• Title/Summary/Keyword: cost structure

Search Result 3,854, Processing Time 0.028 seconds

Nonlinear Structure-Soil Interaction Analysis for the Suction Bucket Foundation of Offshore Wind-Turbine (해상풍력 석션버켓 기초 구조-지반 상호작용 비선형 구조해석 및 실험결과 비교)

  • Jin, Jeongin;Kim, Donghyun;Jung, Minuk
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.469-475
    • /
    • 2016
  • As we are facing the shortage of oil energy, studies on renewable energy, wind energy research has been naturally getting attention. Among wind energies, ocean wind energy is relatively abundant compared to land wind energy and therefore, is getting much attention in terms of its efficiency. However, the problem is the cost. Generally, the cost ratio of the supporting structure is over 25% of the total installation cost of a offshore wind turbine system. Thus, it is very important to reduce the total installation cost of the offshore wind turbine and develop accurate analysis methodology for various offshore wind turbine foundations. In this study, nonlinear structure-soil interaction analyses have been proposed and conducted for the typical suction bucket model of an offshore wind turbine foundation, and the results were compared with experimental test data for numerical validations.

A Model of Work Breakdown Structure for being applied to Historical Data in BTL Project for Educational Facilities (교육시설 BTL 사업의 실적공사비 적용을 위한 작업분류체계(WBS) 구축)

  • Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.499-502
    • /
    • 2007
  • The government abolished the existing method to calculate the construction price by the quantity take-off and pricing. It has introduced a new estimating system which uses the actual cost data on the basis of actual contract unit price. However, in the case of the current method to calculate the estimate price of BTL educational facilities, it is difficult to prepare an accurate ground for calculating unit prices due to a lack of standardized work breakdown structure (WBS) and guidelines for the detailed bidding documents. Thus, this research aims to establish WBS using the actual construction price on the basis of the actual bidding documents for the previous construction of BTL educational facilities. This specific WBS can be differentiated from the general WBS which is not suited for construction of the educational facility. It makes possible to build the construction information classification system and it helps to systemize the maintenance and repair cost items.

  • PDF

Step-up Switched Capacitor Multilevel Inverter with a Cascaded Structure in Asymmetric DC Source Configuration

  • Roy, Tapas;Bhattacharjee, Bidrohi;Sadhu, Pradip Kumar;Dasgupta, Abhijit;Mohapatra, Srikanta
    • Journal of Power Electronics
    • /
    • v.18 no.4
    • /
    • pp.1051-1066
    • /
    • 2018
  • This study presents a novel step-up switched capacitor multilevel inverter (SCMLI) structure. The proposed structure comprises 2 unequal DC voltage sources, 4 capacitors, and 14 unidirectional power switches. It can synthesize 21 output voltage levels. The important features of the proposed topology are its self-voltage boosting and inherent capacitor voltage balancing capabilities. Furthermore, a cascaded structure of the proposed SCMLI with an asymmetric DC voltage source configuration is presented. The proposed topology and its cascaded structure are compared with conventional and other recently developed topologies in terms of different aspects, such as the required components to produce a specific number of output voltage levels, the total standing voltage (TSV) and peak inverse voltage of the structure, and the maximum number of switches in the conducting path. Furthermore, a cost function is developed to verify the cost-effectiveness of the proposed topology with respect to other topologies. The TSV of the proposed topology is significantly lower than those of other topologies. Moreover, the developed topology is cost-effective compared with other topologies. A detailed operating principle, power loss analysis, and selection procedure for switched capacitors are presented for the proposed SCMLI structure. Extensive simulation and experimental studies of a 21-level inverter structure prove the effectiveness and merits of the proposed SCMLI.

Medical Expenses Structure on Hospitalized Patients of an Oriental Medical University Hospital (한방병원 입원환자의 진료비 구조 분석)

  • 서미경;이석구
    • Health Policy and Management
    • /
    • v.6 no.2
    • /
    • pp.115-130
    • /
    • 1996
  • This study was performed to investigate the practical oriental medical expenses by the use of internal data of an oriental hospital due to the bias of medical insurance program data. The purpose of this study was to describe prevalent diseases of clinical department in the studied hospital, to analyze medical expenses structure and to verify the each cost share ration of expenses on insurer to insuree. Under this purpose, we analyzed actual medical expenses data of 1,611 hospitalized patients of the oriental medical university hospital with 150 beds that can be approached to internal data from Jan. 1, 1994 to Dec. 31, 1994. The major findings are as follows : 1. Upper five of most frequent diseases of admitted patients were Joul-Jung-Pung(55.5%), Yoo-Kak-Tong(7.3%), Yoo-/Tong(7.1%), Gu-An-Wa-Sa(2.7%) and sequale of Joul- Jung-Pung(2.4%) 2. In medical expenses structure, hospital ward fee was 47.1%, medication fee 41.3%, fee for procedure(acupuncture, moxibustion, negative therapy, physical therapy, etc) 11.1% and consultation fee 0.5%. In addition to the cost share ration of insuree & that of insurer was 75:25 respectly.

  • PDF

Strut as a Permanent System using Composite Beams (층고절감형 거더를 이용한 영구 스트러트 공법)

  • Hong, Won-Kee;Park, Seon-Chee;Kim, Jin-Min;Lee, Ho-Chan
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.87-92
    • /
    • 2008
  • Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.

Three-dimensional structural design based on cellular automata simulation

  • Kita, E.;Saito, H.;Tamaki, T.;Shimizu, H.;Xie, Y.M.
    • Structural Engineering and Mechanics
    • /
    • v.23 no.1
    • /
    • pp.29-42
    • /
    • 2006
  • This paper describes the design scheme of the three-dimensional structures based on the concept of the cellular automata simulation. The cellular automata simulation is performed according to the local rule. In this paper, the local rule is derived in the mathematical formulation from the optimization problem. The cell density is taken as the design variable. Two objective functions are defined for reducing the total weight of the structure and obtaining the fully stressed structure. The constraint condition is defined for defining the local rule. The penalty function is defined from the objective functions and the constraint condition. Minimization of the penalty function with respect to the design parameter leads to the local rule. The derived rule is applied to the design of the three-dimensional structure first. The final structure can be obtained successfully. However, the computational cost is expensive. So, in order to reduce the computational cost, the material parameters $c_1$ and $c_2$ and the value of the cell rejection criterion (CRC) are changed. The results show that the computational cost depends on the parameters and the CRC value.

Time-Dependent Degradation Model and Maintenance Cost of Rail line PC Beam Bridge in Project Level (Project level에서의 철도 PC Beam교량의 경년열화모델구성 및 유지관리비용 추정)

  • Kwon, Se-Gon;Park, Mi-Yun;Do, Jeong-Yun;Kim, Do-Kie
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.17-22
    • /
    • 2008
  • Construction project have extremely high risk in the process of construction owing to unexpected event, like as design amendment. As a result, owner have to endure enormous extra-cost to control the risk and continue to the project having more higher uncertainty. Also, if the structure is completed, it is needed that the structure is protected and maintained continuously during life cycle time to satisfying original aim of structure itself. LCC analysis to calculate cost of structure alternatives divides into two stage, one is design_LCC and the other is maintenace_LCC. But two stages all is needed in the transition deterioration model to calculate more reasonable LCC analysis. This paper developed the model using analysis of FMS contents and survey from professional about Prestressed concrete beam girder bridge(PC Beam bridge)in railway. The model is focused in project level of PC beam because any condition state information for element level analysis can not get up. This paper is intended to use the developed model in LCC analysis of PC Beam bridge in railway and constitute the foundation to perform more deep study in the near future.

  • PDF

Introduction to Utilization Review (의료이용심사에 대한 소고)

  • Shin, Euichul
    • Quality Improvement in Health Care
    • /
    • v.12 no.2
    • /
    • pp.75-83
    • /
    • 2006
  • Background : Utilization review has been adopted as a vehicle for cost and utilization control of health care services. Its role was further stressed and expanded through the establishment of Health Insurance Review Agency in 2001. This article is to introduce concept, activities, and effect of utilization review based on the experiences of U.S. and to suggest important characteristics for ideal utilization review activities at the national level in Korea. Method : Twenty-five articles related with utilization review were reviewed after being selected through web site search through Med Line and Richis. Result : Utilization review was introduced mainly for health care expenditure control either by insurer, provider or the third parties under the pressure of increasing health care cost. It's activities can be categorized to prospective, concurrent and retrospective review according to the time of service provision. Based on most of studies, utilization review has been effective in controling rising health care cost and utilization. However it's effectiveness assumes a reimbursement structure of managed care like capitation payment. More worse, it is still unknown it's effectiveness on quality of care. Conclusion : Utilization review should be employed to increase the cost effectiveness of medical care by optimizing quality and patient's outcomes while also attempting to reduce the use of resources. So, it should consider outcomes before expenditures, check for both under and over-use, and construct an structure in which consumption is reduced equitably. Aggressive adoption of utilization review in Korean health care setting with fee-for-service reimbursement structure might not be a cost-effective approach before adoption of prospective payment system such as D.R.G. and capitation.

  • PDF

A Study on Cost-Effectiveness Evaluation and Optimal Design of ant dampers for Cable-Stayed Bridges (사장교에 장착된 MR 댐퍼의 비용효율성 평가 및 최적설계 연구)

  • Park, Won-Suk;Hahm, Dae-Gi;Koh, Hyun-Moo;Park, Kwan-Soon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.10 no.6 s.52
    • /
    • pp.47-56
    • /
    • 2006
  • A method is presented for evaluating the economic efficiency of a semi-active magneto-rheological (MR) damper system for cable-stayed bridges under earthquake loadings. An optimal MR damper capacity maximizing the cost-effectiveness is estimated for various seismic characteristics of ground motion. The economic efficiency of MR damper system is addressed by introducing the life-cycle cost concept. To evaluate the expected damage cost, the probability of failure is estimated. The cost-effectiveness index is defined as the ratio of the sums of the expected damage costs and each device cost between a bridge structure with the MR damper system and a bridge structure with elastic bearings. In the evaluation of cost-effectiveness, the scale of damage cost is adopted as parametric variables. The results of the evaluation show that the MR damper system can be a cost-effective design alternative. The optical capacity of MR damper is increased as the seismic hazard becomes severe.

Vibration Control and Cost-Effectiveness Evaluation of Cable-Stayed Bridges with Semi-Active Control System (준능동 제어시스템을 이용한 사장교의 진동제어 및 비용효율성 평가)

  • Hahm, Dae-Gi;Ok, Seung-Yong;Park, Wonsuk;Koh, Hyun-Moo;Park, Kwan-Soon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.9 no.4 s.44
    • /
    • pp.43-54
    • /
    • 2005
  • This paper presents cost-effectiveness evaluation of semi-active control system for cable-stayed bridge under earthquake excitations with various magnitudes and frequency contents. Semi-active control system, which is operated by using Bi-stale control method on the basis of linear quadratic Gaussian (LQG) optimal controller, is designed for the benchmark control problem proposed by Dyke et at. The cost-effectiveness of the proposed control system is defined by the ratio of life-cycle costs between a bridge structure with shock transmission units and a bridge structure with the semi-active control devices. The simulated results show that the damper cost has little influence on the cost-effectiveness of the semi-active control system while the cost-effectiveness is quite sensitive to the damage cost induced by the bridge failure. It is also found that the semi-active control system guarantees relatively high cost-effectiveness for the cable-stayed bridge subject to the ground motions in the regions of moderate seismicity with soft soil condition and strong seismicity with stiff soil condition.