• Title/Summary/Keyword: cost calculation

Search Result 1,038, Processing Time 0.025 seconds

Fundamental Rearch to Prepare a Direction to Improve the Design Fee Standard through Case Analysis (사례분석을 통한 설계대가 기준 개선 방향 마련 기초연구)

  • Han, Jae Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.179-180
    • /
    • 2020
  • In the budgeting guidelines, there are rules for calculating design fee and direct costs. However, only the design fee is calculated excluding the direct cost, which causes the cost to be insufficient. Therefore, this study is designed to analyze representative cases where direct costs are insufficient, draw out problems, and propose a way to improve design fees.

  • PDF

Development on Reconstruction Cost Model for Decision Making of Bridge Maintenance (교량 유지관리 의사결정 지원을 위한 개축비용 산정모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Lee, Min-Jae;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.533-542
    • /
    • 2016
  • The periodic maintenance of bridges is necessary once they have been constructed and its cost depends on various factors, such as their condition, environmental conditions and so on. To make a decision support system, it is essential to establish a basic reconstruction cost model. In this study, a regression model is suggested for calculating the reconstruction cost for typical cases and influential factors, depending on the type of bridge and its components, by analyzing the basic bridge specifications based on the data of the Bridge Management System (BMS). The details for each case were estimated in consideration of the cost calculation variables. The details for each case were estimated in consideration of the cost calculation variables. The cost model for the new construction of the superstructure, substructure and foundation and the temporary bridge construction and demolition costs were drawn from the regression analysis of the estimation results of typical cases according to the cost calculation variables. The reconstruction costs for different types of bridge were obtained using the cost model and compared with those in the literature. The cost model developed herein is expected to be utilized effectively in maintenance decision making.

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

Development of the Automated Calculation System for Air-Bearing Spindle (공기 베어링 주축의 자동설계시스템 개발)

  • Chernopyatov Y.A.;Chung W.J.;Dolotov K.S.;Kim D.S.;Lee C.M.
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.13 no.5
    • /
    • pp.38-48
    • /
    • 2004
  • Recently the use of high-speed equipment in machine-tool industry has greatly increased, which requires the development of prognostics and prediction methods on the design stage. Conversion of the test/experiments stage from real to virtual reality will not only significantly reduce the design and manufacturing cost, but will also increase design quality. This paper shows how it is possible to develop the automated system for the design calculations of the air-bearing spindles. First, the general calculation method is introduced. It contains several steps, namely, geometry identification, pressure calculation, stiffiness calculation, dynamics characteristics calculation. For geometry identification reducing spindle shaft to rings was proposed, which helps to automate the calculation process. For pressure calculation the Peshti method was implemented. For stiffiness calculation the analysis was made, which shown the necessity of correct calculation step selection. Then the system of ordinary differential equations containing influence coefficients was evolved, which is used for trjectories calculation. The graphical representation of the calculation results shows the dynamic behavior of the spindle unit concerning various working conditions. Finally, this automated system is illustrated by an example of the air-bearing spindle calculation.

Development of Internet Web Program for the Calculation of OPF and Congestion Cost (전력거래에서 최적조류계산과 혼잡비용 계산을 수행하는 인터넷 웹 프로그램 개발)

  • Lee, Kwang-Ho;Jung, Jae-Ok
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.6
    • /
    • pp.259-264
    • /
    • 2001
  • The electric utility industry around the world is undergoing a revolutionary transition from vertically integrated monopoly structures to a competitive structures. Competition in an open transmission access(OTA) makes the market participants access easily the transmission system in a non-discriminatory and equitable manner. The competitions of suppliers and customers make the electric market price change every hour. This paper presents a web program in the internet environment with a function of optimal power flow(OPF) calculation. The Web program gives the nodal marginal cost and the congestion charge using the shadow prices resulted from OPF. This web program is realized by a Perl and JAVA languages, and using the common gateway interface(CGI).

  • PDF

Development of New Job Classification Method in Job Elements Analysis for the Purpose of Human Cost Calculation in Hospitals

  • Numasaki, Hodaka;Harauchi, Hajime;Okura, Yasuhiko;Ishii, Atsue;Kasahara, Satoko;Monden, Morito;Sakon, Masato;Bando, Masako;Ohno, Yuko;Inamura, Kiyonari
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.492-494
    • /
    • 2002
  • We established the job classification method that a classification standard is clear, and can subdivide job by using the raw data of time-and-motion study performed to analyze the medical staffs job elements. The final target of this study is to optimize job allocation and calculate human cost of medical staffs in hospitals.

  • PDF

Parasitics analysis of a grounded bondwire for low-cost plastic packaging of microwave devices (초고주파소자의 저가 플라스틱 실장을 위한 접지된 본딩와이어의 기생특성 해석)

  • 윤상기;이해영
    • Journal of the Korean Institute of Telematics and Electronics D
    • /
    • v.34D no.2
    • /
    • pp.21-26
    • /
    • 1997
  • The dielectric effects on the parasitics of bondwires buried in slightly-lossy dielectric materials hav been investigated over a wide frequency range using the method of moments with incorporation of ohmic and dielectric losses. The FR-4 composite is widely used as a basis material for PCB and plastic packages, because of it sinherent electricl and chemical stbility and low cost. The cole-cole model, which is representative complex permittivity model of epoxy polymers, has been applied to consider the dielectric effects in the MoM calculation. The prasitic impedance of a grounded bondwire in FR-4 composite is greatly increased due to the dielectric loading effect enhanced by the radiation at high frequencies. These calculation results will be helpful for designing and packaging of high-frequency low-cost IC's.

  • PDF

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.2
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.

A Study on Calculation and Decomposition of Bus Incremental Cost on Power System Operation (계통운전상태에서의 모선증분비용 산정 및 분해에 관한 연구)

  • Kim, Y.H.;Lee, Buhm;Choi, S.K.;Moon, H.K;Lee, J.G.;Yeon, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.105-107
    • /
    • 2002
  • This paper provides calculation and decomposition of Bus Incremental Cost on Power System Operation. In this method we show deriving Shadow Price from state variables in Optimal condition. And the decomposition can give a detailed description of each Bus Incremental Cost. The proposed method is applied to IEEE-30 and results shows the effectiveness of the method.

  • PDF

Calculation of Breakeven Point for LNG-Heavy Oil Transfer of D Thermal Power Plant Considering $CO_2$ Emission Cost ($CO_2$ 배출비용을 감안한 D 발전소의 LNG-중유 연료교제 손익분기점 계산)

  • Jeong, Yeong-Ho;Lee, Sang-Joong;Lee, Gene-Kyu;Yang, Seong-Deog
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.65-67
    • /
    • 2008
  • Kyoto Protocol against global warming came into effect in Feb 2005. This paper presents a calculation $CO_2$ emission of D power plant for combusting LNG and heavy oil using the a, b, c coefficients obtained by the performance test. The authors also calculate the breakeven point of the fuel transfer from LNG to Oil considering recent $CO_2$ emission cost.

  • PDF