DATA MININING APPROACH TO PARAMETRIC COST ESTIMATE IN EARLY DESIGN STAGE AND ANALYTICAL CHARACTERIZATION ON OLAP (ON-LINE ANALYTICAL PROCESSING)

  • JaeHo Cho;HyunKyun Jung;JaeYoul Chun
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.176-181
    • /
    • 2011
  • A role of cost modeler is that of facilitating design process by the systematic application of cost factors so as to maintain sensible and economic relationships between cost, quantity, utility and appearance. These relationships help to achieve the client's requirements within an agreed budget. The purpose of this study is to develop a parametric cost estimating model for the early design stage by using the multi-dimensional system of OLAP (On-line Analytical Processing) based on the case of quantity data related to architectural design features. The parametric cost estimating models have been adopted to support decision making in the early design stage. These models typically use a similar instance or a pattern of historical case. In order to effectively use this type of data model, it is required to set data classification and prediction methods. One of the methods is to find the similar class in line with attribute selection measure in the multi-dimensional data model. Therefore, this research is to analyze the relevance attribute influenced by architectural design features with the subject of case-based quantity data used for the parametric cost estimating model. The relevance attributes can be analyzed by Analytical Characterization. It helps determine what attributes to be included in the OLAP multi-dimension.

  • PDF

A Study on 3D Data Model Development by Normalizing and Method of its Effective Use - Focused on Building Interior Construction - (정규화를 통한 3차원 데이터 모델 구축 및 활용성 향상 방안 연구 -건축 마감 공사 중심으로 -)

  • Lee, Myoung-Hoon;Ham, Nam-Hyuk;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.11-18
    • /
    • 2010
  • Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.

Panel Data Analysis between Flood Damage and Recovery Cost (Panel Data 분석을 통한 홍수피해와 복구비 관계분석)

  • Park, Doo-Ho;Kim, Sun-Young
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • This paper addresses the correlation between the flood damage cost and recovery cost. National data (15 regions) for 20 years, panel data, has been analyzed for this test. Model specification of panel data analysis depends on the characteristics of data set and "fixed" or "random" effects model can be used. The results are represented in both models. As we expected all independent variables show positive relationship with recovery cost, except for the number of death and suffers. The damage of public facilities, such as rivers and road are the major factors on the damage and recovery cost, which means that flood damage can not be decreased without decreasing damages of public facilities from floods. Especially, the recovery cost is always higher than the damage cost and investment for flood control. Unlikely, government investment for flood control is the highest and recovery cost is the always lower than da mage cost andinvestment in Japan. Which means that proper investment can reduce economic damage cost of flood and recovery cost.

A Function Point Model for Measuring the Development Cost of Information Services using Wireless Data Broadcast

  • Seokjin Im
    • International journal of advanced smart convergence
    • /
    • v.13 no.1
    • /
    • pp.12-22
    • /
    • 2024
  • Software applications have a huge and inseparable impact on our lives. The complexity of the applications increases rapidly to support high performance and multifunction. Accordingly, the cost model for applications is increasingly important. Line of Code (LOC) and Man-Month (M/M) as the cost model measure the quantitative sides of the applications. Unlike them, Function Point (FP) measures the functionalities of the application. FP is efficient for estimating qualitative characteristics, but it is restricted to measuring the cost of an application using the wireless data broadcast which can support any number of clients. In this paper, we propose, a Function Point model for Information services using wireles data Broadcast (FPIB) to measure the development cost of an application that serves using the wireless data broadcast environment. FPIB adopts critical parameters of the wireless broadcast environment and the complexity of them to measure effectively the cost developing the application. Through the evaluation comparing the proposed FPIB with FP, we reveal the effectiveness of the proposed FPIB.

A Study on Developing a CER Using Production Cost Data in Korean Maneuver Weapon System (한국형 기동무기체계 양산비 비용추정관계식 개발에 관한 연구)

  • Lee, Doo-Hyun;Kim, Gak-Gyu
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.39 no.3
    • /
    • pp.51-61
    • /
    • 2014
  • In this paper, we deal with developing a cost estimation relationships (CER) for Korean maneuverable weapons systems using historical production cost. To develop the CER, we collected the historical data of the production cost of four tanks and five armored vehicles. We also analyzed the Required Operational Capability (ROC) of the weapons systems and chose cost drivers that can compare operational capabilities of the weapons systems We used Forward selection, Backward selection, Stepwise Regression and $R^2$ selection as the cost drivers which have the greatest influence with the dependent variables. And we used Principle Component Regression, Robust Regression and Weighted Regression to deal with multicollinearity and outlier among the data to develop a more appropriate CER. As a result, we were able to develop a production cost CER for Korean maneuverable weapons systems that have the lowest cost errors. Thus, this research is meaningful in terms of developing a CER based on Korean original cost data without foreign data and these methods will contribute to developing a Korean cost analysis program in the future.

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Sensititivity Analysis For Development Of Gulf Of Alaska

  • Pak, Ee-Tong
    • 한국해양학회지
    • /
    • v.11 no.2
    • /
    • pp.57-63
    • /
    • 1976
  • It was attempted to analyze the sensitivity of the oil prospect place named MARIA which placed inside Gulf of Alaska. For the analysis, P6031090, ECOANA( computer) which installed in the head office, Shell Oil Co was used and the data needed for computer programming were 1) Unit of Production data 2) Production Schedule 3) Total Gross Yearly Expenses and 4) Total Gross Capital and so on. The important data among the computer output 1) PVPAT (Present Value After Tax): $1,167,077,500 2) Payout After Tax: 3.14 Years (256,284,810 BBL Production) 3) Earning Power: 42% (After Tax) 4) PVPAT/BBL : $1.22 5) Capital/BBL : $2.00. On the other hand, the effect acted upon PVPAT with varying the Platform cost, Facility cost, Pipeline cost and Well cost was observed in comparion with the basic for range from 50% to 200%. Resultantly, the order was 1) Pipeline cost 2) Facility cost 3) Well cost 4) Platform cost for range form 100% to 200%. This project was completed by the contract with Shell Oil Co., and the geological data needed for this analysis were given by the head office and the development project started from Jan. 1976.

  • PDF

Grid Map Building and Sample-based Data Association for Mobile Robot Equipped with Low-Cost IR Sensors (저가 적외선센서를 장착한 이동로봇에 적용 가능한 격자지도 작성 및 샘플기반 정보교합)

  • Kwon, Tae-Bum;Song, Jae-Bok
    • The Journal of Korea Robotics Society
    • /
    • v.4 no.3
    • /
    • pp.169-176
    • /
    • 2009
  • Low-cost sensors have been widely used for mobile robot navigation in recent years. However, navigation performance based on low-cost sensors is not good enough to be practically used. Among many navigation techniques, building of an accurate map is a fundamental task for service robots, and mapping with low-cost IR sensors was investigated in this research. The robot's orientation uncertainty was considered for mapping by modifying the Bayesian update formula. Then, the data association scheme was investigated to improve the quality of a built map when the robot's pose uncertainty was large. Six low-cost IR sensors mounted on the robot could not give rich data enough to align the range data by the scan matching method, so a new sample-based method was proposed for data association. The real experiments indicated that the mapping method proposed in this research was able to generate a useful map for navigation.

  • PDF

Factors Clustering Approach to Parametric Cost Estimates And OLAP Driver

  • JaeHo, Cho;BoSik, Son;JaeYoul, Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.707-716
    • /
    • 2009
  • The role of cost modeller is to facilitate the design process by systematic application of cost factors so as to maintain a sensible and economic relationship between cost, quantity, utility and appearance which thus helps in achieving the client's requirements within an agreed budget. There are a number of research on cost estimates in the early design stage based on the improvement of accuracy or impact factors. It is common knowledge that cost estimates are undertaken progressively throughout the design stage and make use of the information that is available at each phase, through the related research up to now. In addition, Cost estimates in the early design stage shall analyze the information under the various kinds of precondition before reaching the more developed design because a design can be modified and changed in all process depending on clients' requirements. Parametric cost estimating models have been adopted to support decision making in a changeable environment, in the early design stage. These models are using a similar instance or a pattern of historical case to be constituted in project information, geographic design features, relevant data to quantity or cost, etc. OLAP technique analyzes a subject data by multi-dimensional points of view; it supports query, analysis, comparison of required information by diverse queries. OLAP's data structure matches well with multiview-analysis framework. Accordingly, this study implements multi-dimensional information system for case based quantity data related to design information that is utilizing OLAP's technology, and then analyzes impact factors of quantity by the design criteria or parameter of the same meaning. On the basis of given factors examined above, this study will generate the rules on quantity measure and produce resemblance class using clustering of data mining. These sorts of knowledge-base consist of a set of classified data as group patterns, of which will be appropriate stand on the parametric cost estimating method.

  • PDF

Computerization for Management of Street Tree Using CAD (CAD를 이용한 가로수 관리 전산화에 관한 연구)

  • 허상현;심경구
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.2
    • /
    • pp.68-76
    • /
    • 2001
  • The purpose of this study is to computerize street tree management using a CAD program in order to manage the drawing record of street trees systematically and concurrently. The configuration of this program is composed of Reference Data, Data Inquiry, and Cost Assessment. The Reference Data includes characteristics of trees, monthly managements records, damage by blight and insects and usage of pesticides. The Data Inquiry includes an individual search of the tree index, simple searches and multiple searches. The Cost Assessment includes two main components, the data input with labor cost, manure ocst and pesticide cost and the assesment of management cost for prevention of blight and insects, pruning and fertilization. The results of this study are as follows: 1) When there are practices such as transplanting and removing of street trees it is immediately updated with the various situation. By creating an in progress a tree management system, up to the date information can be given to the manager for decision making. 2) To identify individual tree at the site or in drawing, the street name and numbers were used instead of coordinates. Tree tags are attached to the street trees individually. It can make DB management simple and easy. 3) By doing simple or multiple search with constructed DB, data can be provided quickly. 4) The result of this type of search are useful in the assessment of management cost very useful in regards to items such as the pruning, pesticides scattering and fertilization. 5) By using the AutoCAD software and existing PC without purchasing new equipment, the cost of system implementation can be minimized.

  • PDF