• Title/Summary/Keyword: cost calculation

Search Result 1,038, Processing Time 0.028 seconds

A Study on the Probabilistic Production Cost Calculation by the Developed EIGC Method. (확장된EIGC법에 의한 확업적 발전비 게산에 관한 연구)

  • 송길영;최재석;김용하
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.36 no.12
    • /
    • pp.839-847
    • /
    • 1987
  • The probabilistic production cost is calculated by the Expected Incremental Generation Cost Curve(EIGC) method based on the multi-state and multi-block operating conditions. For this, A new algorithm for determining production cost by the EIGC and the generation availability curve (GAC) had been developed in order to realize better economic olad dispatch and better reliability for power system operation. The simpler method for determining the EIGC and the GAC is proposed for convenience and saving in computation time.

  • PDF

Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation (물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안)

  • Jeong, Ki-Chang;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.540-545
    • /
    • 2008
  • The purpose of this study is to suggest problems and improving plan of process of calculating escalation rate of the Historical Cost by price fluctuation. In order to implement this research, we analyzed problems by calculating the rate of price fluctuation with Historical Cost and measurement applying method making on-site with historical cost data were included as samples and suggested improving plan to the adjustment of contract cost. The results of research according to this are same as followings:1) Of all construction details, it is more appropriate to calculate price fluctuation by applying measurement method to the contents of historical cost unit. 2) To avoid confusion in calculating method, it was indicated that amendment in part should be achieved in order to calculate by measuring the part of calculating escalation rate of Historical Cost at related law and regulation.

  • PDF

The Development and Simulation of Training Cost Estimating Model for the Operation of the Nurse Residency Program (신규간호사 교육 프로그램(Nurse Residency Program) 운영을 위한 교육비용 산출 모형 개발 및 모의 적용)

  • Jung, Hanna;An, Shinki
    • Korea Journal of Hospital Management
    • /
    • v.25 no.4
    • /
    • pp.60-75
    • /
    • 2020
  • Purpose: This study aims to develop a cost model for NRP (Nursing Residency Program) operation and ultimately provide evidence for financial factors for NRP operation in the future by simulating a cost model. Methodology: This study developed a model for the NRP education cost calculation model based on the review of Hansen's model, which has systematically reported on the development and operation of NRP, and discussions with nursing education experts at a university-affiliated hospital. With the simulation, it was intended to predict nurses' supply and demand in the long term and to calculate changes in long-term education costs. Findings: Firstly, turnover model, term model, cost model necessary for calculating a model for the NRP education cost calculation model was set up. Secondly, the simulation showed the following results; 1) the proportion of newly graduated nurses less than 5 years of working decreases gradually over time, which will make the composition of nurses more balanced. 2) In the first year of the partial introduction of NRP, the cost of training new nurses was about 2.1 times higher than before. After the introduction, the training cost in the 13th year began to be lesser than before the introduction, and in the 25th year, it decreased by 28.1% compared to before the introduction. Practical Implications: Firstly, NRP would be an effective way to solve the higher turnover and frequent departure of new nurses and the imbalance of nurses' composition. Secondly, although the costs of NRP are incurred in the early stages, in the end, NRP training costs are reduced compared to before the introduction of NRP. It is necessary to systematically understand the contribution effect of NRP by analyzing the economic value of NRP considering financial and non-monetary returns in the future and providing a basis for decision-making related to NRP implementation.

Development of Nursing Activity Cost Calculation Program Using Time-Driven Activity-Based Costing (TD-ABC) (병동 간호활동 원가계산 프로그램 개발 :시간동인 활동기준원가계산 기반으로)

  • Lim, Ji Young;Kang, Sung Bae;Lee, Hyun Hee
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.4
    • /
    • pp.480-494
    • /
    • 2018
  • The purpose of this study is to develop a nursing activity cost calculation program based on Lee's doctoral dissertation using TD-ABC. The developed program has been supplemented with data storage, print out, and graph conversion functions to expand the application possibility. The development of the program consisted of three steps: program requirements analysis, program design and development, and program validation. This program was designed not only to do the cost calculation, but also to compare the cost-effectiveness and cost consumption trends. Consequently, this program is meaningful in that the nursing manager can obtain the cost information necessary for nursing unit management and extend the utilization so that the cost management strategy can be established based on the cost information. Therefore, we propose that the cost-management capacity of clinical nurses should be strengthened and the nursing performance measurement research should be expanded by applying it to various actual clinical nursing management settings. It is suggested that this program should be used as a training medium to strengthen nurse cost management capacity by combining nursing management curriculum at undergraduate level.

Evaluation of reaction site prediction in 3-ring PAHs according to calculation level

  • Lee, Byung-Dae
    • Journal of the Korean Applied Science and Technology
    • /
    • v.39 no.4
    • /
    • pp.535-541
    • /
    • 2022
  • The radical reaction position was calculated by varying the calculation level for ACEL and ANT, which are detected with the highest frequency and concentration in PAHs pollution sites. The results of each calculation level were compared and evaluated with the existing literature. HF, B3LYP, B3LYP-D, and MP2 were used as the method for each level used for calculation. Except for HF, the MK charge by B3LYP, B3LYP-D, and MP2 was consistent with the experimental results. It was found that the dispersion effect was negligible in the calculation of ACEL and ANT because the calculation results by the B3LYP and B3LYP-D methods were the same. In particular, it was found that the MK charge calculation result by MP2 agrees well with the product/PAH ratio obtained as a result of the experiment. Considering the calculation cost, it would be preferable to use B3LYP to predict the radical reaction site of ACEL and ANT. However, considering the product/PAH ratio, it takes more time to calculate, but it is judged that it is better to use the MP2.

Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects (농어촌정비사업 공종별 실적공사비 적산시스템개발)

  • 김현영;이정재;김영기;오상원;전효묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.3
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Development of 3-D J-Integral Calculation Method for Structural Integrity Evaluation (기기 건전성 평가를 위한 3차원 J-적분 계산 전산코드 응용평가 연구)

  • Kim, Young-Jin
    • Proceedings of the KIEE Conference
    • /
    • 1999.11b
    • /
    • pp.450-454
    • /
    • 1999
  • In order to evaluate the integrity of nuclear power plants, J-integral calculation is crucial. For this purpose, finite element method is popularly used to obtain J-integral. However, high cost time consuming preprocess should be performed to design the finite element model of a cracked structure. Also, the J-integral should be verified by alternative method since it may differ depending on the calculation method. The objective of this paper is to develop a three-dimensional elastic-plastic J-integral analysis system which is named as EPAS. The EPAS program consists of an automatic mesh generator for a through-wall crack and a surface crack, a solver based on ABAQUS program, and a J-integral calculation program which provides DI(Domain Integral) and EDI(Equivalent Domain Integral) based J-integral calculation. Using the EPAS program, an optimized finite element model for a cracked structure can be generated and corresponding J-integral can be obtained subsequently.

  • PDF

Calculation of ESS Capacity of Industrial Customer through Economic Analysis (경제성 분석을 통한 산업용 수용가의 ESS 설치 용량 산정)

  • Hong, Jong-Seok;Chai, Hui-Seok;Moon, Jong-Fil
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.273-276
    • /
    • 2015
  • In this paper, ESS capacity installed in industrial customer is calculated using economic analysis. To do this, electric charge for industrial customer is analyzed and power management system(PMS) of ESS is selected. Reduction of kW cost and kWh cost are set to 'benefit' according to operation of ESS. Also, installation cost and maintenance cost of ESS are set to 'cost'. Proper ESS capacity is determined as a result of benefit-to-cost(B/C) analysis according to the variation of ESS installation cost. In case study, B/C is analyzed for the specific industrial customer and minimum capacity of ESS to make a profit are proposed for the customer.

Economic Analysis of the Piezoelectric Power using the California Standard Test (캘리포니아 표준 테스트 방법을 사용한 압전 발판의 경제성 분석)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.21 no.4
    • /
    • pp.51-56
    • /
    • 2017
  • The purpose of this study is to suggest economic analysis for piezoelectric power. Economic analysis method uses california standard test. Perspectives of california standard test is participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. This study identifies the cost and benefit components. This study identifies benefit-cost calculation procedures from four test : participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. In the economic analysis, the order of benefit cost ratio in piezoelectric power shows total resource cost test, program administrator cost test, ratepayer impact measure test and participant test.