• Title/Summary/Keyword: cost breakdown system

Search Result 113, Processing Time 0.026 seconds

Cost Analysis of Construction Phase in Basement Composite Wall Form (지하 합벽 거푸집의 시공단계별 원가 분석에 관한 연구)

  • Choi, Oh-Young;Heo, Kyoung-Moo;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.189-195
    • /
    • 2009
  • Recently, the urban centralization phenomenon appears to be growing. As a result, many vigorous efforts for the use of underground space are being made. In particular, the basement depth of construction in the downtown area has deepened and construction is often done close to adjacent buildings. In this case, generally, the underground construction approach mainly used is the composite basement wall system. However, a cost analysis of the basement composite wall system does not exist. Therefore, in this study, the cost of the composite basement wall system was analyzed. The percentage breakdown of costs were: buttress work processes, 3% form work processes, 26% reinforcement work processes, 12% support work processes, 42% and other processes,17%. Accordingly, it will be necessary when developing new technology and construction methods to determine the development focus.

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

Project Informations Classification System for Civil Works (토목공사용 정보분류 코드체계의 개발)

  • Lee, Bae Ho;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.897-905
    • /
    • 1994
  • Project Informations Classification System (PICS) can be utilized as a springboard for advanced construction management techniques because it marries informations to networks and maintains a disciplined cost control. The present study attempts to develop a PICS which can be applied in construction management techniques. The frame work largely consists of the three parts such as: (i) development of the tentative Work Breakdown Structure with three divisions, facility calssifications, functional classifications and work classifications, covering the whole areas of civil works, (ii) development of the integrated informations system including the other informations in cost estimating and network scheduling, (iii) construction of relational database system for computer application. The system suggested in the study is found useful for the systematic and uniform management of construction works in the various stages.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

Reliability Allocation Model for KTX-II High Speed Train (KTX-II 고속 차량을 위한 신뢰도 할당 모델)

  • Lee, Kang-Won;Chung, In-Soo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.45-57
    • /
    • 2007
  • During the design phase of a system, which requires high reliability and safety such as aircraft, high speed train and nuclear power plant, reliability engineer must set up the target system reliability. To meet a reliability goal for the system, reliability allocation should be done gradually from the system to its element. For this end, first of all, we need to construct functional block diagram based on the design output and PWBS(Project Work Breakdown System). Another important input data for reliability allocation is the relationship between the cost and the reliability. In this study we investigate various reliability allocation models, which can be applicable to aircraft, vehicle, and power plant, and etc. And we suggest a proper reliability allocation model which can be effectively applicable to KTX-II high speed train to achieve the target system reliability.

  • PDF

Reliability Allocation Model for KTX-II High Speed Train (KTX-II 고속 차량을 위한 신뢰도 할당 모델)

  • Lee, Kang-Won;Chung, In-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.319-326
    • /
    • 2007
  • During the design phase of a system, which requires high reliability and safety such as aircraft, high speed train and nuclear power plant, reliability engineer must set up the target system reliability. To meet a reliability goal for the system, reliability allocation should be done gradually from the system to its element. For this end, first of all, we need to construct functional block diagram based on the design output and PWBS(Project Work Breakdown System). Another important input data for reliability allocation is the relationship between the cost and the reliability. In this study we investigate various reliability allocation models, which can be applicable to aircraft, vehicle, and power plant, and etc. And we suggest a proper reliability allocation model which can be effectively applicable to KTX-II high speed train to achieve the target system reliability.

A Case Study of Simulation-based Feasibility Analysis of Replacement of Inspection Equipment for Switchboards (시뮬레이션 기반 배전반 검사장비 교체의 타당성 분석에 관한 사례연구)

  • Han, Young Jin;Yi, Do Yoon;Hong, Jun Pyo;Joo, Sung Ho;Kim, Gi Min;Park, Jaehun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.1
    • /
    • pp.83-90
    • /
    • 2022
  • This study deals with replacement analysis of deteriorated equipment for improving productivity of production system. Frequent breakdown of the deteriorated equipment causes a situation that reduces productivity such as low product quality, process delay, and repair cost. However, the replacement of new equipment will be required a high initial investment cost, so it is important to analysis the economic feasibility. Therefore, we analyze the effect of the production system due to the aging effect of the equipment and the feasibility of equipment replacement based on the economic analysis. The process flow, working time, logistics movement, etc. are analyzed in order to build the simulation modeling for a ship and land switchboard production system. Using numerical examples, the economic feasibility analysis of equipment replacement through replacement of existing deteriorated equipment and additional arrangement of new facilities is performed.

A study on the efficient maintenance interval for the rolling-stocks (철도차량의 효율적인 정비주기에 관한 연구)

  • Yu, Yang-Ha;Jung, Jin-Tae;Kim, Ho-Soon;Kim, Dae-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1612-1617
    • /
    • 2011
  • Rolling stock needs many maintenance works because of its long service life. The maintenance of rolling stock has periodic preventive maintenance system. This periodic preventive maintenance system can't reflect the characteristics of every part. The condition-based maintenance system which reflects the functional condition of every part prevents breakdown and reduces maintenance cost. This study will analyze the records of every part by unreasonable examples of time-based preventive maintenance and reliability management activities, and discuss the necessity of maintenance system reflected the results.

  • PDF

Estimating Standards and Cost Data for Modernized Korean Hosing (Hanok) (신한옥 건설 특성을 반영한 표준품셈 개발)

  • Kim, Suji;Kim, Min;Lee, Yunsub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.66-75
    • /
    • 2016
  • As the demands for traditional Korean housing has been increased in recent years, modernized Korean traditional housing (Hanok) was developed as a way of providing Hanok for the public. Modernized Hanok attempts to remedy the shortcomings of the traditional hanok (i.e., high unit cost of building and low energy performance). In the previous researches, standardization and productivity improvement for modernized Hanok dissemination have been intensely developed. Above all, cost estimating for modernized Hanok is also an important factor. In an effort to provide effective system for Hanok construction, this paper developed 'standard cost data' for modernized Hanok. Distinct characteristic of modernized Hanok construction were analyzed first. Then, basic structure was identified, and major items were selected for Hanok standard cost data. However, this set of cost data was developed based on two mock-up Hanok projects actually constructed. Accordingly, this standard cost data will be further updated and modified by continuously accumulating real-world Hanok projects

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.