성;김종관;채중규
    • Journal of Periodontal and Implant Science
    • /
    • 제29권4호
    • /
    • pp.873-893
    • /
    • 1999
  • The ultimate goal of periodontal therapy is the regeneration of periodontal tissue and repair of function. For more than a decade there have been many efforts to develop materials and bioactive molecule(such as growth factor and differentiation factors) to promote periodontal wound healing. Among the bioactive molecules, bone morphogenetic protein(BMP) was studied for periodontal wound healing. Since Urist demonstrated that demineralized bone matrix could induce the formation of cartilage and bone in ectopic site, many studies on BMP have been reported. Among those BMPs, it was reported that rhBMP-2 enhanced the healing of bone defects in animal studies and clinical studies. However, its efficacy in periodontal regeneration, especially 1-wall intrabony defects is still unknown. The purpose of this study was to examine the effect of rhBMP-2/ACS on the epithelial migration, gingival connective tissue adhesion, cementum formation, alveolar bone regeneration in intrabony defects of dogs. Four millimeter deep and four millimeter wide 1-wall defects were surgically created in the mesial aspects of the 3rd incisors. The test group received rhBMP-2/ACS with a flap procedure and the control underwent buffer/ACS with a flap procedure. Histologic analysis after 8 weeks of healing revealed the following results: 1. The length of epithelial growth(the distance from alveolar crest to the apical end of JE) was $0.9{\pm}1.5mm$ in the control group and $1.2{\pm}1.4mm$ in the test group. There was no statistically significant difference between the two groups. 2. The length of connective tissue adhesion was $2.4{\pm}1.3mm$ in the control group and $1.2{\pm}1.1mm$ in the test group. The control group showed significantly enhanced adhesion(P<0.05). 3. The length of new cementum was $0.9{\pm}1.0mm$ in the control group and $1.7{\pm}0.8mm$ in the test group. The test group showed significantly enhanced cementum regeneration(P<0.05). 4. The length of new bone height was $1.9{\pm}0.6mm$ in the control group and $2.4{\pm}0.9mm$ in the test group. There was no statistically significant difference between the two groups. 5. The new bone area was $4.7{\pm}1.7mm^2$ in the control group and $8.0{\pm}2.0mm^2$ in the test group. The test group showed significantly enhanced bone formed area(P<0.05). 6. The new bone density was $73.0{\pm}8.6%$ in the control group and $66.6{\pm}15.3%$ in the test group. There was no statistically significant difference between the two groups. These results suggest that the use of rhBMP-2 in 1-wall intrabony defects has significant effect on new cementum and new bone formation area, but doesn't have any significant effect on the prevention of junctional epithelium migration and new bone formation height.

  • PDF

단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산 (Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve)

  • 최귀열
    • 한국농공학회지
    • /
    • 제7권1호
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

손톱 깨물기 습관을 가진 아동의 교정 치료 시 전치부 치근 길이와 치조골 높이의 변화 (Changes of root length and crestal bone height before and after the orthodontic treatment in nail biting patients)

  • 황충주;양재홍
    • 대한치과교정학회지
    • /
    • 제34권1호
    • /
    • pp.47-61
    • /
    • 2004
  • 교정치료의 목표는 치아와 악골의 기능성과 심미성을 높이며 안정성을 도모하는 데에 있지만, 치료 과정 중에 치근 흡수와 치조골 흡수와 같은 여러 가지 후유증이 발생할 수 있다 이러한 치근첨의 흡수는 예측이 불가능하고, 상아질 부위까지 파급될 수 있으며, 발생 후 비가역적이다. 치조골 흡수는 치주 지지의 관점에서 매우 중요한 후유증이다. 이에 여러 가지 구강악습관 중 손톱 깨물기 습관을 가진 아동의 교정 치료 전, 후의 치근과 치조골 높이 변화를 고찰하여, 교정 치료 시 적절한 생역학을 고려하고, 치근흡수와 치조골 상실의 가능성에 대처하고자 본 연구를 시행하였다. 연구대상은 1997년 7월부터 1999년 2월까지 연세대학교 치과대학병원 교정과에 교정치료를 목적으로 내원한 $10\~15$세까지의 청소년 중 큰 골격 변이가 없고, 함께 내원한 부모로부터 손톱 깨물기 습관이 있다고 확인되고 전형적인 손톱 형태 -정기적인 손톱 깎는 일이 없이 치아로 손톱을 뜯는 습관으로 변연이 불규칙한 손톱의 형태 -를 가진 환자 63명을 실험군으로, 같은 연령대의 손톱 깨물기 습관이 없는 환자63명을 대조군으로 설정하였다. 교정 치료 후 실험군은 31명, 대조군은 22명이었다. 교정 치료 전(T1)과 치료 후(T2), 각 군의 전치부 치근단 방사선 사진을 채득하여 치근의 길이와 치조골의 높이를 평가하여 다음과 같은 결과를 얻었다. 1. 교정 치료 전 실험군의 평균 치관/치근 비는 상악 4전치와 하악 우측 측절치에서 대조군보다 유의성 있게 큰 값을 보여주었다. 2. 교정 치료 전 실험군의 치근 길이는 하악 양측 중절치와 상$\cdot$하악 우측 측절치에서 상대적으로 대조군보다 더 짧은 값을 보였다. 3. 교정 치료 전 실험군의 치간골에서 대조군보다 유의성 있는 상실을 보인 곳이 있었다. 4. 교정 치료 후 실험군과 대조군 모두 치근 길이의 감소와 치간골 소실이 있었다. 5. 교정 치료 후 실험군에서 모든 치아의 치관/치근 비의 변화와 치근의 길이 감소가 대조군보다 유의성 있게 크게 나타났다. 6. 교정 치료 후 실험군의 모든 치아의 치간골 높이가 대조군보다 유의성 있게 감소하였다.

Laser 반사측정법을 이용한 전치부 후방 견인시 치조골 높이와 치근길이 감소에 따른 저항중심의 위치변화에 관한 연구 (A Study about the Change of Locations of the Center of Resistance According to the Decrease of Alveolar Bone Heights and Root Lengths during Anterior Teeth Retraction using the Laser Reflection Technique)

  • 민영규;황충주
    • 대한치과교정학회지
    • /
    • 제29권2호
    • /
    • pp.165-181
    • /
    • 1999
  • 교정치료시 치아와 주위조직의 부작용을 최소로 하면서 최대의 치료결과를 얻기 위해서는 치료역학을 각 환자의 치아 및 주위 해부학적 환경에 맞도록 개인화 시켜야한다. 특히 성인 교정시 문제되기 쉬운 치근흡수 또는 치주질환으로 인한 치조골 손실로 인하여 치관/치근 비율이 변했을 때 치아의 저항중심위치의 변화와 관련된 생역학적 반응의 차이에 주의하여야 한다. 본 연구에서는 정상 치주조직뿐만 아니라 다양한 비정상적 치주 및 치아상태에서 치관/치근 비율이 변하였을 때 일정한 교정력하에서의 치아의 초기이동 양상을 연구하기 위하여, 성인의 인체 건조 두개골 및 하악골상에서 laser 반사측정법 및 lever and pulley force applicator와 photodetector를 이용하여, 상악 6전치군을 대상으로는 치조골높이를 각각의 치아에 대하여 2mm씩 총 8mm까지 감소시켰고, 하악 6전치군을 대상으로는 치근길이를 각각의 치아에 대하여 2mm씩 총6mm까지 감소시키면서, 이렇게 다양하게 정량화된 변수들 하에서 상하악6전치군의 저항중심의 위치변화를 연구한 결과 다음과 같은 결론을 얻었다. 1. 초기상태에서 상악 6전치군의 초기이동시의 저항중심점의 위치는 6전치 전체 평균치아 치근의 치경부(CEJ)로부터 치근첨 방향으로 약 $42.4\%$되는 위치에 있었으며, 각 치아의 치조골의 높이가 감소할수록 저항중심점은 치근첨방향으로 약 $76.7\%$되는 부위까지 이동하였다. 2. 상악 6전치군에서 저항중심점의 6전치 전체 평균 치조정으로부터의 거리는 치조골의 감소와 함께 지속적으로 감소하였으나, 치조골내의 평균 치근의 길이에 대한 비율은 치조골의 감소에 상관없이 약 $33\%$내외에서 비교적 일정하였다. 3. 초기상태에서 하악 6전치군의 초기이동시의 저항중심점의 위치는 6전치 전체 평균치아 치근의 CEJ로부터 치근첨방향으로 약 $43\%$되는 위치에 있었으며, 각 치아의 치근의 길이가 감소할수록 이 비율은 약 $54\%$까지 증가하였다. 그러나 CEJ로부터 저항중심점까지의 거리는 5.3mm전후로부터 3.3mm내외까지 감소하여 치근의 길이가 감소할수록 저항중심점이 CEJ방향으로 이동하였다. 4.치조골 또는 치근흡수시, 각각의 단위 흡수량에 따른 저항중심위치의 변화에 미치는 영향은 초기에는 치조골이 감소 될 때가 더 컸으나 전체 평균 치근길이의 중간부위에서의 영향은 비슷했다.

  • PDF

공기유동해석을 통한 온실내 식물군 미기상 분석기술 개발 - (2)온실내 대기환경에 미치는 작물의 영향 분석을 위한 CFD 모델개발 - (Development of an Aerodynamic Simulation for Studying Microclimate of Plant Canopy in Greenhouse - (2) Development of CFD Model to Study the Effect of Tomato Plants on Internal Climate of Greenhouse -)

  • 이인복;윤남규;;;이성현;김경원;홍세운;성시흥
    • 생물환경조절학회지
    • /
    • 제15권4호
    • /
    • pp.296-305
    • /
    • 2006
  • 변화무쌍한 기상변화가 실험의 정확도에 미치는 영향을 최대한 줄일 수 있도록 강제환기식 온실에서 실험을 하였고, 또한 대체적으로 크지 않은 온실에서의 실험으로 인하여 CFD모델결과의 오차를 크게 줄일 수 있었다. CFD와 현장실험 결과를 비교하여 본 결과, 온실내 1m높이에서의 평균풍속이 각각 $0.42m{\cdot}s^{-1}$$0.39m{\cdot}s^{-1}$으로써 CFD의 지점별 오차 평균값은 7.7% 로 나타났다. Y8.5m 지점에서 가장 큰 오차가 발생하였는데, 최대 오차는 -53.8%로 나타났다. 이의 가장 큰 이유로는 온실 길이방향에서 중간지점인 Y8.5m에서 풍속이 매우 작았기 때문에 소숫점 2번째 자리의 차이라고 해도 큰 오차로 나타났다. 작물형상의 기하학적 복잡성이 매우 큰 것을 고려한다면 오차범위는 매우 양호한 것으로 판단된다. 온실내 1m높이에서 평균온도의 CFD 평균오차는 2.2%로 나타났고, 최대편차는 5.5%이었다. 온실내 바닥으로부터의 복사열 발생량의 차이로 인하여 온실내 동쪽 지역에 상대적으로 큰 오차가 발생하였다. 외기 상대습도가 44%일 때, CFD상대습도의 오차는 2.1%이었으며, 최대 오차는 -3.8%이었다. 식물군의 공기유동저항, 식물군의 수분 및 열평형 모델을 추가하여 보다 사실적인 CFD모델을 설계하였다. CFD 모델의 설계방법이 정립되었기 때문에, 추후에 온실내 다른 작물의 미기상 및 이의 온실내 기상에 미치는 영향 등을 정량적으로 분석할 수 있게 되었다. 또한 작물의 적정생육환경에 주요 대상이면서도 동시에 센서설치의 어려움 등으로 인하여 연구에 어려움이 많았던 작물군내 미기상을 연구할 수 있는 토대를 마련하였다.

이상기후대비 노후저수지 홍수 대응을 위한 사전방류 기술개발 및 평가 (Development and assessment of pre-release discharge technology for response to flood on deteriorated reservoirs dealing with abnormal weather events)

  • 문수진;정창삼;최병한;김승욱;장대원
    • 한국수자원학회논문집
    • /
    • 제56권11호
    • /
    • pp.775-784
    • /
    • 2023
  • 최근 이상기후로 수공 구조물의 설계빈도를 상회하는 극한호우의 증가 경향이 뚜렷함에 따라 과거에 설계된 농업용 저수지의 안전성 검토가 필요하다. 그러나 한국농어촌공사 관할 일정 규모 이상의 저수지를 제외한 지자체 관리 저수지는 비상시 긴급 방류가 가능 저수지는 전무하다(13,685개소). 이러한 경우 이동식 사이펀을 현장에 빠르게 투입하여 사전 방류하는 방법이 긴요하며, 본 연구에서는 사전 및 긴급방류 기능을 동시에 수행할 수 있는 직경 200 mm, 최소 수위차 6 m, 420(m2/h), 10,000(m2/day)의 이동식 사이펀을 경주시 유금저수지를 대상으로 적용 가능성을 평가하였다. 테스트베드인 유금 저수지는 1945년 준공되어 공용기간이 78년 정도 경과한 시설물로 수문학적 안정성 분석 결과 현재 댐마루 구간의 최저높이는 27.15(EL.m)로 검토 홍수위 27.44(EL.m) 보다 0.29 m 낮아 제방을 통한 월류 가능성이 있고 여유고도 1.72 m 부족한 것으로 나타나 수문학 안전성을 확보하지 못하는 것으로 검토되었다. 유금저수지는 수위-유량 계측이 주기적으로 이루어진지 얼마 되지 않아 저수지의 수위-유량 관계 곡선식을 명확하게 확립하기 어려워 수위-용적 곡선을 임의로 도출하였으며 도출된 곡선을 기반으로 중소규모 노후저수지 운영 알고리즘을 통해 사전방류시간, 여수로 방류량을 고려하고 빈도별 홍수량에 따른 저수지 월류시간을 예측함으로써 사전에 대피 시간을 확보하고 붕괴위험을 저감할 수 있는 기술을 확보하였다. 직경 200 mm 이동식사이펀 1열 기준, 30년 빈도 홍수량 유입 시 상한수위 기준 80% 수준(약 30,000 m2)을 유지하면서 주민대피 시간(약 1시간)을 확보할 수 있는 최적 사전방류시간은 12시간 이전으로 분석되었다. 중소규모 노후저수지를 대상으로 사이펀 활용 사전방류기술 및 저수지 운영 알고리즘에 따라 이상기후 대비 사전에 방류를 시행하고 관리자의 의사결정을 돕는다면, 저수지 붕괴 위험지역 내의 주민들의 안전을 확보하고 주민대피 지원체계 구축을 통해 주민들의 불안감 해소, 저수지 위험상황 시 위험회피 수단 제공으로 위험요소 감소가 충분히 가능하다.